vault backup: 2025-08-19 16:31:07
This commit is contained in:
+20
-20
@@ -1,5 +1,25 @@
|
||||
{
|
||||
"recentFiles": [
|
||||
{
|
||||
"basename": "feeders",
|
||||
"path": "feeders.md"
|
||||
},
|
||||
{
|
||||
"basename": "full-takeoff",
|
||||
"path": "full-takeoff.md"
|
||||
},
|
||||
{
|
||||
"basename": "material-pricing",
|
||||
"path": "material-pricing.md"
|
||||
},
|
||||
{
|
||||
"basename": "switchgear",
|
||||
"path": "switchgear.md"
|
||||
},
|
||||
{
|
||||
"basename": "README",
|
||||
"path": "README.md"
|
||||
},
|
||||
{
|
||||
"basename": "open-problems-in-estimating",
|
||||
"path": "open-problems-in-estimating.md"
|
||||
@@ -8,14 +28,6 @@
|
||||
"basename": "portable-tools",
|
||||
"path": "portable-tools.md"
|
||||
},
|
||||
{
|
||||
"basename": "README",
|
||||
"path": "README.md"
|
||||
},
|
||||
{
|
||||
"basename": "feeders",
|
||||
"path": "feeders.md"
|
||||
},
|
||||
{
|
||||
"basename": "low-voltage",
|
||||
"path": "low-voltage.md"
|
||||
@@ -28,10 +40,6 @@
|
||||
"basename": "electrical",
|
||||
"path": "electrical.md"
|
||||
},
|
||||
{
|
||||
"basename": "full-takeoff",
|
||||
"path": "full-takeoff.md"
|
||||
},
|
||||
{
|
||||
"basename": "feeder-sizing",
|
||||
"path": "feeder-sizing.md"
|
||||
@@ -60,10 +68,6 @@
|
||||
"basename": "assembly-objects",
|
||||
"path": "assembly-objects.md"
|
||||
},
|
||||
{
|
||||
"basename": "switchgear",
|
||||
"path": "switchgear.md"
|
||||
},
|
||||
{
|
||||
"basename": "bpm-award-analysis",
|
||||
"path": "bpm-award-analysis.md"
|
||||
@@ -195,10 +199,6 @@
|
||||
{
|
||||
"basename": "blank-system",
|
||||
"path": "blank-system.md"
|
||||
},
|
||||
{
|
||||
"basename": "subfeeds",
|
||||
"path": "subfeeds.md"
|
||||
}
|
||||
],
|
||||
"omittedPaths": [],
|
||||
|
||||
+12
-6
@@ -68,12 +68,14 @@ Locate:
|
||||
> All takeoffs in Systems with names including "site"
|
||||
> should be in "Site" Area, Phase, and Bid Item breakdowns.
|
||||
|
||||
For adjacent panels, use a minimum 10ft length.
|
||||
|
||||
#### Adders
|
||||
|
||||
Use the difference in elevation between equipment
|
||||
or 10ft, whichever is greater.
|
||||
|
||||
Add an additional 5ft for site runs
|
||||
Add an additional 5ft (total 15ft) for site runs
|
||||
(primaries, secondaries, etc.).
|
||||
|
||||
#### Primaries
|
||||
@@ -82,14 +84,18 @@ Empty conduit.
|
||||
|
||||
#### Secondaries
|
||||
|
||||
> [!info] Vaults and Secondary Connections
|
||||
> In utility vaults, secondary conductors sometimes run on racks,
|
||||
> far past their entrance conduits, to their transformers.
|
||||
> It is necessary to add this distance to the wire makeup,
|
||||
> rather than simply measure the conduit assembly to the transformer.
|
||||
##### Wiring on Vault Racks
|
||||
|
||||
Where secondary conductors run on racks in utility vaults
|
||||
manually set the length of conduit,
|
||||
measure the wire length,
|
||||
add 20ft in addition to previously mentioned adders.
|
||||
|
||||
#### Feeders
|
||||
|
||||
`Area` = "01 - Feeders/Risers Building"
|
||||
for all feeders, no matter the location.
|
||||
|
||||
#### Bus Duct
|
||||
|
||||
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`BUS DUCT`
|
||||
|
||||
@@ -35,3 +35,5 @@ Complete [[project-setup]].
|
||||
11. [[misc-budgets]]
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. [[material-pricing]]
|
||||
|
||||
@@ -0,0 +1,43 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- occupational
|
||||
---
|
||||
# Material Pricing
|
||||
|
||||
## Info
|
||||
|
||||
Use PDI and another vendor per the table below.
|
||||
PDI pricing takes precedence where available.
|
||||
|
||||
| State | Vendor |
|
||||
| ----- | ----------------------------- |
|
||||
| AZ | QED INC - 12535 |
|
||||
| CA | QED INC - 12535 |
|
||||
| CO | QED INC - 12535 |
|
||||
| DC | CAPITAL ELECTRIC - 14302 |
|
||||
| DE | CAPITAL ELECTRIC - 14302 |
|
||||
| FL | WORLD ELECTRIC SUPPLY - 45223 |
|
||||
| GA | WORLD ELECTRIC SUPPLY - 34243 |
|
||||
| MD | CAPITAL ELECTRIC - 14302 |
|
||||
| NC | WORLD ELECTRIC SUPPLY - 34243 |
|
||||
| NJ | COOPER ELECTRIC - 34860 |
|
||||
| NY | COOPER ELECTRIC - 34860 |
|
||||
| PA | CAPITAL ELECTRIC - 14302 |
|
||||
| SC | WORLD ELECTRIC SUPPLY - 34243 |
|
||||
| TN | WORLD ELECTRIC SUPPLY - 34243 |
|
||||
| TX | QED INC - 12535 |
|
||||
| VA | CAPITAL ELECTRIC - 14302 |
|
||||
| WA | QED INC - 12535 |
|
||||
|
||||
> [!important]
|
||||
> When updating, uncheck Update Supplier Code.
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
+9
-2
@@ -14,7 +14,7 @@ tags:
|
||||
2. In the drawings, locate:
|
||||
* Riser Diagrams
|
||||
* House Panels
|
||||
3. Copy over default Temporary Assemblies from ?
|
||||
3. Copy over default Temporary Assemblies from sandbox job
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
@@ -38,7 +38,6 @@ tags:
|
||||
* Meter
|
||||
* Fire Pump
|
||||
* Fire Pump Controller
|
||||
* SPD/TVSS
|
||||
|
||||
When building panelboards/switchboards,
|
||||
add terminations according to an example from the schedules.
|
||||
@@ -52,6 +51,14 @@ Items to Avoid:
|
||||
* Grounding
|
||||
* Elevator Room
|
||||
|
||||
#### SPD's/TVSS's
|
||||
|
||||
Labor only: ~1.5hrs
|
||||
|
||||
#### Panelboards
|
||||
|
||||
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
|
||||
|
||||
#### Enclosed Circuit Breakers
|
||||
|
||||
Treat as disconnect switch.
|
||||
|
||||
Reference in New Issue
Block a user