vault backup: 2025-11-11 12:22:56

This commit is contained in:
2025-11-11 12:22:56 -05:00
parent 88b9c3b9b1
commit a07bc6c202
11 changed files with 188 additions and 83 deletions
+2 -1
View File
@@ -13,5 +13,6 @@
"obsidian-latex-suite",
"obsidian-pretty-bibtex",
"obsidian-tikzjax",
"lilypond"
"lilypond",
"novel-word-count"
]
+1 -1
View File
@@ -32,7 +32,7 @@ today. They have absurdly large feet, moorso the juveniles.\*
\*The common gallinule was formerly known as the common moorhen, only split from
the Old World species (_Gallinula chloropus_) in July 2011. It may still be more
widely known as "moorhen" , thus the pun.
Today was a good day---I've been at this for a while, one second.
Today was a good day---I've been at this for a while, one second...
## 2025-10-31 19:48 --- Late Friday Evening, Halloween btw
+3 -5
View File
@@ -29,15 +29,13 @@ Now I feel myself sour when I see the same warning signs.
> is a fleeting vapor and a deadly snare
> [!quote] Robert Palmer, "Every Kinda People"
> There is no profit in deceit
>
> Honest men know that
>
> There is no profit in deceit \
> Honest men know that \
> Revenge does not taste sweet
When you bill your customer to provide scope
that they thought they already paid for,
they don't say "Touche" and move on,
they don't say "Touché" and move on,
they ask themselves what they've done for you,
what they're doing, and if you still deserve it.
**You are cashing out on good will.**
+36 -8
View File
@@ -4,8 +4,8 @@ aliases: []
tags:
- authorship/original
- destiny/permanent
- original-format/typewritten-print
- original-format/digital-text
- original-format/typewritten-print
- type/daily
title: 2025-11-10
---
@@ -55,19 +55,19 @@ when I noticed a strange paragraph:
>
> Drop down ceiling is technically "Exposed" (the real term should be accessable),
> so Romex and SER is not permited. Will need to use MC.
>
>
> > [!image]
> > ### 334.12 Uses Not Permitted.
> >
> >
> > #### 334.12(A) Types NM and NMC.
> >
> >
> > Types NM and NMC cables shall not be permitted as follows:
> >
> >
> > 1. In any dwelling or structure not specifically
> > permitted in 334.10(1), (2), (3)
> > permitted in 334.10(1), (2), (3)
> >
> > 2. ==Exposed in dropped or suspended ceilings==
> > in other than one- and two-family and multifamily dwellings
> > in other than one- and two-family and multifamily dwellings
This analysis of 334.12(A)(2) is flawed.
@@ -84,7 +84,7 @@ can be paraphrased as follows:
> in accessible spaces above suspended ceilings,
> _except in buildings containing one or more dwelling units._
The prohibition of 334.12(A)(2) *never* applies to apartments or condos,
The prohibition of 334.12(A)(2) _never_ applies to apartments or condos,
And only applies to hotels and dormitories on a basis of AHJ interpretation
(See [[multi-family-dwellings#Are Hotels Multifamily Dwellings?]]).
@@ -106,3 +106,31 @@ I'm certain I misuse it frequently.
It _does not_ include power conductors to
[[nfpa-70_100_definitions#Utilization Equipment.|utilization equipment]],
those are a [[nfpa-70_100_definitions#Branch Circuit.|branch circuit]]
## 2025-11-10 20:00 --- Monday Evening, Before Bed
Today while (a peer) and I were walking, he asked
me what I thought of his qualities as an estimator.
I told him I think he has the right of it, that having beliefs
about what's correct that don't change just because
a senior says they should, is a good sign.
I can't remember now if I knew it before today,
but my relationship with Dale, my former manager,
while never "good", was much improved when I started
pushing back on his direction and feedback. I became
an estimator where before I was just someone who
could estimate for him. He hated it, and let me know,
but I never felt more sure of my position.
Estimating is not a field where you get ahead
by being more technically skilled or efficient.
You distinguish yourself by convincing your superiors
that you understand the objective and how to achieve
it. The best estimators---as measured by compensation
package---are not doing takeoff, they're
telling other estimators what to take off and how.
Conquer your self-doubt. Tell your boss they're
wrong and stupid and they should feel bad. Profit.
+35
View File
@@ -0,0 +1,35 @@
---
id:
aliases: []
tags:
- authorship/original
- destiny/permanent
- original-format/typewritten-print
- type/daily
title: 2025-11-11
---
# 2025-11-11
## 2025-11-11 06:06 --- Tuesday Morning, Before Work
One of the most appealing aspects of estimating
to me is the dynamic we have with our employers.
my experience was at Ace that estimators act like,
and are treated like good artists, like loveable
little-scamps who always get into trouble, but
you keep them around because they do good work.
There was no other position with a similar reputation.
