@@ -13,16 +13,3 @@ Earned value management (EVM)
|
||||
is a [[project-management]] technique
|
||||
...
|
||||
|
||||
EVM is frequently stated to be capable of
|
||||
"measuring project performance and progress
|
||||
_in an objective manner_",[^1]
|
||||
an analysis that is either optimistic
|
||||
or totally misleading, depending on the context.
|
||||
|
||||
[^1]: [Wikipedia](https://en.wikipedia.org/wiki/Earned_value_management) (emphasis added)
|
||||
|
||||
EVM can be an objective measure of _progress_,
|
||||
but measuring _performance_,
|
||||
variance of actual cost/hours versus estimated,
|
||||
(obviously) requires an estimate,
|
||||
which is subject to bias and error.
|
||||
|
||||
@@ -114,3 +114,7 @@ Assuming this one can be ignored.
|
||||
|
||||
> E.2.1.1 "KEY NOTES" 2
|
||||
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
|
||||
|
||||
## Problems to Solve
|
||||
|
||||
ADA units likely exist, but are not shown on floor plans.
|
||||
@@ -71,10 +71,7 @@ There is no standard format for these matrices.
|
||||
|
||||
## Setup WBS
|
||||
|
||||
> [!info] "WBS"
|
||||
> What is called a "WBS" is not and is not intended to be.
|
||||
> It is a macro monolith excel document
|
||||
> used to extend/replace Accubid's default closeout.
|
||||
> See [[earned-value-management]]
|
||||
|
||||
```pwsh
|
||||
Set-Location "\\EgnyteDrive\Shared\Estimating\19 WBS Agreement GP"
|
||||
|
||||
@@ -138,6 +138,7 @@ Locate:
|
||||
3. Locate which plans the LV is taken off on
|
||||
4. Locate LV Details
|
||||
5. Read about the project specifications and construction type
|
||||
6. Assume 28" MSDE if not specified.
|
||||
|
||||
## Voltage Drop
|
||||
|
||||
|
||||
@@ -1,12 +1,11 @@
|
||||
---
|
||||
id: <% tp.file.title %>
|
||||
aliases: []
|
||||
title: <% tp.file.title %>
|
||||
id: <% moment(tp.file.title, 'YYYY-MM-DD_HH-mm-ss').format('YYYY-MM-DD[T]HH:mm:ssZZ') %>
|
||||
title: <% moment(tp.file.title, 'YYYY-MM-DD_HH-mm-ss').format('YYYY-MM-DD HH:mm:ss') %>
|
||||
tags: []
|
||||
dg-publish: true
|
||||
daily: "[[<% tp.file.title.slice(0, 10) %>]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# <% tp.file.title %>
|
||||
# <% moment(tp.file.title, 'YYYY-MM-DD_HH-mm-ss').format('YYYY-MM-DD HH:mm:ss') %>
|
||||
<%*
|
||||
// ensure daily note
|
||||
// await tp.file.create_new(tp.file.find_tfile("daily"), tp.file.title.slice(0, 10), true, "periodic/daily")
|
||||
|
||||
@@ -1,13 +1,13 @@
|
||||
---
|
||||
id: 2025-12-30_10-08-30
|
||||
id: 2025-12-30T10:08:30
|
||||
aliases: []
|
||||
title: 2025-12-30_10-08-30
|
||||
title: "2025-12-30 10:08:30"
|
||||
tags:
|
||||
- status/draft
|
||||
dg-publish: true
|
||||
daily: "[[2025-12-30]]"
|
||||
---
|
||||
# 2025-12-30_10-08-30
|
||||
# 2025-12-30 10:08:30
|
||||
|
||||
```
|
||||
3.ApplyThisSequence([-1,0,1,2,3])
|
||||
|
||||
@@ -0,0 +1,24 @@
|
||||
---
|
||||
id: 2026-04-21T11:55:50
|
||||
aliases: []
|
||||
title: 2026-02-17 16:36:35
|
||||
tags: []
|
||||
daily: "[[2026-02-17]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-02-17 16:36:35
|
||||
|
||||
[[earned-value-management]]
|
||||
is frequently stated to be capable of
|
||||
"measuring project performance and progress
|
||||
_in an objective manner_",[^1]
|
||||
an analysis that is either optimistic
|
||||
or totally misleading, depending on the context.
