# 2025-11-18
|
||||||
|
|
||||||
|
## 2025-11-18 16:33
|
||||||
|
|
||||||
|
%%
|
||||||
|
Transcription of notes
|
||||||
|
taken while reviewing Elliot St. with Joel Jansen.
|
||||||
|
%%
|
||||||
|
|
||||||
|
Adorne USB Heating Designation was built with standard device.
|
||||||
|
Subbed for Adorne.
|
||||||
|
|
||||||
|
Subbed standard duplex receptacles in guestrooms for Adorne.
|
||||||
|
|
||||||
|
Confirmed fixture branch length changes
|
||||||
|
including Garage
|
||||||
|
|
||||||
|
Note: It is not usually necessary to count emergency fixtures separately.
|
||||||
|
|
||||||
|
Use minimum 1 hour for tape lights, except in units (minimum 0.5hr).
|
||||||
|
|
||||||
|
Final Pricing adjustments:
|
||||||
|
Warranty,
|
||||||
|
CIP (see proposal)
|
||||||
|
|
||||||
|
Added putty pads.
|
||||||
|
|
||||||
|
Fire stopping budget = $25-35 per Unit.
|
||||||
|
|
||||||
|
Robotic Total Station hours: match Structural Foreman.
|
||||||
|
|
||||||
|
Equipment Cost $\approx$ 1% for contracts 5-15 million dollars.
|
||||||
|
|
||||||
|
Mid Atlantic: 1 trip per month
|
||||||
|
|
||||||
|
Offsite Parking: see bid sheet
|
||||||
|
|
||||||
|
Project Executive time same as Oversight.
|
||||||
|
|
||||||
|
When calculating durations for indirect labor, round down.
|
||||||
|
|
||||||
|
* Rough Foreman
|
||||||
|
* Trim Foreman
|
||||||
|
* Amenity Foreman
|
||||||
|
|
||||||
|
LV/FA Foreman: get hours from systems quote.
|
||||||
|
|
||||||
|
Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm"
|
||||||
|
|
||||||
|
Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.
|
||||||
@@ -141,11 +141,15 @@ Vertical:
|
|||||||
|
|
||||||
### Smoke Detectors
|
### Smoke Detectors
|
||||||
|
|
||||||
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`SMOKE DETECTOR W/ BASE - ...`
|
||||||
|
|
||||||
_Design Build:_
|
_Design Build:_
|
||||||
Count every stairwell at every level.
|
Count every stairwell at every level.
|
||||||
|
|
||||||
### Pull Stations
|
### Pull Stations
|
||||||
|
|
||||||
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`PULL STATION - ...`
|
||||||
|
|
||||||
_Design Build:_
|
_Design Build:_
|
||||||
Count every stairwell at every level
|
Count every stairwell at every level
|
||||||
and every exterior exit.
|
and every exterior exit.
|
||||||
@@ -165,7 +169,9 @@ _Design Build:_
|
|||||||
Count 2 for every set of double doors.
|
Count 2 for every set of double doors.
|
||||||
(Typical of elevator lobbies and corridors)
|
(Typical of elevator lobbies and corridors)
|
||||||
|
|
||||||
### Speaker Strobes
|
### Horns, Speakers, and Strobes
|
||||||
|
|
||||||
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`INDOOR HORN STROBE - ...`
|
||||||
|
|
||||||
_Design Build:_
|
_Design Build:_
|
||||||
* Count every 75 ft,
|
* Count every 75 ft,
|
||||||
|
|||||||
+14
-15
@@ -2,38 +2,37 @@
|
|||||||
id:
|
id:
|
||||||
aliases: []
|
aliases: []
|
||||||
tags:
|
tags:
|
||||||
|
- authorship/other-for-now
|
||||||
- destiny/permanent
|
- destiny/permanent
|
||||||
- occupational
|
- occupational
|
||||||
- status/incomplete
|
- status/incomplete
|
||||||
- type/guide
|
- type/guide
|
||||||
- authorship/other-for-now
|
|
||||||
title: PDI Labor Plan
|
title: PDI Labor Plan
|
||||||
---
|
---
|
||||||
# PDI Labor Plan
|
# PDI Labor Plan
|
||||||
|
|
||||||
1. Fill out project basics
|
1. Fill out project basics
|
||||||
|
|
||||||
2. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)
|
2. Check that everything is sorted into correct `Phase` and `Area` (Extension: Phase - Area)
|
||||||
|
|
||||||
3. Move everything in BUILDING FA systems into FA phase
|
3. Move everything in BUILDING FA systems into FA phase
|
||||||
|
|
||||||
* Create a Phase named: "Fire Alarm"
|
* Create `Phase` = "Fire Alarm"
|
||||||
* Check system and Bid Item
|
* Check `System` and `Bid Item`
|
||||||
* Scroll through each and select all line items `FA - ...`
|
* Scroll through each and select all line items `FA - ...`
|
||||||
* Change Breakdown to "Fire Alarm" phase
|
* Set `Phase` = "Fire Alarm"
|
||||||
|
|
||||||
4. Separate all Phases into their proper corresponding "Labor Factor"
