vault backup: 2026-05-06 21:47:24

This commit is contained in:
2026-05-06 21:47:24 -04:00
parent 08c734cf08
commit 986fef2666
32 changed files with 121 additions and 45 deletions
+1 -1
View File
@@ -29,7 +29,7 @@ novel syntax implemented by Obsidian plugins should be avoided.
## Organization
All notes are located in the main directory.
[[tags]] are used for filtering.
%% [Heterarchy](https://en.wikipedia.org/wiki/Heterarchy) %%
## Setup from Scratch
+7
View File
@@ -0,0 +1,7 @@
---
aliases:
- Ace
title: Ace Electric, Inc.
tags: []
---
# Ace Electric, Inc.
+1 -1
View File
@@ -29,7 +29,7 @@ tags:
## Engraving
Don engraves his tabs with [TablEdit](http://www.tabledit.com/).
The PDF output is cramped and terribly inconsistent.
The [[pdf|PDF]] output is cramped and terribly inconsistent.
I'd like to rewrite as many of Don's
and any other tabs I can find in [[lilypond|LilyPond]].
+34
View File
@@ -0,0 +1,34 @@
---
title: On Exactitude in Science
tags:
- exclude-from-word-count
- type/media
creator:
- type: author
text: Jorge Luis Borges
- type: translator
text: Andrew Hurley
year: 1946
---
# On Exactitude in Science
...In that Empire, the Art of Cartography attained such Perfection
that the map of a single Province occupied the entirety of a City,
and the map of the Empire, the entirety of a Province.
In time, those Unconscionable Maps no longer satisfied,
and the Cartographers Guilds struck a Map of the Empire
whose size was that of the Empire,
and which coincided point for point with it.
The following Generations,
who were not so fond of the Study of Cartography as their Forebears had been,
saw that that vast Map was Useless,
and not without some Pitilessness was it,
that they delivered it up to the Inclemencies of Sun and Winters.
In the Deserts of the West, still today,
there are Tattered Ruins of that Map,
inhabited by Animals and Beggars;
in all the Land there is no other Relic of the Disciplines of Geography.
---Suarez Miranda,
_Viajes de varones prudentes_, Libro IV, Cap. XLV,
Lérida, 1658
+1
View File
@@ -61,3 +61,4 @@ but instrumentalism is far more practical.
* [Map--territory relation - Wikipedia](https://en.wikipedia.org/wiki/Map%E2%80%93territory_relation)
* "Mistaking the map for the territory" (logical fallacy)
* [Bonini's paradox](https://en.wikipedia.org/wiki/Bonini%27s_paradox)
+10
View File
@@ -0,0 +1,10 @@
---
aliases:
- PDF
title: Portable Document Format (PDF)
tags: []
up: "[[computer-language]]"
---
# Portable Document Format (PDF)
<https://speakerdeck.com/ange/lets-write-a-pdf-file>
+2 -3
View File
@@ -14,9 +14,8 @@ Content extracted from [[wiring-method-selection]],
timestamp based on my teams message to Joel.
%%
## Vanderbilt Central Neighborhood Residential College Spec Interpretation
[[vanderbilt-central-neighborhood-residential-college]]
Spec interpretation question
relevant to [[vanderbilt-central-neighborhood-residential-college]]:
> [!cite] Project Specifications (pp.)
> Fittings for Type EMT Duct Raceways:
+1 -1
View File
@@ -14,7 +14,7 @@ daily: "[[2025-11-04]]"
[[estimating-director-review]] for [[belle-meade-plaza]]
lead by [[corwin-fluit]],
attended by [[joel-jansen]] and myself.
attended by [[joel-jansen]] and [[zane-meyers|myself]].
#### Takeoff Review
+2 -4
View File
@@ -17,11 +17,9 @@ Anecdote criticizing the common adversarial model
of subcontractor-GC relations
(or more generally contractor-customer)
in [[construction-contracting]].
My position is that
deliberately hiding information from the customer
My position is that deliberately hiding information from the customer
(lacking [[transparency]] in interactions)
always costs the contractor
more than they stand to gain from it.
always costs the contractor more than they stand to gain from it.
%%
I might be reprimanded for the things I've said about deceptive bid practices
+2 -1
View File
@@ -9,7 +9,8 @@ daily: "[[2025-11-10]]"
---
# 2025-11-10 10:40:??
A significant change from Ace to PDI in my mentality during takeoff
A significant change from [[ace-electric-inc|Ace]] to [[power-design-inc|PDI]]
in my mentality during takeoff
is that I now tend to expect that (within reason)
"holes" in takeoff scripts are _intentional omissions_,
not holes in cost coverage.
