@@ -21,7 +21,7 @@ title: Switchgear
* Generators
* Transfer switches
* Generator connection cabinets
* CT cabinet
* CT cabinets
* Power monitor
2. Takeoff Common Assemblies:
@@ -47,7 +47,15 @@ add terminations according to an example from the schedules.
> * Grounding
> * Elevator Room
## SPD's/TVSS's
## By Equipment Type
> [!tip] When in Doubt
> If the equipment is not listed below,
> use a distribution panel of equal amps.
### SPD's/TVSS's
> Name = "SPD"
Labor only.
@@ -56,37 +64,51 @@ Specific item is not important, but I use
(Labor = 1.5hrs)
for consistency.
## Submeters/Power Monitors
### Submeters/Power Monitors
> Name = "Power Monitor"
See [[switchgear#SPD's/TVSS's]]
## Panelboards
### Switchboards
> Name = "Switchboard - 2000A, 4-Section"
### Panelboards
> Name = "Panelboard - 600A, 2-Section"
`DISTRIBUTION`/`DIST PANELS & UNIT LOAD CENTERS`/...
## Disconnects and Enclosed Circuit Breakers
### Disconnects and Enclosed Circuit Breakers
`COMMON ASSEMBLIES`/`DISTRIBUTION`/`MANUAL DISCONNECTS`/...
## Generators
### Generators
> Name = "Generator - 250kW, Diesel"
Add `DISTRIBUTION FITTINGS`/`GENERATOR SET UP`.
## Generator Connection Cabinets
### Generator Connection Cabinets
> Name = "GCC - 200A"
Use a Distribution Panel of equal amps.
Or a transfer switch.
## Transfer Switches
### Transfer Switches
> "300A ATS"
> Name = "Transfer Switch - 400A"
### Transfer Switches 1200A+
#### Transfer Switches 1200A+
Use 1200A and add an additional `TRANSFER SWITCH` item
to make up the remaining amps.
## Meter Centers
### Meter Centers
> Name = "Meter Center - 800A, 16-Can"
`SWITCHGEAR & METER CENTERS`/`METER CENTERS`/`... METERING SECTION`