vault backup: 2025-08-15 14:15:41

This commit is contained in:
2025-08-15 14:15:42 -04:00
parent f583ee245c
commit 85d30c0a1e
5 changed files with 82 additions and 34 deletions
+2
View File
@@ -1 +1,3 @@
.obsidian/workspace.json
/.obsidian/plugins/recent-files-obsidian/data.json
+20 -24
View File
@@ -1,16 +1,32 @@
{
"recentFiles": [
{
"basename": "feeder-sizing",
"path": "feeder-sizing.md"
"basename": "feeders",
"path": "feeders.md"
},
{
"basename": "low-voltage",
"path": "low-voltage.md"
},
{
"basename": "misc-budgets",
"path": "misc-budgets.md"
},
{
"basename": "electrical",
"path": "electrical.md"
},
{
"basename": "README",
"path": "README.md"
},
{
"basename": "feeders",
"path": "feeders.md"
"basename": "full-takeoff",
"path": "full-takeoff.md"
},
{
"basename": "feeder-sizing",
"path": "feeder-sizing.md"
},
{
"basename": "psn-distribution-list",
@@ -24,10 +40,6 @@
"basename": "3-phase-power",
"path": "3-phase-power.md"
},
{
"basename": "full-takeoff",
"path": "full-takeoff.md"
},
{
"basename": "project-setup",
"path": "project-setup.md"
@@ -80,10 +92,6 @@
"basename": "monte-carlo-methods",
"path": "monte-carlo-methods.md"
},
{
"basename": "misc-budgets",
"path": "misc-budgets.md"
},
{
"basename": "new-hire",
"path": "new-hire.md"
@@ -152,10 +160,6 @@
"basename": "standalone-systems",
"path": "standalone-systems.md"
},
{
"basename": "low-voltage",
"path": "low-voltage.md"
},
{
"basename": "lighting-controls",
"path": "lighting-controls.md"
@@ -168,10 +172,6 @@
"basename": "fixture-designations",
"path": "fixture-designations.md"
},
{
"basename": "electrical",
"path": "electrical.md"
},
{
"basename": "distributed-antenna-systems",
"path": "distributed-antenna-systems.md"
@@ -195,10 +195,6 @@
{
"basename": "systems",
"path": "systems.md"
},
{
"basename": "telecom",
"path": "telecom.md"
}
],
"omittedPaths": [],
+33
View File
@@ -8,6 +8,39 @@ tags:
## Info
### Routing and Structural Considerations
#### Shear Walls
Shear walls, like those around stairwells and elevator shafts,
may be routed through with special permission.
#### Post-Tensioned Slabs
> [!example]
> STRUCTURAL SLAB IS AN 8-INCH THICK
> UNBONDED POST-TENSIONED TWO-WAY SLAB UNLESS NOTED OTHERWISE.
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza, pp.
> No affect on takeoff. Routing in slab still possible.
#### Pan Deck Slabs
> [!example]
> STRUCTURAL SLAB IS 3 1/2 INCHES OF NORMALWEIGHT CONCRETE
> ON 3-INCH COMPOSITE STEEL DECK UNLESS NOTED OTHERWISE.
> [!cite] Joel Jansen 2025-08-15, in reference to Belle Meade Plaza, pp.
> Do not route in slab.
### Formatting
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
> [!cite] Joel Jansen, in reference to Omni Hotels Raleigh, pp.
> It is acceptable to use typicals for identical feeders
> so long as the typical is in the Feeders `Area`
## Sequence
### 1. Estimate preparation
+13
View File
@@ -16,6 +16,19 @@ tags:
Not to be confused with [[telecom]].
### Routing
#### Exposed Ceilings
EMT to accessible space?
PVC to MDF?
#### Devices
#### Daisy Chaining
how many devices (if any)
## Sequence
### 1. Estimate preparation
+14 -10
View File
@@ -8,17 +8,22 @@ tags:
## Slab Deck
Create Area Typicals for every Concrete slab floor:
* `System` = "Electrical"
Create `area` Typicals for every concrete slab floor:
* 'All Building'
* 1 every level (Not Roof)
* HD: 1 Per Section
* 1 each level except roof
* **HD:** 1 per Section
* 'All Garage'
* 1 every level
* 1 each level
In each Typical:
* Takeoff: `ITEM DATABASE`/`MISC PDI PRODUCT`/`MISC MATERIAL - SLAB/DECK & FEEDER`/`MISC MATERIAL - SLAB/DECK (NAILS, PAINT, TAPE, ETC = $250)`
* 1 Takeoff each Typical, Count = 1
* 1 Takeoff each Typical
* _Count_ = 1
## Temporary Power & Lighting
@@ -31,7 +36,6 @@ System = "TPS - Temp Power Service (Site)"
BidItem = "1 - Site"
```
Hoxton Hotel (aka Nashville Hotel)
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - * SERVICE`
### Temp Lighting (Building)
@@ -44,11 +48,11 @@ BidItem = "3 - Building"
```
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
* _Count_ = Building Size = Total GSF - Garage GSF
* _Count_ = Building GSF = Total GSF - Garage GSF
Garden Styles:
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`TEMPORARY POWER - T POLE (EACH)`
* _Count_ = 1 per 150' per building
* _Count_ = 1 per 150ft per building
### Temp Lighting (Garage)
@@ -60,14 +64,14 @@ BidItem = "3 - Building"
```
* Takeoff: `ITEM DATABASE`/`TEMPORARY POWER`/`* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)`
* _Count_ = Garage SF
* _Count_ = Garage GSF
## Irrigation Pumps
```
Area = "2 - Site"
Phase = "Temp Power"
System = `MISC - Site Miscellaneous`
System = "MISC - Site Miscellaneous"
BidItem = "1 - Site"
```