+1 -1
View File
@@ -38,7 +38,7 @@ of [[nfpa-70_100_definitions#Exposed (as applied to wiring methods).|exposed]]
and [[nfpa-70_100_definitions#Dwelling, Multifamily.|dwelling]],
334.12(A)(2) can be paraphrased as follows:
> [!cite] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|NEC 334.12(A)(2)]], pp.
> [!cite] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|NEC 334.12(A)(2)]] (pp.)
> Types NM and NMC cable are not permitted to be installed
> in accessible spaces above suspended ceilings,
> _except in buildings containing one or more dwelling units._
+1 -1
View File
@@ -18,7 +18,7 @@ about what's correct that don't change just because
a senior says they should, is a good sign.
I can't remember now if I knew it before today,
but my relationship with Dale, my former manager,
but my relationship with [[dale-flythe|Dale]], my former manager,
while never "good", was much improved when I started
pushing back on his direction and feedback. I became
an estimator, where before I was just someone who
+1 -1
View File
@@ -6,7 +6,7 @@ daily: "[[2025-11-11]]"
---
# 2025-11-11 ??:??:??
> [!quote] [[joel-jansen]] 2025-11-11, pp.
> [!quote] [[joel-jansen]] 2025-11-11 (pp.)
>
> For N5-15R/N5-20R receptacles serving fixed equipment such as:
>
+1 -1
View File
@@ -12,7 +12,7 @@ _Tuesday Morning, Before Work_
One of the most appealing aspects of [[construction-estimating]]
to me is the dynamic we have with our employers.
my experience was at [[ace-electric-inc|Ace]] that estimators act like,
my experience at [[ace-electric-inc|Ace]] was that estimators act like,
and are treated like good artists, like loveable
little scamps who always get into trouble, but
you keep them around because they do good work.
+24 -12
View File
@@ -6,23 +6,33 @@ tags:
- type/minutes
title: ConEst Training Agenda
---
# ConEst Training Agenda
# 2025-11-13 13:25:27
## Day 1
## ConEst Training Agenda
%%
Agenda I hastily assembled
for training a project engineer
on [[conest|ConEst]] processes.
%%
### Day 1
%%
Started ~13:45
%%
### 2100 Crystal Drive
#### 2100 Crystal Drive
#### Deliverables
%% [[2100-crystal-drive]] %%
##### Deliverables
* [x] WBS Area Breakouts
* [x] Unit Matrix
* [ ] Accubid/LiveCount setup
* [ ] [[accubid|Accubid]]/LiveCount setup
#### Sequence
##### Sequence
1. Find BPM
* State, building type
@@ -46,9 +56,9 @@ Started ~13:45
* look in electrical, arch; compare.
* paste to Accubid Typicals
## Day 2
### Day 2
### Sequence
#### Sequence
1. Trainee to repeat process from [[#Day 1]]
on [[#Howard University East Towers]].
@@ -58,17 +68,19 @@ Started ~13:45
3. Trainer to explain OneNote
### Howard University East Towers
#### Howard University East Towers
#### Deliverables
%% [[howard-university-east-towers]] %%
##### Deliverables
* [ ] WBS Area Breakouts
* [ ] Unit Matrix
* [ ] Accubid/LiveCount setup
### Revisit 2100 Crystal Drive
#### Revisit 2100 Crystal Drive
#### Finish TrimbleConnect Setup
##### Finish TrimbleConnect Setup
* Back to TrimbleConnect
* split and add Drawings
+4 -3
View File
@@ -16,7 +16,8 @@ trying to [[learn-shorthand]],
I was growing frustrated with the terminology the text uses
to express English phonology.
I found a great article:
[Guess What? They're ALL Silent Letters!](https://mbsteven.edublogs.org/2018/05/05/guess-what-theyre-all-silent-letters/)
I found a great article
that effectively expresses the pain I feel
every time someone says "silent e".
every time someone says "silent e":
[Guess What? They're ALL Silent Letters!](https://mbsteven.edublogs.org/2018/05/05/guess-what-theyre-all-silent-letters/)
+3 -1
View File
@@ -12,7 +12,9 @@ daily: "[[2025-11-18]]"
%%
Transcription of notes
taken while reviewing [[elliott-st-hotel]] with [[joel-jansen]].
taken while observing
[[joel-jansen]]'s [[conest-senior-review]]
of [[elliott-st-hotel]]
%%
Adorne USB Heating Designation was built with standard device.
+3 -1
View File
@@ -10,7 +10,9 @@ daily: "[[2025-11-20]]"
## Elliot St. WBS Prep
[[elliott-st-hotel]]
%%
Follow-up to [[2025-11-18_16-33-00]].