|
||||
|
||||
[^1]: [Wikipedia](https://en.wikipedia.org/wiki/Earned_value_management) (emphasis added)
|
||||
|
||||
EVM can be an objective measure of _progress_,
|
||||
but measuring _performance_,
|
||||
variance of actual cost/hours versus estimated,
|
||||
(obviously) requires an estimate,
|
||||
which is subject to bias and error.
|
||||
@@ -1,12 +1,12 @@
|
||||
---
|
||||
id: 2026-04-18_15-40-55
|
||||
id: 2026-04-18T15:40:55
|
||||
aliases: []
|
||||
title: 2026-04-18_15-40-55
|
||||
title: "2026-04-18 15:40:55"
|
||||
tags: []
|
||||
dg-publish: true
|
||||
daily: "[[2026-04-18]]"
|
||||
---
|
||||
# 2026-04-18_15-40-55
|
||||
# 2026-04-18 15:40:55
|
||||
|
||||
Follow-up to [[2026-04-15_19-28-06#"Obsidian for Learning Part II: Process"]]:
|
||||
|
||||
|
||||
@@ -1,12 +1,12 @@
|
||||
---
|
||||
id: 2026-04-18_18-44-11
|
||||
id: 2026-04-18T18:44:11
|
||||
aliases: []
|
||||
title: 2026-04-18_18-44-11
|
||||
title: "2026-04-18 18:44:11"
|
||||
tags: []
|
||||
dg-publish: true
|
||||
daily: "[[2026-04-18]]"
|
||||
---
|
||||
# 2026-04-18_18-44-11
|
||||
# 2026-04-18 18:44:11
|
||||
|
||||
I don't see many anymore
|
||||
on account of my change in workplace,
|
||||
|
||||
@@ -1,12 +1,12 @@
|
||||
---
|
||||
id: 2026-04-20_08-31-52
|
||||
id: 2026-04-20T08:31:52
|
||||
aliases: []
|
||||
title: 2026-04-20_08-31-52
|
||||
title: "2026-04-20 08:31:52"
|
||||
tags: []
|
||||
daily: "[[2026-04-20]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-04-20_08-31-52
|
||||
# 2026-04-20 08:31:52
|
||||
|
||||
## ConEst Schedule Meeting
|
||||
|
||||
|
||||
@@ -1,13 +1,13 @@
|
||||
---
|
||||
id: 2026-04-20_08-58-40
|
||||
id: 2026-04-20T08:58:40
|
||||
aliases: []
|
||||
title: 2026-04-20_08-58-40
|
||||
title: "2026-04-20 08:58:40"
|
||||
tags: []
|
||||
daily: "[[2026-04-20]]"
|
||||
up: "[[conest-pre-takeoff-email-template]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-04-20_08-58-40
|
||||
# 2026-04-20 08:58:40
|
||||
|
||||
## Hilltop Gardens Pre-Takeoff Email
|
||||
|
||||
@@ -25,7 +25,7 @@ Please confirm you have received this email and respond with any questions or co
|
||||
* **Document Stage:** Permit %% DD, CD, Permit, GMP, Bid, Awarded %%
|
||||
* **Drawings Date:** 2025-12-12 %% Date %%
|
||||
* **Project Manual Date:** N/A %% Date %%
|
||||
* **Proposal Date:** 2026-02-25 %% Date %%
|
||||
* **Proposal Date:** 2026-04-16 %% Date %%
|
||||
* **Takeoff Request Stage:** Full Takeoff %% Stage 1, Full takeoff, etc. %%
|
||||
|
||||
### Project Specification Callouts
|
||||
@@ -40,16 +40,21 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
* Wire: AL 1 AWG and above. _---E.4.X.X "WIRE SCHEDULE KEY NOTE"_
|
||||
%% Copper or Aluminum, Acceptable Manufacturers %%
|
||||
|
||||
* Cable Uses: Devices only, homeruns in conduit. _---E.0.X.1 - "ELECTRICAL NOTES" Note 27_
|
||||
%% Branch Homeruns %%
|
||||
|
||||
* Steel Box Depth: Not specified.
|
||||
%% 1-1/2", 2-1/8" %%
|
||||
|
||||
* Floor Boxes: _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_
|
||||
* Box Material: Hubbell B-2529 (stamped steel).
|
||||
%% Box: PVC, Sheet metal, Cast iron %%
|
||||
* Cover Material: Hubbell S-3725 (brass).
