vault backup: 2026-04-20 17:01:44

This commit is contained in:
2026-04-20 17:01:45 -04:00
parent 0e63ec59c6
commit f8e92ff70d
10 changed files with 322 additions and 2 deletions
+1 -1
View File
@@ -32,7 +32,7 @@
},
"insert-yaml-attributes": {
"enabled": true,
"text-to-insert": "id:\naliases: []\ntitle:\ntags: []"
"text-to-insert": "title:\ntags: []"
},
"move-tags-to-yaml": {
"enabled": false,
+9
View File
@@ -0,0 +1,9 @@
---
id:
aliases: []
title: ConEst Projects
tags: []
---
# ConEst Projects
Link target for [[conest]] projects.
+116
View File
@@ -0,0 +1,116 @@
---
id:
aliases: []
title: Hilltop Gardens
tags: []
up: "[[conest-projects]]"
---
# Hilltop Gardens
6 buildings + clubhouse
3 building types
## ConEst Questions
### Area Breakdowns
Since residential building types have corridors
it will be necessary to create Areas for each level.
## Bid Questions
### Voltage Drop
VOLTAGE DROP CALCULATIONS ON ALL FEEDERS AND BRANCH CIRCUITS
HAVE BEEN PERFORMED IN ACCORDANCE WITH THE STATE OF FLORIDA 2023 FBC ENERGY CONSERVATION C405.5.3.
THE CONTRACTOR IS RESPONSIBLE TO BE FAMILIAR WITH THE 2020 FBC ENERGY CONSERVATION
AND SHALL UPSIZE THE CONDUCTORS FOR FEEDER AND BRANCH CIRCUITS
BASED ON THE ACTUAL ROUTING IN THE FIELD.
### Floor Boxes
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 25
> RECEPTACLES WHICH ARE SHOWN WALL MOUNTED ON THE ELECTRICAL DRAWINGS
> ON WALLS WHICH, ON THE ARCHITECTURAL DRAWINGS AND ELEVATIONS
> ARE SHOWN AS GLASS OR PARTITIONS,
> SHALL BE FLUSH FLOOR DUPLEX RECEPTACLES
> MOUNTED ADJACENT TO BASE OR WALLS.
**C405.10 Voltage drop.**
The total voltage drop across the combination of customer-owned service conductors,
feeder conductors and branch circuit conductors
shall not exceed 5 percent.
### Wiring Method Selection
[[wiring-method-selection]]
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS.
> RACEWAYS IN SLAB-ON-GRADE OR BELOW GRADE SHALL BE SCHEDULE 40 PVC.
> TRANSITIONS FROM BELOW TO ABOVE GRADE
> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET
> OR APPROVED EQUIVALENT PROTECTION.
> MET FITTINGS SHALL BE MALLEABLE IRON OR STEEL.
> CONNECTORS SHALL BE INSULATED THROAT TYPE.
#### Cable Uses
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS.
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 27
> STEEL TYPE "MC" CABLE #12 AWG AND #10 AWG
> WITH A FULL-SIZED GROUNDING CONDUCTOR
> MAY BE USED WHERE PERMITTED
> BY BOTH THE N.E.C. AND LOCAL ORDINANCE,
> IN THE FOLLOWING APPLICATIONS:
> * A. IN WALLS FOR HORIZONTAL DEVICE CONNECTION ONLY.
> HOMERUNS TO PANELBOARDS SHALL BE EMT OR PVC (BELOW GRADE).
#### Rigid Elbows
Rigid elbows are required,
but neither proposal mentions them.
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
> TRANSITIONS FROM BELOW TO ABOVE GRADE
> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET
> OR APPROVED EQUIVALENT PROTECTION.
#### Fire Alarm Wiring Methods
### Differences in Scope Between Customers
2 Customers
KAST Construction
Hedrick Brothers Construction
Different scope
DAS Conduit in separate bid item
#### Awarded to Hedrick Brothers?
BPM
2026-03-23 Nicole Bisbee:
Per correspondence from KAST
“Please note that KAST has **not** been awarded this project.
It appears the project will be undertaken by Hedrick Brothers.”
Most recent proposal to KAST is 2026-02-26.
Assuming this one can be ignored.
### AIC Ratings
> [!quote] E.4.X.1 "RISER NOTES" (B)
> ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER.
> MAIN BREAKER AIC RATING IS 65K.
> UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K.
> SEE ATTACHED DETAIL ON SHEET E-6.4 FOR FURTHER DETAILS.