%%
MC multi-circuit homeruns have makeup included
($\text{Length} \times 1.1$)
+1
View File
@@ -3,6 +3,7 @@ id: 2025-12-02T10:40:00-0500
title: 2025-12-02 10:40:??
tags:
- topic/construction/electrical
- exclude-from-word-count
daily: "[[2025-12-02]]"
---
# 2025-12-02 10:40:??
+1 -1
View File
@@ -1,7 +1,7 @@
---
id: 2025-12-02T10:57:00-0500
title: 2025-12-02 10:57:??
tags:
tags: []
daily: "[[2025-12-02]]"
---
# 2025-12-02 10:57:??
+1 -1
View File
@@ -1,7 +1,7 @@
---
id: 2025-12-02T13:20:00-0500
title: 2025-12-02 13:20:??
tags:
tags: []
daily: "[[2025-12-02]]"
---
# 2025-12-02 13:20:??
+1 -4
View File
@@ -1,10 +1,7 @@
---
id: 2025-12-03T15:54:22-0500
title: 2025-12-03 15:54:22
tags:
- status/draft
- topic/estimating
- topic/transparency
tags: []
daily: "[[2025-12-03]]"
---
# 2025-12-03 15:54:22
-1
View File
@@ -2,7 +2,6 @@
id: 2025-12-04T09:51:17-0500
title: 2025-12-04 09:51:17
tags:
- status/draft
- topic/automation
daily: "[[2025-12-04]]"
---
+2 -1
View File
@@ -6,7 +6,8 @@ daily: "[[2025-12-18]]"
---
# 2025-12-18 15:22:??
PDI has moved up the schedule to transition to [[accubid|Accubid]] Anywhere
[[pdi-estimating]] has moved up the schedule
to transition to [[accubid|Accubid]] Anywhere
and will be signing a contract with Trimble in late January.
[Drawer AI | Automated Electrical Takeoff & Estimating](https://drawer.ai/)
+1 -1
View File
@@ -8,7 +8,7 @@ daily: "[[2025-12-19]]"
# 2025-12-19 10:44:??
[[2025w51|This week]]
William Bonn, as part of [[units-takeoff]] for Howard University East Towers,
William Bonn, as part of [[units-takeoff]] for [[howard-university-east-towers]],
used an `Area` "Typical - Unit Balconies" for `Phase` "UNIT - RESIDENTIAL" takeoff.
Our senior [[joel-jansen]] approved of the method.
+2
View File
@@ -8,6 +8,8 @@ daily: "[[2026-01-02]]"
### Harborside Plaza 4
%% [[harborside-plaza-4]]
#### TODO
* [ ] [[electrical-takeoff|Electrical]]
+1 -1
View File
@@ -8,7 +8,7 @@ daily: "[[2026-01-07]]"
%%
Speculation about the meaning of [[construction]] terminology
as understood by other contractors.
as understood by other [[construction-contracting|contractors]].
%%
At [[ace-electric-inc|Ace]],
+4
View File
@@ -18,6 +18,8 @@ as reviewed with [[joel-jansen]]:
### Lighting Control
Relevant to [[lighting-controls-takeoff]]:
I took off lighting per plans (E510)
in spite of proposal stating "local control".
Will have to be changed.
@@ -35,6 +37,8 @@ Units
### Fixtures
Relevant to [[fixtures-takeoff]]:
> [!failure]
> Several fixtures were erroneously based on NM cable.
+4
View File
@@ -6,6 +6,10 @@ daily: "[[2026-01-09]]"
---
# 2026-01-09 12:00:??
%%
Exact ratios of Greegorian calendar units.
%%
$$
\begin{gather*}
\frac{146097}{400} = 365.2425~\text{Days Per Year} \
+2 -1
View File
@@ -30,7 +30,8 @@ attended by [[joel-jansen]] and myself.
#### Lighting Control
Follow up to [[2026-01-09_10-00-03#Lighting Control]]
Follow-up to [[2026-01-09_10-00-03#Lighting Control]].
Relevant to [[lighting-controls-takeoff]].
Josh stated my takeoff was correct per drawings,
but that concessions would need to be made for the scope
+1 -1
View File
@@ -64,7 +64,7 @@ Intent is to have conversations before contract
There will be bad estimates, bad proposals,
but ConEst's role is to prevent PDI _from making bad deals_
> [!quote] [[joel-jansen]], pp.
> [!quote] [[joel-jansen]] (pp.)
> Similar could be said by Ops about ConEst.
> ~~They have more time than us~~
+1 -1
View File
@@ -22,7 +22,7 @@ Evidence for the theory seems to come down to two points:
While it only appears to mess with space in the book,
it didn't feel like a stretch at all
to imagine that the entity had moved Zampanò from a different timeline,
or better yet, deleted all evidence of its existence
or better yet, deleted all evidence of its own existence
(present in _The Navidson Record_ and Zampanò's sources).
* **Zampanò is personally invested in _The Navidson Record_.**