vault backup: 2025-08-19 16:31:07
This commit is contained in:
+20
-20
@@ -1,5 +1,25 @@
|
|||||||
{
|
{
|
||||||
"recentFiles": [
|
"recentFiles": [
|
||||||
|
{
|
||||||
|
"basename": "feeders",
|
||||||
|
"path": "feeders.md"
|
||||||
|
},
|
||||||
|
{
|
||||||
|
"basename": "full-takeoff",
|
||||||
|
"path": "full-takeoff.md"
|
||||||
|
},
|
||||||
|
{
|
||||||
|
"basename": "material-pricing",
|
||||||
|
"path": "material-pricing.md"
|
||||||
|
},
|
||||||
|
{
|
||||||
|
"basename": "switchgear",
|
||||||
|
"path": "switchgear.md"
|
||||||
|
},
|
||||||
|
{
|
||||||
|
"basename": "README",
|
||||||
|
"path": "README.md"
|
||||||
|
},
|
||||||
{
|
{
|
||||||
"basename": "open-problems-in-estimating",
|
"basename": "open-problems-in-estimating",
|
||||||
"path": "open-problems-in-estimating.md"
|
"path": "open-problems-in-estimating.md"
|
||||||
@@ -8,14 +28,6 @@
|
|||||||
"basename": "portable-tools",
|
"basename": "portable-tools",
|
||||||
"path": "portable-tools.md"
|
"path": "portable-tools.md"
|
||||||
},
|
},
|
||||||
{
|
|
||||||
"basename": "README",
|
|
||||||
"path": "README.md"
|
|
||||||
},
|
|
||||||
{
|
|
||||||
"basename": "feeders",
|
|
||||||
"path": "feeders.md"
|
|
||||||
},
|
|
||||||
{
|
{
|
||||||
"basename": "low-voltage",
|
"basename": "low-voltage",
|
||||||
"path": "low-voltage.md"
|
"path": "low-voltage.md"
|
||||||
@@ -28,10 +40,6 @@
|
|||||||
"basename": "electrical",
|
"basename": "electrical",
|
||||||
"path": "electrical.md"
|
"path": "electrical.md"
|
||||||
},
|
},
|
||||||
{
|
|
||||||
"basename": "full-takeoff",
|
|
||||||
"path": "full-takeoff.md"
|
|
||||||
},
|
|
||||||
{
|
{
|
||||||
"basename": "feeder-sizing",
|
"basename": "feeder-sizing",
|
||||||
"path": "feeder-sizing.md"
|
"path": "feeder-sizing.md"
|
||||||
@@ -60,10 +68,6 @@
|
|||||||
"basename": "assembly-objects",
|
"basename": "assembly-objects",
|
||||||
"path": "assembly-objects.md"
|
"path": "assembly-objects.md"
|
||||||
},
|
},
|
||||||
{
|
|
||||||
"basename": "switchgear",
|
|
||||||
"path": "switchgear.md"
|
|
||||||
},
|
|
||||||
{
|
{
|
||||||
"basename": "bpm-award-analysis",
|
"basename": "bpm-award-analysis",
|
||||||
"path": "bpm-award-analysis.md"
|
"path": "bpm-award-analysis.md"
|
||||||
@@ -195,10 +199,6 @@
|
|||||||
{
|
{
|
||||||
"basename": "blank-system",
|
"basename": "blank-system",
|
||||||
"path": "blank-system.md"
|
"path": "blank-system.md"
|
||||||
},
|
|
||||||
{
|
|
||||||
"basename": "subfeeds",
|
|
||||||
"path": "subfeeds.md"
|
|
||||||
}
|
}
|
||||||
],
|
],
|
||||||
"omittedPaths": [],
|
"omittedPaths": [],
|
||||||
|
|||||||
+12
-6
@@ -68,12 +68,14 @@ Locate:
|
|||||||
> All takeoffs in Systems with names including "site"
|
> All takeoffs in Systems with names including "site"
|
||||||
> should be in "Site" Area, Phase, and Bid Item breakdowns.
|
> should be in "Site" Area, Phase, and Bid Item breakdowns.
|
||||||
|
|
||||||
|
For adjacent panels, use a minimum 10ft length.
|
||||||
|
|
||||||
#### Adders
|
#### Adders
|
||||||
|
|
||||||
Use the difference in elevation between equipment
|
Use the difference in elevation between equipment
|
||||||
or 10ft, whichever is greater.
|
or 10ft, whichever is greater.
|
||||||
|
|
||||||
Add an additional 5ft for site runs
|
Add an additional 5ft (total 15ft) for site runs
|
||||||
(primaries, secondaries, etc.).
|
(primaries, secondaries, etc.).
|
||||||
|
|
||||||
#### Primaries
|
#### Primaries
|
||||||
@@ -82,14 +84,18 @@ Empty conduit.
|
|||||||
|
|
||||||
#### Secondaries
|
#### Secondaries
|
||||||
|
|
||||||
> [!info] Vaults and Secondary Connections
|
##### Wiring on Vault Racks
|
||||||
> In utility vaults, secondary conductors sometimes run on racks,
|
|
||||||
> far past their entrance conduits, to their transformers.
