vault backup: 2025-08-19 16:31:07

This commit is contained in:
2025-08-19 16:31:07 -04:00
parent a6eb53a743
commit 88147463c9
5 changed files with 86 additions and 28 deletions
+20 -20
View File
@@ -1,5 +1,25 @@
{
"recentFiles": [
{
"basename": "feeders",
"path": "feeders.md"
},
{
"basename": "full-takeoff",
"path": "full-takeoff.md"
},
{
"basename": "material-pricing",
"path": "material-pricing.md"
},
{
"basename": "switchgear",
"path": "switchgear.md"
},
{
"basename": "README",
"path": "README.md"
},
{
"basename": "open-problems-in-estimating",
"path": "open-problems-in-estimating.md"
@@ -8,14 +28,6 @@
"basename": "portable-tools",
"path": "portable-tools.md"
},
{
"basename": "README",
"path": "README.md"
},
{
"basename": "feeders",
"path": "feeders.md"
},
{
"basename": "low-voltage",
"path": "low-voltage.md"
@@ -28,10 +40,6 @@
"basename": "electrical",
"path": "electrical.md"
},
{
"basename": "full-takeoff",
"path": "full-takeoff.md"
},
{
"basename": "feeder-sizing",
"path": "feeder-sizing.md"
@@ -60,10 +68,6 @@
"basename": "assembly-objects",
"path": "assembly-objects.md"
},
{
"basename": "switchgear",
"path": "switchgear.md"
},
{
"basename": "bpm-award-analysis",
"path": "bpm-award-analysis.md"
@@ -195,10 +199,6 @@
{
"basename": "blank-system",
"path": "blank-system.md"
},
{
"basename": "subfeeds",
"path": "subfeeds.md"
}
],
"omittedPaths": [],
+12 -6
View File
@@ -68,12 +68,14 @@ Locate:
> All takeoffs in Systems with names including "site"
> should be in "Site" Area, Phase, and Bid Item breakdowns.
For adjacent panels, use a minimum 10ft length.
#### Adders
Use the difference in elevation between equipment
or 10ft, whichever is greater.
Add an additional 5ft for site runs
Add an additional 5ft (total 15ft) for site runs
(primaries, secondaries, etc.).
#### Primaries
@@ -82,14 +84,18 @@ Empty conduit.
#### Secondaries
> [!info] Vaults and Secondary Connections
> In utility vaults, secondary conductors sometimes run on racks,
> far past their entrance conduits, to their transformers.
> It is necessary to add this distance to the wire makeup,
> rather than simply measure the conduit assembly to the transformer.
##### Wiring on Vault Racks
Where secondary conductors run on racks in utility vaults
manually set the length of conduit,
measure the wire length,
add 20ft in addition to previously mentioned adders.
#### Feeders
`Area` = "01 - Feeders/Risers Building"
for all feeders, no matter the location.
#### Bus Duct
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`BUS DUCT`
+2
View File
@@ -35,3 +35,5 @@ Complete [[project-setup]].
11. [[misc-budgets]]
### 3. Extension (Review and Checking)
1. [[material-pricing]]
+43
View File
@@ -0,0 +1,43 @@
---
id:
aliases: []
tags:
- occupational
---
# Material Pricing
## Info
Use PDI and another vendor per the table below.
PDI pricing takes precedence where available.
| State | Vendor |
| ----- | ----------------------------- |
| AZ | QED INC - 12535 |
| CA | QED INC - 12535 |
| CO | QED INC - 12535 |
| DC | CAPITAL ELECTRIC - 14302 |
| DE | CAPITAL ELECTRIC - 14302 |
| FL | WORLD ELECTRIC SUPPLY - 45223 |
| GA | WORLD ELECTRIC SUPPLY - 34243 |
| MD | CAPITAL ELECTRIC - 14302 |
| NC | WORLD ELECTRIC SUPPLY - 34243 |
| NJ | COOPER ELECTRIC - 34860 |
| NY | COOPER ELECTRIC - 34860 |
| PA | CAPITAL ELECTRIC - 14302 |
| SC | WORLD ELECTRIC SUPPLY - 34243 |
| TN | WORLD ELECTRIC SUPPLY - 34243 |
| TX | QED INC - 12535 |
| VA | CAPITAL ELECTRIC - 14302 |
| WA | QED INC - 12535 |
> [!important]
> When updating, uncheck Update Supplier Code.
## Sequence
### 1. Estimate preparation
### 2. Takeoff
### 3. Extension (Review and Checking)
+9 -2
View File
@@ -14,7 +14,7 @@ tags:
2. In the drawings, locate:
* Riser Diagrams
* House Panels
3. Copy over default Temporary Assemblies from ?
3. Copy over default Temporary Assemblies from sandbox job
### 2. Takeoff
@@ -38,7 +38,6 @@ tags:
* Meter
* Fire Pump
* Fire Pump Controller
* SPD/TVSS
When building panelboards/switchboards,
add terminations according to an example from the schedules.
@@ -52,6 +51,14 @@ Items to Avoid:
* Grounding
* Elevator Room
#### SPD's/TVSS's
Labor only: ~1.5hrs
#### Panelboards
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
#### Enclosed Circuit Breakers
Treat as disconnect switch.