### Lighting Inverters
> E.2.1.1 "KEY NOTES" 2
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
View File
+12
View File
@@ -0,0 +1,12 @@
---
id: 2026-04-19
aliases: []
title: 2026-04-19
tags: []
weekly: "[[2026w17]]"
monthly: "[[2026-04]]"
quarterly: "[[2026q2]]"
previous: "[[2026-04-18]]"
dg-publish: true
---
# 2026-04-19
+12
View File
@@ -0,0 +1,12 @@
---
id: 2026-04-20
aliases: []
title: 2026-04-20
tags: []
weekly: "[[2026w17]]"
monthly: "[[2026-04]]"
quarterly: "[[2026q2]]"
previous: "[[2026-04-19]]"
dg-publish: true
---
# 2026-04-20
+1
View File
@@ -6,6 +6,7 @@ tags:
- occupational
- status/draft
daily: "[[2026-02-11]]"
up: "[[conest-pre-takeoff-email-template]]"
dg-publish: true
---
# 2026-02-11 12:12:16
+2 -1
View File
@@ -5,8 +5,9 @@ title: 2026-03-09 15:50:49
tags:
- status/draft
daily: "[[2026-03-09]]"
date-created: 2026-03-09T15:50:49-04:00
up: "[[conest-pre-takeoff-email-template]]"
dg-publish: true
date-created: 2026-03-09T15:50:49-04:00
---
# 2026-03-09 15:50:49
+35
View File
@@ -0,0 +1,35 @@
---
id: 2026-04-20_08-31-52
aliases: []
title: 2026-04-20_08-31-52
tags: []
daily: "[[2026-04-20]]"
dg-publish: true
---
# 2026-04-20_08-31-52
## ConEst Schedule Meeting
[[conest-schedule-meeting]]
[[hilltop-gardens]]
Jared DeFanti and [[zane-meyers]]
### ConEst Town Hall Meeting Announcement
next two weeks
All one presentation
Plan to update every year
#### Agenda
High-Level
Process changes
Accubid Anywhere
#### Also Planned
Team outing announcement
+134
View File
@@ -0,0 +1,134 @@
---
id: 2026-04-20_08-58-40
aliases: []
title: 2026-04-20_08-58-40
tags: []
daily: "[[2026-04-20]]"
up: "[[conest-pre-takeoff-email-template]]"
dg-publish: true
---
# 2026-04-20_08-58-40
## Hilltop Gardens Pre-Takeoff Email
%%
Implementation of [[conest-pre-takeoff-email-template]]
for [[hilltop-gardens]].
%%
Hello Team,
Below is a comprehensive list of means & methods for Hilltop Gardens.
Please confirm you have received this email and respond with any questions or comments.
* **Delivery Method:** Plans & Specs %% Plans & Specs, Design Build, Design Assist, P&S with Approved VE %%
* **Document Stage:** Permit %% DD, CD, Permit, GMP, Bid, Awarded %%
* **Drawings Date:** 2025-12-12 %% Date %%
* **Project Manual Date:** N/A %% Date %%
* **Proposal Date:** 2026-02-25 %% Date %%
* **Takeoff Request Stage:** Full Takeoff %% Stage 1, Full takeoff, etc. %%
### Project Specification Callouts
%% Put page of Drawing or PM after answer %%
* Conduit Execution Plans:
* EMT Fittings: Not specified.
* Rigid elbows where stubbing up from grade. _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_
* PVC slab-on-grade, below grade only. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_
%% GRC, coupling specs, etc. %%
* Wire: AL 1 AWG and above. _---E.4.X.X "WIRE SCHEDULE KEY NOTE"_
%% Copper or Aluminum, Acceptable Manufacturers %%
* Cable Uses: Devices only, homeruns in conduit. _---E.0.X.1 - "ELECTRICAL NOTES" Note 27_
%% Branch Homeruns %%
* Steel Box Depth: Not specified.
%% 1-1/2", 2-1/8" %%
* Floor Boxes: _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_
* Box Material: Hubbell B-2529 (stamped steel).
%% Box: PVC, Sheet metal, Cast iron %%
* Cover Material: Hubbell S-3725 (brass).
%% Covers: Brass, Aluminum %%
* Wiring Devices: All 20A Toggle/Duplex. _---E.0.X.1 "ELECTRICAL NOTES" Note 45_
* Switchboards/Panelboards: %% Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings %%
* Bus Material: Copper. _---E.0.X.1 "ELECTRICAL NOTES" Notes 66(G), 67(G)_
* Breaker Type:
* General Panelboards: Bolt-On. _---E.0.X.1 "ELECTRICAL NOTES" Note 66(E)_
* Unit Load Centers: Plug-In. _---E.0.X.1 "ELECTRICAL NOTES" Note 67(E)_
* Interrupting Current Ratings: "ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER.
MAIN BREAKER AIC RATING IS 65K.
UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K."
_---E.4.X.1 "RISER NOTES" Note (B)_
* Transformers:
* Winding Material: Not specified.
* K-Rating: Not specified.
%% Windings AL or CU, K-rating %%
* Generator: N/A.
%% Acceptable manufacturers, Enclosure Specs, Sound Rating, Remote Tank, Tank Size, Load Banks %%
### Project Drawing/Detail Callouts
* Describe conflicts between drawings / proposal:
%% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
* Cost drivers in details not shown elsewhere on plans:
### PDI System Execution Plan
* Primaries: Conduit and wiring excluded. _---Proposal 2026-02-25_
%% Installation only, (9) 6" PVC %%
* Secondaries: PVC with RMC stub-ups. AL wiring.
%% PVC UG, GRC Stub-ups, AL %%
* Feeders: PVC in-slab, below grade; EMT OH. AL over 100A. 2% VD.
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
* Unit Subfeeds: PVC in-slab. AL wiring. 2% VD.
%% MC OH AL, VD per Chart on E5.01 %%
* Units: 20A Toggle/Duplex, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells
%% 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
* Telecom:
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
* EV Chargers:
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
* Fire Alarm: 120V smokes in units.
%% Free-air where allowed by code. EMT Risers. %%
* DAS: Pathways, conduit, wiring excluded.
%% Conduit only, Per PDI DAS Design %%
* Low Voltage:
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
### Lighting Control
* Scope: Per plans.
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
* Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
* BOH: Line voltage
* Corridor: Digital standalone
* Amenity: Line voltage
* Site/Landscape: Line voltage
* Garage: Line voltage
### Tasks/Quotes Needed for WBS
<!--
Delete any tasks completed.
If all necessary tasks are open or completed:
"No tasks missing."
-->
%% All of these and Switchgear quote? %%
* Electrical Constructability Review
* Electrical VDC
* Coordination Study %% _Design Build:_ Not needed. %%
* DAS Public Safety Raceway Design
<!--
DAS Public Safety Raceway Design is necessary
if we own DAS pathways but not the system,
since if we own the system,
the raceway design will be included in the Systems quote.
-->
Thank you,