vault backup: 2026-04-07 17:18:46
This commit is contained in:
@@ -22,3 +22,4 @@ yearly: "[[2026]]"
|
||||
* circle back
|
||||
* go from there
|
||||
* touch base
|
||||
* low hanging fruit
|
||||
|
||||
@@ -17,7 +17,7 @@ yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-04-07 07:21:00
|
||||
|
||||
> [!quote] [[how-to-measure-anything-in-project-management#Conflating Uncertainty with Knowing Nothing]]
|
||||
> [!quote] [[hubbard_2025_project-management#Conflating Uncertainty with Knowing Nothing]]
|
||||
> Some objections to providing probability estimates
|
||||
> seem to be based on the presumption
|
||||
> that if they don't know something exactly, they know nothing.
|
||||
@@ -27,11 +27,13 @@ yearly: "[[2026]]"
|
||||
> as opposed to whatever range represents their uncertainty,
|
||||
> however wide that range may be.
|
||||
|
||||
I would not be surprised to hear of an estimator responding this way
|
||||
even after Hubbard's calibration.
|
||||
Hubbard repeatedly conflates estimates of uncertain events
|
||||
with personal estimates of trivia questions with certain answers.
|
||||
These are functionally identical,
|
||||
but _feel_ very different.
|
||||
Hubbard could do better to correct this bias.
|
||||
Hubbard could do better to address this bias.
|
||||
|
||||
If you don't know the answer offhand,
|
||||
imagine it has been lost to time.
|
||||
|
||||
@@ -0,0 +1,26 @@
|
||||
---
|
||||
id: 2026-04-07T11:30:41-04:00
|
||||
aliases: []
|
||||
title: 2026-04-07 11:30:41
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
dg-publish: true
|
||||
date-created: 2026-04-07T11:30:41-04:00
|
||||
daily: "[[2026-04-07]]"
|
||||
weekly: "[[2026-W15]]"
|
||||
monthly: "[[2026-04]]"
|
||||
quarterly: "[[2026-Q2]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-04-07 11:30:41
|
||||
|
||||
## Feeder Wiring Method Selection
|
||||
|
||||
Relevant to [[feeders-takeoff]] and [[wiring-method-selection]]:
|
||||
|
||||
PVC is only an option if:
|
||||
* conduit size is not larger than allowed by slab thickness,
|
||||
* or either node is located on a slab-on-grade level.
|
||||
+3
-2
@@ -92,8 +92,9 @@ $$
|
||||
$$
|
||||
|
||||
where
|
||||
* $\Delta V$ = Voltage drop in volts ($V$)
|
||||
* $I$ = Current in amperes ($A$)
|
||||
* $\Delta V$ = Voltage drop in volts (V)
|
||||
* $I$ = Current in amperes (A)
|
||||
* $Z$ = Effective impedance in ohms
|
||||
* $L$ = Length of wire one way in feet ($\text{ft}$)
|
||||
|
||||
> [!important]
|
||||
|
||||
Reference in New Issue
Block a user