vault backup: 2026-04-07 17:18:46

This commit is contained in:
2026-04-07 17:18:46 -04:00
parent a840d436ac
commit 87cb763ea4
4 changed files with 34 additions and 4 deletions
+26
View File
@@ -0,0 +1,26 @@
---
id: 2026-04-07T11:30:41-04:00
aliases: []
title: 2026-04-07 11:30:41
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/periodic/timestamped
dg-publish: true
date-created: 2026-04-07T11:30:41-04:00
daily: "[[2026-04-07]]"
weekly: "[[2026-W15]]"
monthly: "[[2026-04]]"
quarterly: "[[2026-Q2]]"
yearly: "[[2026]]"
---
# 2026-04-07 11:30:41
## Feeder Wiring Method Selection
Relevant to [[feeders-takeoff]] and [[wiring-method-selection]]:
PVC is only an option if:
* conduit size is not larger than allowed by slab thickness,
* or either node is located on a slab-on-grade level.