|
4. Separate all Phases into their proper corresponding `Labor Factor`
|
||||||
|
|
||||||
* Check Phase box
|
* Scroll through each `Phase`
|
||||||
* Start scrolling through beginning with N/A
|
* Change breakdown of everything in each phase to the proper `Labor Factor`
|
||||||
* Change breakdown of everything in each phase to the proper labor factor
|
|
||||||
* Do not move Temp Power (buckets) or site
|
* Do not move Temp Power (buckets) or site
|
||||||
|
|
||||||
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
|
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
|
||||||
|
|
||||||
6. Select the "Phase / Sort Code" extension view
|
6. Select extension view "Phase / Sort Code"
|
||||||
|
|
||||||
7. Open "UNIT RESIDENTIAL" and "Building - Corridors" phases
|
7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors"
|
||||||
|
|
||||||
8. Go into each Sort code to find the count for each unit item
|
8. Go into each Sort code to find the count for each unit item
|
||||||
|
|
||||||
@@ -50,14 +49,14 @@ title: PDI Labor Plan
|
|||||||
10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab
|
10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab
|
||||||
|
|
||||||
* For the floor counts, if there are multiple buildings, add their total level count together
|
* For the floor counts, if there are multiple buildings, add their total level count together
|
||||||
|
|
||||||
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
|
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
|
||||||
|
|
||||||
* Add any useful description to the naming
|
* Add any useful description to the naming
|
||||||
* Can change "Other" to something more prevalent on the project
|
* Can change "Other" to something more prevalent on the project
|
||||||
|
|
||||||
* "pour section rate" refers to the size of each slab that will be poured (sometimes will be shown on the structural plans)
|
* "pour section rate" refers to the size of each slab that will be poured
|
||||||
|
* sometimes will be shown on the structural plans
|
||||||
|
|
||||||
* "Number of days per…" is found by multiplying "Pour Section Qty" by 4 or 5
|
* "Number of days per..." equals "Pour Section Qty" times 4 or 5
|
||||||
|
|
||||||
11. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)
|
11. Check that everything is sorted into correct `Phase` and `Area` (Extension: "Phase - Area")
|
||||||
|
|||||||
@@ -38,6 +38,10 @@ Size and quantity per proposal > drawings > assume (4) 4"C
|
|||||||
|
|
||||||
_Garden Style:_ Outside of every building
|
_Garden Style:_ Outside of every building
|
||||||
|
|
||||||
|
> [!important] Long-Radius Elbows
|
||||||
|
> Note requirements for long-radius elbows,
|
||||||
|
> substitute items as necessary.
|
||||||
|
|
||||||
### Telecom Vaults
|
### Telecom Vaults
|
||||||
|
|
||||||
"Quazite Box"
|
"Quazite Box"
|
||||||
@@ -117,3 +121,6 @@ As shown on plans. Ignore floor boxes, other electrical scope.
|
|||||||
* .../`BOH / AMENITY ASSEMBLIES`
|
* .../`BOH / AMENITY ASSEMBLIES`
|
||||||
* .../`SCREWLESS DECORA COVERS UNITS / BOH`
|
* .../`SCREWLESS DECORA COVERS UNITS / BOH`
|
||||||
* .../`ROUGH IN ASSY`
|
* .../`ROUGH IN ASSY`
|
||||||
|
|
||||||
|
If system is included, take off _both_ rough-in and device assemblies
|
||||||
|
in amenity areas.
|
||||||
|
|||||||
+11
-1
@@ -98,8 +98,16 @@ Eaton 35M2W
|
|||||||
|
|
||||||
### Telecom Homeruns
|
### Telecom Homeruns
|
||||||
|
|
||||||
|
#### Residential
|
||||||
|
|
||||||
Included in MSDE.
|
Included in MSDE.
|
||||||
|
|
||||||
|
#### Key
|
||||||
|
|
||||||
|
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`BOH AMENITY ASSEMBLIES`/...
|
||||||
|
|
||||||
|
Adjust cable length as needed.
|
||||||
|
|
||||||
### Fire Alarm Devices
|
### Fire Alarm Devices
|
||||||
|
|
||||||
#### Residential
|
#### Residential
|
||||||
@@ -116,4 +124,6 @@ For ADA units:
|
|||||||
|
|
||||||
##### Additional Signaling Devices
|
##### Additional Signaling Devices
|
||||||
|
|
||||||
==use free air devices==
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`UNIT HORN/STROBE - ...`
|
||||||
|
|
||||||
|