vault backup: 2026-04-20 17:01:44
This commit is contained in:
+1
-1
@@ -32,7 +32,7 @@
|
||||
},
|
||||
"insert-yaml-attributes": {
|
||||
"enabled": true,
|
||||
"text-to-insert": "id:\naliases: []\ntitle:\ntags: []"
|
||||
"text-to-insert": "title:\ntags: []"
|
||||
},
|
||||
"move-tags-to-yaml": {
|
||||
"enabled": false,
|
||||
|
||||
@@ -0,0 +1,9 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: ConEst Projects
|
||||
tags: []
|
||||
---
|
||||
# ConEst Projects
|
||||
|
||||
Link target for [[conest]] projects.
|
||||
@@ -0,0 +1,116 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: Hilltop Gardens
|
||||
tags: []
|
||||
up: "[[conest-projects]]"
|
||||
---
|
||||
# Hilltop Gardens
|
||||
|
||||
6 buildings + clubhouse
|
||||
3 building types
|
||||
|
||||
## ConEst Questions
|
||||
|
||||
### Area Breakdowns
|
||||
|
||||
Since residential building types have corridors
|
||||
it will be necessary to create Areas for each level.
|
||||
|
||||
## Bid Questions
|
||||
|
||||
### Voltage Drop
|
||||
|
||||
VOLTAGE DROP CALCULATIONS ON ALL FEEDERS AND BRANCH CIRCUITS
|
||||
HAVE BEEN PERFORMED IN ACCORDANCE WITH THE STATE OF FLORIDA 2023 FBC ENERGY CONSERVATION C405.5.3.
|
||||
THE CONTRACTOR IS RESPONSIBLE TO BE FAMILIAR WITH THE 2020 FBC ENERGY CONSERVATION
|
||||
AND SHALL UPSIZE THE CONDUCTORS FOR FEEDER AND BRANCH CIRCUITS
|
||||
BASED ON THE ACTUAL ROUTING IN THE FIELD.
|
||||
|
||||
### Floor Boxes
|
||||
|
||||
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 25
|
||||
> RECEPTACLES WHICH ARE SHOWN WALL MOUNTED ON THE ELECTRICAL DRAWINGS
|
||||
> ON WALLS WHICH, ON THE ARCHITECTURAL DRAWINGS AND ELEVATIONS
|
||||
> ARE SHOWN AS GLASS OR PARTITIONS,
|
||||
> SHALL BE FLUSH FLOOR DUPLEX RECEPTACLES
|
||||
> MOUNTED ADJACENT TO BASE OR WALLS.
|
||||
|
||||
**C405.10 Voltage drop.**
|
||||
The total voltage drop across the combination of customer-owned service conductors,
|
||||
feeder conductors and branch circuit conductors
|
||||
shall not exceed 5 percent.
|
||||
|
||||
### Wiring Method Selection
|
||||
|
||||
[[wiring-method-selection]]
|
||||
|
||||
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
|
||||
> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS.
|
||||
> RACEWAYS IN SLAB-ON-GRADE OR BELOW GRADE SHALL BE SCHEDULE 40 PVC.
|
||||
> TRANSITIONS FROM BELOW TO ABOVE GRADE
|
||||
> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET
|
||||
> OR APPROVED EQUIVALENT PROTECTION.
|
||||
> MET FITTINGS SHALL BE MALLEABLE IRON OR STEEL.
|
||||
> CONNECTORS SHALL BE INSULATED THROAT TYPE.
|
||||
|
||||
#### Cable Uses
|
||||
|
||||
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
|
||||
> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS.
|
||||
|
||||
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 27
|
||||
> STEEL TYPE "MC" CABLE #12 AWG AND #10 AWG
|
||||
> WITH A FULL-SIZED GROUNDING CONDUCTOR
|
||||
> MAY BE USED WHERE PERMITTED
|
||||
> BY BOTH THE N.E.C. AND LOCAL ORDINANCE,
|
||||
> IN THE FOLLOWING APPLICATIONS:
|
||||
> * A. IN WALLS FOR HORIZONTAL DEVICE CONNECTION ONLY.
|
||||
> HOMERUNS TO PANELBOARDS SHALL BE EMT OR PVC (BELOW GRADE).
|
||||
|
||||
#### Rigid Elbows
|
||||
|
||||
Rigid elbows are required,
|
||||
but neither proposal mentions them.
|
||||
|
||||
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
|
||||
> TRANSITIONS FROM BELOW TO ABOVE GRADE
|
||||
> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET
|
||||
> OR APPROVED EQUIVALENT PROTECTION.
|
||||
|
||||
#### Fire Alarm Wiring Methods
|
||||
|
||||
|
||||
|
||||
### Differences in Scope Between Customers
|
||||
|
||||
2 Customers
|
||||
KAST Construction
|
||||
Hedrick Brothers Construction
|
||||
Different scope
|
||||
|
||||
DAS Conduit in separate bid item
|
||||
|
||||
#### Awarded to Hedrick Brothers?
|
||||
|
||||
BPM
|
||||
2026-03-23 Nicole Bisbee:
|
||||
Per correspondence from KAST
|
||||
“Please note that KAST has **not** been awarded this project.