I attribute this strange relationship to two
facts of our role:
1. Estimating provides executives with a service,
one that they could almost do without, but that they
understand the value of paying for.
2. Estimating is just math-heavy enough that it
seems like magic to the uninitiated.
In these ways we're actually more like court
wizards than artists, which is an understandably
desirable position.
+34 -24
View File
@@ -45,7 +45,22 @@ Include [[sleeving-takeoff]] as necessary.
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FIRE PUMP ROOM ...`
### FACR to Elevator Shafts
### Elevator Control Rooms
> Also "Elevator Machine Room"
For each Elevator Control Room (ECR):
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`ELEV CONTROL ROOM ...`
* **Count** = 1
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FACR TO ELEV CONTROL RM ...`
* **Length** = Length measured from the most distant points of the FACR and ECR.
* Input adder length to reach the level of the ECR (Minimum 15ft).
### Elevator Shafts
`Area` = Same as FACR
@@ -73,19 +88,6 @@ For each elevator shaft:
> | 1 shaft | 2 shafts |
> ```
### FACR to Elevator Control Rooms
For each Elevator Control Room (ECR):
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`ELEV CONTROL ROOM ...`
* **Count** = 1
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`GEN, ELEV, FIRE PUMP & FA ROOM ASSEMBLIES`/`FACR TO ELEV CONTROL RM ...`
* **Length** = Length measured from the most distant points of the FACR and ECR.
* Input adder length to reach the level of the ECR (Minimum 15ft).
### FACR to Stairwells
> [!info]
@@ -98,7 +100,7 @@ For each stairwell:
* **Length** = Length measured from the most distant points of the FACR and stairwell.
* Input adder length to reach the level of the stairwell (Minimum 15ft).
### Terminal Cabinets
## Terminal Cabinets
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`TERMINAL CABINET`/`ACE D ACCESSORY CABINET ENCLOSURE ...`
@@ -107,25 +109,33 @@ For each stairwell:
Horizontal:
`Area` = Same as FACR
* **Length** = Length measured from FACR to all electrical rooms
> * `Area` = Same as FACR
> * **Length** = Length measured from FACR to all electrical rooms
Vertical:
`Area` = "Typical - Building All Levels"
> * `Area` = "Typical - Building All Levels"
> * **Length** = 10ft
* **Length** = 10ft
### Annunciator Panels
## Annunciator Panels
> [!info] Also Known As
> * Fire Alarm Annunciator (FAA)
> * Fire Alarm Annunciator Panel (FAAP)
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`ANNUNCIATORS`/`REMOTE SERIAL ANNUNCIATOR ...`
> `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`ANNUNCIATORS`/`REMOTE SERIAL ANNUNCIATOR ...`
> * **Length** = Length measured from the FACR to FAA or Lobby
**Length** = Length measured from the FACR to FAA or Lobby
## Central Monitoring Loop
> [!important]
> Garden Style only.
> Fire Alarm Control Panels from each building will send a signal to a central location.
>
> In case of an emergency,
> the fire department will go to the central fire alarm station
> and find out what the issue is.
## Devices
+21 -19
View File
@@ -19,11 +19,11 @@ for use in [[fixtures-takeoff]].
### Format
```regex
<phase-abbr> - <assembly>(\: <subtype>)?( - <fixture-labor>)? \(<wiring-method>\)( <wm-descriptor>)* <branch-length>ft
<phase-abbr> - <assembly>(\: <assembly-subtype>)?( = <fixture-labor>)? <wiring-method> <branch-length>ft
```
> [!example]
> `A - Surface: Pendant - 2.0hrs (MC) LV 20ft`
> `A - Surface: Pendant = 2.0hrs - #12 MC+LV 20ft`
## Order
@@ -67,7 +67,7 @@ Use empty designations to separate phases.
| Exterior Amenity | 50ft |
| Units | 20ft |
| Undercabinet Fixtures | 10ft |
| Stairwells | ? |
| Stairwells | 20ft |
| Kitchen | ? |
Reduce as appropriate.
@@ -89,26 +89,24 @@ Reduce as appropriate.
Use ENT assemblies unless forbidden by spec.
`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/`GARAGE FIXTURE ENT W/#10 - STEEL OCT RING`
`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/`GARAGE FIXTURE W/T ROD ENT W/#10 - STEEL OCT RING`
Use threaded rod assemblies in I-beam/precast garages.