|
||||
%% Covers: Brass, Aluminum %%
|
||||
|
||||
* Wiring Devices: All 20A Toggle/Duplex. _---E.0.X.1 "ELECTRICAL NOTES" Note 45_
|
||||
|
||||
* Switchboards/Panelboards: %% Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings %%
|
||||
* Bus Material: Copper. _---E.0.X.1 "ELECTRICAL NOTES" Notes 66(G), 67(G)_
|
||||
* Breaker Type:
|
||||
@@ -59,11 +64,12 @@ Please confirm you have received this email and respond with any questions or co
|
||||
MAIN BREAKER AIC RATING IS 65K.
|
||||
UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K."
|
||||
_---E.4.X.1 "RISER NOTES" Note (B)_
|
||||
|
||||
|
||||
* Transformers:
|
||||
* Winding Material: Not specified.
|
||||
* K-Rating: Not specified.
|
||||
%% Windings AL or CU, K-rating %%
|
||||
|
||||
* Generator: N/A.
|
||||
%% Acceptable manufacturers, Enclosure Specs, Sound Rating, Remote Tank, Tank Size, Load Banks %%
|
||||
|
||||
@@ -76,25 +82,34 @@ Please confirm you have received this email and respond with any questions or co
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
* Primaries: Conduit and wiring excluded. _---Proposal 2026-02-25_
|
||||
* Primaries: (2) 4"C install only. Wiring excluded. _---Proposal 2026-04-16_
|
||||
%% Installation only, (9) 6" PVC %%
|
||||
|
||||
* Secondaries: PVC with RMC stub-ups. AL wiring.
|
||||
%% PVC UG, GRC Stub-ups, AL %%
|
||||
|
||||
* Feeders: PVC in-slab, below grade; EMT OH. AL over 100A. 2% VD.
|
||||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||||
|
||||
* Unit Subfeeds: PVC in-slab. AL wiring. 2% VD.
|
||||
%% MC OH AL, VD per Chart on E5.01 %%
|
||||
* Units: 20A Toggle/Duplex, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells
|
||||
|
||||
* Units: 20A toggle/duplex, USB rec's, disposals, thermostat wiring.
|
||||
%% 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||||
* Telecom:
|
||||
|
||||
* Telecom: (4) 4"C each building. (2) 4"C riser each building. 1"C to each unit. Assuming 28" MSDE's.
|
||||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||||
* EV Chargers:
|
||||
|
||||
* EV Chargers: (12) conduit, wire, equipment.
|
||||
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
||||
* Fire Alarm: 120V smokes in units.
|
||||
|
||||
* Fire Alarm: PVC in-slab, below grade. 120V smokes in units.
|
||||
%% Free-air where allowed by code. EMT Risers. %%
|
||||
* DAS: Pathways, conduit, wiring excluded.
|
||||
|
||||
* DAS: Sleeving and pathways only.
|
||||
%% Conduit only, Per PDI DAS Design %%
|
||||
* Low Voltage:
|
||||
|
||||
* Low Voltage: All pathways, conduit, wiring, equipment excluded.
|
||||
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
|
||||
|
||||
### Lighting Control
|
||||
@@ -103,11 +118,11 @@ Please confirm you have received this email and respond with any questions or co
|
||||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||||
|
||||
* Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
* BOH: Line voltage
|
||||
* Corridor: Digital standalone
|
||||
* Amenity: Line voltage
|
||||
* Site/Landscape: Line voltage
|
||||
* Garage: Line voltage
|
||||
* BOH: Line voltage.
|
||||
* Corridor: Digital standalone.
|
||||
* Amenity: Line voltage.
|
||||
* Site/Landscape: Line voltage.
|
||||
* Garage: Line voltage.
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
@@ -117,11 +132,11 @@ If all necessary tasks are open or completed:
|
||||
"No tasks missing."
|
||||
-->
|
||||
|
||||
%% All of these and Switchgear quote? %%
|
||||
|
||||
* ==Switchgear Quote==
|
||||
* Electrical Constructability Review
|
||||
* Electrical VDC
|
||||
* Coordination Study %% _Design Build:_ Not needed. %%
|
||||
* Coordination Study %% Design Build: Not needed. %%
|
||||
* DAS Public Safety Raceway Design
|
||||
|
||||
<!--
|
||||
|
||||