|
||||
It appears the project will be undertaken by Hedrick Brothers.”
|
||||
|
||||
Most recent proposal to KAST is 2026-02-26.
|
||||
Assuming this one can be ignored.
|
||||
|
||||
### AIC Ratings
|
||||
|
||||
> [!quote] E.4.X.1 "RISER NOTES" (B)
|
||||
> ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER.
|
||||
> MAIN BREAKER AIC RATING IS 65K.
|
||||
> UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K.
|
||||
> SEE ATTACHED DETAIL ON SHEET E-6.4 FOR FURTHER DETAILS.
|
||||
|
||||
### Lighting Inverters
|
||||
|
||||
> E.2.1.1 "KEY NOTES" 2
|
||||
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
|
||||
@@ -0,0 +1,12 @@
|
||||
---
|
||||
id: 2026-04-19
|
||||
aliases: []
|
||||
title: 2026-04-19
|
||||
tags: []
|
||||
weekly: "[[2026w17]]"
|
||||
monthly: "[[2026-04]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-04-18]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-04-19
|
||||
@@ -0,0 +1,12 @@
|
||||
---
|
||||
id: 2026-04-20
|
||||
aliases: []
|
||||
title: 2026-04-20
|
||||
tags: []
|
||||
weekly: "[[2026w17]]"
|
||||
monthly: "[[2026-04]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-04-19]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-04-20
|
||||
@@ -6,6 +6,7 @@ tags:
|
||||
- occupational
|
||||
- status/draft
|
||||
daily: "[[2026-02-11]]"
|
||||
up: "[[conest-pre-takeoff-email-template]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-02-11 12:12:16
|
||||
|
||||
@@ -5,8 +5,9 @@ title: 2026-03-09 15:50:49
|
||||
tags:
|
||||
- status/draft
|
||||
daily: "[[2026-03-09]]"
|
||||
date-created: 2026-03-09T15:50:49-04:00
|
||||
up: "[[conest-pre-takeoff-email-template]]"
|
||||
dg-publish: true
|
||||
date-created: 2026-03-09T15:50:49-04:00
|
||||
---
|
||||
# 2026-03-09 15:50:49
|
||||
|
||||
|
||||
@@ -0,0 +1,35 @@
|
||||
---
|
||||
id: 2026-04-20_08-31-52
|
||||
aliases: []
|
||||
title: 2026-04-20_08-31-52
|
||||
tags: []
|
||||
daily: "[[2026-04-20]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-04-20_08-31-52
|
||||
|
||||
## ConEst Schedule Meeting
|
||||
|
||||
[[conest-schedule-meeting]]
|
||||
|
||||
[[hilltop-gardens]]
|
||||
Jared DeFanti and [[zane-meyers]]
|
||||
|
||||
### ConEst Town Hall Meeting Announcement
|
||||
|
||||
next two weeks
|
||||
|
||||
All one presentation
|
||||
Plan to update every year
|
||||
|
||||
#### Agenda
|
||||
|
||||
High-Level
|
||||
|
||||
Process changes
|
||||
|
||||
Accubid Anywhere
|
||||
|
||||
#### Also Planned
|
||||
|
||||
Team outing announcement
|
||||
@@ -0,0 +1,134 @@
|
||||
---
|
||||
id: 2026-04-20_08-58-40
|
||||
aliases: []
|
||||
title: 2026-04-20_08-58-40
|
||||
tags: []
|
||||
daily: "[[2026-04-20]]"
|
||||
up: "[[conest-pre-takeoff-email-template]]"
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-04-20_08-58-40
|
||||
|
||||
## Hilltop Gardens Pre-Takeoff Email
|
||||
|
||||
%%
|
||||
Implementation of [[conest-pre-takeoff-email-template]]
|
||||
for [[hilltop-gardens]].
|
||||
%%
|
||||
|
||||
Hello Team,
|
||||
|
||||
Below is a comprehensive list of means & methods for Hilltop Gardens.
|
||||
Please confirm you have received this email and respond with any questions or comments.
|
||||
|
||||
* **Delivery Method:** Plans & Specs %% Plans & Specs, Design Build, Design Assist, P&S with Approved VE %%
|
||||
* **Document Stage:** Permit %% DD, CD, Permit, GMP, Bid, Awarded %%
|
||||
* **Drawings Date:** 2025-12-12 %% Date %%
|
||||
* **Project Manual Date:** N/A %% Date %%
|
||||
* **Proposal Date:** 2026-02-25 %% Date %%
|
||||
* **Takeoff Request Stage:** Full Takeoff %% Stage 1, Full takeoff, etc. %%
|
||||
|
||||
### Project Specification Callouts
|
||||
|
||||
%% Put page of Drawing or PM after answer %%
|
||||
|
||||
* Conduit Execution Plans:
|
||||
* EMT Fittings: Not specified.