| Case | Assembly Path (`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/...) |
| ----------------- | -------------------------------------------------------------- |
| Conventional Slab | .../`GARAGE FIXTURE ENT W/#10 - STEEL OCT RING` |
| Precast/I-Beam | .../`GARAGE FIXTURE W/T ROD ENT W/#10 - STEEL OCT RING` |
If PVC is required, use following assemblies:
| Case | Assembly Path |
| ------- | ------------------------------------------------------------------------------------------------ |
| Ceiling | `FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
| Wall | `FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/`... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP` |
| Case | Assembly Path (`FIXTURE ACCESSORIES`/`PVC/ENT ASSEMBLIES`/...) |
| ------- | -------------------------------------------------------------- |
| Ceiling | .../`... - SLAB BOX / 45 DEG STUBBY` |
| Wall | .../`... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP` |
### Homeruns
> * `System` = "EL - Electrical"
> `COMMON ASSEMBLIES`/`Device Homeruns in Slab/Deck`
Use 1 Homerun for every 3 circuits in Garage
Use assembly `COMMON ASSEMBLIES`/`Device Homeruns in Slab/Deck`
Use 1 homerun for every 3 circuits in Garage
## Surface Mount
@@ -207,6 +205,10 @@ round up to the nearest 5ft
| MC Cable | `MC ASSEMBLIES`/`FAN RATED OCT BOX W/ BAR HNGR - ...` |
| PVC | `PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY` |
## Guardrail Fixtures
`FIXTURE ACCESSORIES`/`COURTYARDS & LANDSCAPE`/`ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...`
## Stairwells & Elevators
`PVC/ENT ASSEMBLIES`/`... - SLAB BOX / 45 DEG STUBBY`
@@ -217,10 +219,10 @@ round up to the nearest 5ft
Length and Labor will be more than a normal fixture in BOH/Amenity
| Fixture Type | Labor (hrs) |
| ------------ | ----------------------------------- |
| Non-Linear | 2 |
| Linear | [See tape lighting](#Tape Lighting) |
| Fixture Type | Labor |
| ------------ | ---------------------- |
| Non-Linear | 2hrs |
| Linear | See [[#Tape Lighting]] |
> 1. `3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP`
> * `Length per Unit` = Distance to panel
+4 -1
View File
@@ -26,7 +26,8 @@ title: Full Takeoff
### 2. Takeoff
> [!important] Disclaimer
> [[takeoff-strategy-comparison]]
> These scripts are intended to cover all cases, but may not.
> Variations should be corrected.
#### Stage 1
@@ -45,6 +46,8 @@ title: Full Takeoff
10. [[standalone-systems-takeoff]]
11. [[misc-budgets-takeoff]]
[[general-takeoff]]
### 3. Review
1. [[takeoff-review]]
+19
View File
@@ -0,0 +1,19 @@
---
id:
aliases: []
tags:
- authorship/original
- destiny/permanent
- occupational/takeoff
- status/draft
- type/guide
title: General Takeoff
---
# General Takeoff
This note is for all takeoff sub-scripts
intended to be referenced by multiple top-level systems.
* [[fire-resistive-wiring-methods-takeoff]]
* [[heating-designations]]
* [[sleeving-takeoff]]
+33 -11
View File
@@ -21,7 +21,7 @@ title: Switchgear
* Generators
* Transfer switches
* Generator connection cabinets
* CT cabinet
* CT cabinets
* Power monitor
2. Takeoff Common Assemblies:
@@ -47,7 +47,15 @@ add terminations according to an example from the schedules.
> * Grounding
> * Elevator Room
## SPD's/TVSS's
## By Equipment Type
> [!tip] When in Doubt
> If the equipment is not listed below,
> use a distribution panel of equal amps.
### SPD's/TVSS's
> Name = "SPD"
Labor only.
@@ -56,37 +64,51 @@ Specific item is not important, but I use
(Labor = 1.5hrs)
for consistency.
## Submeters/Power Monitors
### Submeters/Power Monitors
> Name = "Power Monitor"
See [[switchgear#SPD's/TVSS's]]
## Panelboards
### Switchboards
> Name = "Switchboard - 2000A, 4-Section"
### Panelboards
> Name = "Panelboard - 600A, 2-Section"
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
## Disconnects and Enclosed Circuit Breakers
### Disconnects and Enclosed Circuit Breakers
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`MANUAL DISCONNECTS`/...
## Generators
### Generators
> Name = "Generator - 250kW, Diesel"
Add `DISTRIBUTION FITTINGS`/`GENERATOR SET UP`.
## Generator Connection Cabinets
### Generator Connection Cabinets
> Name = "GCC - 200A"
Use a Distribution Panel of equal amps.
Or a transfer switch.
## Transfer Switches
### Transfer Switches
> "300A ATS"
> Name = "Transfer Switch - 400A"
### Transfer Switches 1200A+
#### Transfer Switches 1200A+
Use 1200A and add an additional `TRANSFER SWITCH` item
to make up the remaining amps.
## Meter Centers
### Meter Centers
> Name = "Meter Center - 800A, 16-Can"
`SWITCHGEAR & METER CENTERS`/`METER CENTERS`/`... METERING SECTION`
-13
View File
@@ -1,13 +0,0 @@
---
id:
aliases: []
tags:
- authorship/original
- destiny/fleeting
- status/incomplete
- type/idea
title: TheConstructor.Org
---
# TheConstructor.Org
https://theconstructor.org