|
Where secondary conductors run on racks in utility vaults
|
||||||
> It is necessary to add this distance to the wire makeup,
|
manually set the length of conduit,
|
||||||
> rather than simply measure the conduit assembly to the transformer.
|
measure the wire length,
|
||||||
|
add 20ft in addition to previously mentioned adders.
|
||||||
|
|
||||||
#### Feeders
|
#### Feeders
|
||||||
|
|
||||||
|
`Area` = "01 - Feeders/Risers Building"
|
||||||
|
for all feeders, no matter the location.
|
||||||
|
|
||||||
#### Bus Duct
|
#### Bus Duct
|
||||||
|
|
||||||
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`BUS DUCT`
|
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`BUS DUCT`
|
||||||
|
|||||||
@@ -35,3 +35,5 @@ Complete [[project-setup]].
|
|||||||
11. [[misc-budgets]]
|
11. [[misc-budgets]]
|
||||||
|
|
||||||
### 3. Extension (Review and Checking)
|
### 3. Extension (Review and Checking)
|
||||||
|
|
||||||
|
1. [[material-pricing]]
|
||||||
|
|||||||
@@ -0,0 +1,43 @@
|
|||||||
|
---
|
||||||
|
id:
|
||||||
|
aliases: []
|
||||||
|
tags:
|
||||||
|
- occupational
|
||||||
|
---
|
||||||
|
# Material Pricing
|
||||||
|
|
||||||
|
## Info
|
||||||
|
|
||||||
|
Use PDI and another vendor per the table below.
|
||||||
|
PDI pricing takes precedence where available.
|
||||||
|
|
||||||
|
| State | Vendor |
|
||||||
|
| ----- | ----------------------------- |
|
||||||
|
| AZ | QED INC - 12535 |
|
||||||
|
| CA | QED INC - 12535 |
|
||||||
|
| CO | QED INC - 12535 |
|
||||||
|
| DC | CAPITAL ELECTRIC - 14302 |
|
||||||
|
| DE | CAPITAL ELECTRIC - 14302 |
|
||||||
|
| FL | WORLD ELECTRIC SUPPLY - 45223 |
|
||||||
|
| GA | WORLD ELECTRIC SUPPLY - 34243 |
|
||||||
|
| MD | CAPITAL ELECTRIC - 14302 |
|
||||||
|
| NC | WORLD ELECTRIC SUPPLY - 34243 |
|
||||||
|
| NJ | COOPER ELECTRIC - 34860 |
|
||||||
|
| NY | COOPER ELECTRIC - 34860 |
|
||||||
|
| PA | CAPITAL ELECTRIC - 14302 |
|
||||||
|
| SC | WORLD ELECTRIC SUPPLY - 34243 |
|
||||||
|
| TN | WORLD ELECTRIC SUPPLY - 34243 |
|
||||||
|
| TX | QED INC - 12535 |
|
||||||
|
| VA | CAPITAL ELECTRIC - 14302 |
|
||||||
|
| WA | QED INC - 12535 |
|
||||||
|
|
||||||
|
> [!important]
|
||||||
|
> When updating, uncheck Update Supplier Code.
|
||||||
|
|
||||||
|
## Sequence
|
||||||
|
|
||||||
|
### 1. Estimate preparation
|
||||||
|
|
||||||
|
### 2. Takeoff
|
||||||
|
|
||||||
|
### 3. Extension (Review and Checking)
|
||||||
+9
-2
@@ -14,7 +14,7 @@ tags:
|
|||||||
2. In the drawings, locate:
|
2. In the drawings, locate:
|
||||||
* Riser Diagrams
|
* Riser Diagrams
|
||||||
* House Panels
|
* House Panels
|
||||||
3. Copy over default Temporary Assemblies from ?
|
3. Copy over default Temporary Assemblies from sandbox job
|
||||||
|
|
||||||
### 2. Takeoff
|
### 2. Takeoff
|
||||||
|
|
||||||
@@ -38,7 +38,6 @@ tags:
|
|||||||
* Meter
|
* Meter
|
||||||
* Fire Pump
|
* Fire Pump
|
||||||
* Fire Pump Controller
|
* Fire Pump Controller
|
||||||
* SPD/TVSS
|
|
||||||
|
|
||||||
When building panelboards/switchboards,
|
When building panelboards/switchboards,
|
||||||
add terminations according to an example from the schedules.
|
add terminations according to an example from the schedules.
|
||||||
@@ -52,6 +51,14 @@ Items to Avoid:
|
|||||||
* Grounding
|
* Grounding
|
||||||
* Elevator Room
|
* Elevator Room
|
||||||
|
|
||||||
|
#### SPD's/TVSS's
|
||||||
|
|
||||||
|
Labor only: ~1.5hrs
|
||||||
|
|
||||||
|
#### Panelboards
|
||||||
|
|
||||||
|
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
|
||||||
|
|
||||||
#### Enclosed Circuit Breakers
|
#### Enclosed Circuit Breakers
|
||||||
|
|
||||||
Treat as disconnect switch.
|
Treat as disconnect switch.
|
||||||
|
|||||||
Reference in New Issue
Block a user