# 2025-11-18
## 2025-11-18 16:33
%%
Transcription of notes
taken while reviewing Elliot St. with Joel Jansen.
%%
Adorne USB Heating Designation was built with standard device.
Subbed for Adorne.
Subbed standard duplex receptacles in guestrooms for Adorne.
Confirmed fixture branch length changes
including Garage
Note: It is not usually necessary to count emergency fixtures separately.
Use minimum 1 hour for tape lights, except in units (minimum 0.5hr).
Final Pricing adjustments:
Warranty,
CIP (see proposal)
Added putty pads.
Fire stopping budget = $25-35 per Unit.
Robotic Total Station hours: match Structural Foreman.
Equipment Cost $\approx$ 1% for contracts 5-15 million dollars.
Mid Atlantic: 1 trip per month
Offsite Parking: see bid sheet
Project Executive time same as Oversight.
When calculating durations for indirect labor, round down.
* Rough Foreman
* Trim Foreman
* Amenity Foreman
LV/FA Foreman: get hours from systems quote.
Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm"
Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.
+7 -1
View File
@@ -141,11 +141,15 @@ Vertical:
### Smoke Detectors ### Smoke Detectors
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`SMOKE DETECTOR W/ BASE - ...`
_Design Build:_ _Design Build:_
Count every stairwell at every level. Count every stairwell at every level.
### Pull Stations ### Pull Stations
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`PULL STATION - ...`
_Design Build:_ _Design Build:_
Count every stairwell at every level Count every stairwell at every level
and every exterior exit. and every exterior exit.
@@ -165,7 +169,9 @@ _Design Build:_
Count 2 for every set of double doors. Count 2 for every set of double doors.
(Typical of elevator lobbies and corridors) (Typical of elevator lobbies and corridors)
### Speaker Strobes ### Horns, Speakers, and Strobes
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`INDOOR HORN STROBE - ...`
_Design Build:_ _Design Build:_
* Count every 75 ft, * Count every 75 ft,
+20 -21
View File
@@ -2,46 +2,45 @@
id: id:
aliases: [] aliases: []
tags: tags:
- authorship/other-for-now
- destiny/permanent - destiny/permanent
- occupational - occupational
- status/incomplete - status/incomplete
- type/guide - type/guide
- authorship/other-for-now
title: PDI Labor Plan title: PDI Labor Plan
--- ---
# PDI Labor Plan # PDI Labor Plan
1. Fill out project basics 1. Fill out project basics
2. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area) 2. Check that everything is sorted into correct `Phase` and `Area` (Extension: Phase - Area)
3. Move everything in BUILDING FA systems into FA phase 3. Move everything in BUILDING FA systems into FA phase
* Create a Phase named: "Fire Alarm" * Create `Phase` = "Fire Alarm"
* Check system and Bid Item * Check `System` and `Bid Item`
* Scroll through each and select all line items `FA - ...` * Scroll through each and select all line items `FA - ...`
* Change Breakdown to "Fire Alarm" phase * Set `Phase` = "Fire Alarm"
4. Separate all Phases into their proper corresponding "Labor Factor" 4. Separate all Phases into their proper corresponding `Labor Factor`
* Check Phase box * Scroll through each `Phase`
* Start scrolling through beginning with N/A * Change breakdown of everything in each phase to the proper `Labor Factor`
* Change breakdown of everything in each phase to the proper labor factor
* Do not move Temp Power (buckets) or site * Do not move Temp Power (buckets) or site
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan 5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
6. Select the "Phase / Sort Code" extension view 6. Select extension view "Phase / Sort Code"
7. Open "UNIT RESIDENTIAL" and "Building - Corridors" phases 7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors"
8. Go into each Sort code to find the count for each unit item 8. Go into each Sort code to find the count for each unit item
| Code | Description | | Code | Description |
| ---- | -------------------- | | ---- | -------------------- |
| 200 | rough | | 200 | rough |
| 300 | trim | | 300 | trim |
| 400 | rough wire and cable | | 400 | rough wire and cable |
9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right 9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right
@@ -50,14 +49,14 @@ title: PDI Labor Plan
10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab 10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab
* For the floor counts, if there are multiple buildings, add their total level count together * For the floor counts, if there are multiple buildings, add their total level count together
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
* Add any useful description to the naming * Add any useful description to the naming
* Can change "Other" to something more prevalent on the project * Can change "Other" to something more prevalent on the project
* "pour section rate" refers to the size of each slab that will be poured (sometimes will be shown on the structural plans) * "pour section rate" refers to the size of each slab that will be poured
* sometimes will be shown on the structural plans
* "Number of days per…" is found by multiplying "Pour Section Qty" by 4 or 5 * "Number of days per..." equals "Pour Section Qty" times 4 or 5
11. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area) 11. Check that everything is sorted into correct `Phase` and `Area` (Extension: "Phase - Area")
+7
View File
@@ -38,6 +38,10 @@ Size and quantity per proposal > drawings > assume (4) 4"C
_Garden Style:_ Outside of every building _Garden Style:_ Outside of every building
> [!important] Long-Radius Elbows
> Note requirements for long-radius elbows,
> substitute items as necessary.
### Telecom Vaults ### Telecom Vaults
"Quazite Box" "Quazite Box"
@@ -117,3 +121,6 @@ As shown on plans. Ignore floor boxes, other electrical scope.
* .../`BOH / AMENITY ASSEMBLIES` * .../`BOH / AMENITY ASSEMBLIES`
* .../`SCREWLESS DECORA COVERS UNITS / BOH` * .../`SCREWLESS DECORA COVERS UNITS / BOH`
* .../`ROUGH IN ASSY` * .../`ROUGH IN ASSY`
If system is included, take off _both_ rough-in and device assemblies
in amenity areas.
+11 -1
View File
@@ -98,8 +98,16 @@ Eaton 35M2W
### Telecom Homeruns ### Telecom Homeruns
#### Residential
Included in MSDE. Included in MSDE.
#### Key
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`BOH AMENITY ASSEMBLIES`/...
Adjust cable length as needed.
### Fire Alarm Devices ### Fire Alarm Devices
#### Residential #### Residential
@@ -116,4 +124,6 @@ For ADA units:
##### Additional Signaling Devices ##### Additional Signaling Devices
==use free air devices== `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`UNIT HORN/STROBE - ...`