|
||||
* Rigid elbows where stubbing up from grade. _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_
|
||||
* PVC slab-on-grade, below grade only. _---E.0.X.1 "ELECTRICAL NOTES" Note 32_
|
||||
%% GRC, coupling specs, etc. %%
|
||||
|
||||
* Wire: AL 1 AWG and above. _---E.4.X.X "WIRE SCHEDULE KEY NOTE"_
|
||||
%% Copper or Aluminum, Acceptable Manufacturers %%
|
||||
* Cable Uses: Devices only, homeruns in conduit. _---E.0.X.1 - "ELECTRICAL NOTES" Note 27_
|
||||
%% Branch Homeruns %%
|
||||
* Steel Box Depth: Not specified.
|
||||
%% 1-1/2", 2-1/8" %%
|
||||
* Floor Boxes: _---E.0.X.1 "ELECTRICAL NOTES" Notes 53, 54_
|
||||
* Box Material: Hubbell B-2529 (stamped steel).
|
||||
%% Box: PVC, Sheet metal, Cast iron %%
|
||||
* Cover Material: Hubbell S-3725 (brass).
|
||||
%% Covers: Brass, Aluminum %%
|
||||
* Wiring Devices: All 20A Toggle/Duplex. _---E.0.X.1 "ELECTRICAL NOTES" Note 45_
|
||||
* Switchboards/Panelboards: %% Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings %%
|
||||
* Bus Material: Copper. _---E.0.X.1 "ELECTRICAL NOTES" Notes 66(G), 67(G)_
|
||||
* Breaker Type:
|
||||
* General Panelboards: Bolt-On. _---E.0.X.1 "ELECTRICAL NOTES" Note 66(E)_
|
||||
* Unit Load Centers: Plug-In. _---E.0.X.1 "ELECTRICAL NOTES" Note 67(E)_
|
||||
* Interrupting Current Ratings: "ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER.
|
||||
MAIN BREAKER AIC RATING IS 65K.
|
||||
UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K."
|
||||
_---E.4.X.1 "RISER NOTES" Note (B)_
|
||||
|
||||
* Transformers:
|
||||
* Winding Material: Not specified.
|
||||
* K-Rating: Not specified.
|
||||
%% Windings AL or CU, K-rating %%
|
||||
* Generator: N/A.
|
||||
%% Acceptable manufacturers, Enclosure Specs, Sound Rating, Remote Tank, Tank Size, Load Banks %%
|
||||
|
||||
### Project Drawing/Detail Callouts
|
||||
|
||||
* Describe conflicts between drawings / proposal:
|
||||
%% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
|
||||
|
||||
* Cost drivers in details not shown elsewhere on plans:
|
||||
|
||||
### PDI System Execution Plan
|
||||
|
||||
* Primaries: Conduit and wiring excluded. _---Proposal 2026-02-25_
|
||||
%% Installation only, (9) 6" PVC %%
|
||||
* Secondaries: PVC with RMC stub-ups. AL wiring.
|
||||
%% PVC UG, GRC Stub-ups, AL %%
|
||||
* Feeders: PVC in-slab, below grade; EMT OH. AL over 100A. 2% VD.
|
||||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||||
* Unit Subfeeds: PVC in-slab. AL wiring. 2% VD.
|
||||
%% MC OH AL, VD per Chart on E5.01 %%
|
||||
* Units: 20A Toggle/Duplex, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells
|
||||
%% 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||||
* Telecom:
|
||||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||||
* EV Chargers:
|
||||
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
||||
* Fire Alarm: 120V smokes in units.
|
||||
%% Free-air where allowed by code. EMT Risers. %%
|
||||
* DAS: Pathways, conduit, wiring excluded.
|
||||
%% Conduit only, Per PDI DAS Design %%
|
||||
* Low Voltage:
|
||||
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
|
||||
|
||||
### Lighting Control
|
||||
|
||||
* Scope: Per plans.
|
||||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||||
|
||||
* Area: %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||||
* BOH: Line voltage
|
||||
* Corridor: Digital standalone
|
||||
* Amenity: Line voltage
|
||||
* Site/Landscape: Line voltage
|
||||
* Garage: Line voltage
|
||||
|
||||
### Tasks/Quotes Needed for WBS
|
||||
|
||||
<!--
|
||||
Delete any tasks completed.
|
||||
If all necessary tasks are open or completed:
|
||||
"No tasks missing."
|
||||
-->
|
||||
|
||||
%% All of these and Switchgear quote? %%
|
||||
|
||||
* Electrical Constructability Review
|
||||
* Electrical VDC
|
||||
* Coordination Study %% _Design Build:_ Not needed. %%
|
||||
* DAS Public Safety Raceway Design
|
||||
|
||||
<!--
|
||||
DAS Public Safety Raceway Design is necessary
|
||||
if we own DAS pathways but not the system,
|
||||
since if we own the system,
|
||||
the raceway design will be included in the Systems quote.
|
||||
-->
|
||||
|
||||
Thank you,
|
||||