vault backup: 2026-02-19 11:37:13
This commit is contained in:
Vendored
+1
-1
@@ -74,6 +74,6 @@
|
||||
"repelStrength": 13.3854166666667,
|
||||
"linkStrength": 1,
|
||||
"linkDistance": 250,
|
||||
"scale": 0.13163395511370124,
|
||||
"scale": 0.1316339551137012,
|
||||
"close": false
|
||||
}
|
||||
@@ -21,17 +21,17 @@ is insufficient for [[full-takeoff]].
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
#### Misc Budgets
|
||||
#### Temporary Power
|
||||
|
||||
* [[misc-budgets#Temporary Power & Lighting]]
|
||||
* [[misc-budgets#Irrigation Pumps]]
|
||||
* [[temp-power-takeoff#Temporary Power & Lighting Takeoff]]
|
||||
* [[temp-power-takeoff#Irrigation Pumps]]
|
||||
|
||||
#### Feeders
|
||||
|
||||
##### Primaries & Secondaries
|
||||
|
||||
* [[feeders#Primaries]]
|
||||
* [[feeders#Secondaries]]
|
||||
* [[feeders-takeoff#Primaries]]
|
||||
* [[feeders-takeoff#Secondaries]]
|
||||
|
||||
##### Feeders
|
||||
|
||||
@@ -48,11 +48,11 @@ Budget per Unit Count. Compare to Bid Sheet.
|
||||
|
||||
##### Generator
|
||||
|
||||
See [[switchgear#Generator]].
|
||||
See [[switchgear-takeoff#Generator]].
|
||||
|
||||
#### Subfeeds
|
||||
|
||||
Budget per Unit Count. Compare to Bid Sheet.
|
||||
|
||||
> [!info] Alternate method as described by Joel
|
||||
> Takeoff per [[subfeeds]], use average for length.
|
||||
> Takeoff per [[subfeeds-takeoff]], use average for length.
|
||||
|
||||
+18
-12
@@ -16,27 +16,25 @@ dg-publish: true
|
||||
|
||||
[[pdi-breakdowns]]
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
## Prerequisites
|
||||
|
||||
1. [[pdi-conest-project-setup]]
|
||||
2. [[pre-takeoff-research]]
|
||||
3. [[pdi-pre-takeoff-confirmation]]
|
||||
|
||||
### 2. Takeoff
|
||||
## Sequence
|
||||
|
||||
> [!important] Disclaimer
|
||||
> These scripts are intended to cover all cases, but may not.
|
||||
> Variations should be corrected.
|
||||
|
||||
#### Stage 1
|
||||
### Stage 1
|
||||
|
||||
1. [[feeders-takeoff]]
|
||||
2. [[subfeeds-takeoff]]
|
||||
3. [[switchgear-takeoff]]
|
||||
|
||||
#### Stage 2
|
||||
### Stage 2
|
||||
|
||||
4. [[units-takeoff]]
|
||||
5. [[fixtures-takeoff]]
|
||||
@@ -45,14 +43,22 @@ dg-publish: true
|
||||
8. [[telecom-takeoff]]
|
||||
9. [[low-voltage-takeoff]]
|
||||
10. [[fire-alarm-takeoff]]
|
||||
11. [[standalone-systems-takeoff]]
|
||||
12. [[misc-budgets-takeoff]]
|
||||
13. [[temp-power-takeoff]]
|
||||
11. [[misc-budgets-takeoff]]
|
||||
12. [[temp-power-takeoff]]
|
||||
|
||||
### See Also
|
||||
|
||||
1. [[two-way-takeoff]]
|
||||
2. [[distributed-antenna-systems-takeoff]]
|
||||
3. [[carbon-monoxide-detection-takeoff]]
|
||||
4. [[lightning-protection-takeoff]]
|
||||
|
||||
[[general-takeoff]]
|
||||
|
||||
### 3. Review
|
||||
### Review
|
||||
|
||||
1. [[takeoff-review]]
|
||||
2. [[pdi-labor-plan]]
|
||||
3. [[pdi-material-pricing]]
|
||||
|
||||
## Next Steps
|
||||
|
||||
[[pdi-accubid-closeout]]
|
||||
|
||||
@@ -0,0 +1,21 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: PDI Accubid Closeout
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent/entry-point
|
||||
- occupational/closeout
|
||||
- status/draft
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout
|
||||
|
||||
Also called "tabs",
|
||||
closeout is the stage of a construction estimate
|
||||
where
|
||||
|
||||
1. [[pdi-labor-plan]]
|
||||
2. [[pdi-material-pricing]]
|
||||
3. [[pdi-accubid-equipment]]
|
||||
@@ -5,7 +5,7 @@ title: PDI Accubid Equipment
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
---
|
||||
|
||||
@@ -28,6 +28,9 @@ The role of ConEst is to provide context to Bid estimates.
|
||||
|
||||
* [[design-build-budget]]
|
||||
* [[full-takeoff]]
|
||||
|
||||
#### ConEst Deliverables
|
||||
|
||||
* [[pdi-project-start-notification]]
|
||||
|
||||
#### ConEst Terminology
|
||||
|
||||
+1
-1
@@ -4,7 +4,7 @@ aliases: []
|
||||
tags:
|
||||
- authorship/other-for-now
|
||||
- destiny/permanent
|
||||
- occupational
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
title: PDI Labor Plan
|
||||
|
||||
@@ -3,7 +3,7 @@ id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational
|
||||
- occupational/closeout
|
||||
- status/draft
|
||||
- type/guide
|
||||
- authorship/original
|
||||
|
||||
@@ -1,28 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- destiny/permanent
|
||||
- occupational/takeoff
|
||||
- status/draft
|
||||
- type/guide
|
||||
- authorship/original
|
||||
title: Standalone Systems
|
||||
dg-publish: true
|
||||
---
|
||||
# Standalone Systems
|
||||
|
||||
## Info
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Preparation
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. [[two-way-takeoff]]
|
||||
2. [[distributed-antenna-systems-takeoff]]
|
||||
3. [[carbon-monoxide-detection-takeoff]]
|
||||
4. [[lightning-protection-takeoff]]
|
||||
|
||||
### 3. Review
|
||||
@@ -46,6 +46,12 @@ dg-publish: true
|
||||
> and creating them new for each unit,
|
||||
> since the types required can vary greatly between units.
|
||||
|
||||
> [!tip]
|
||||
> Consider using a "Typical - All Units"
|
||||
> for scope identical between all unit types.
|
||||
> * WAP Outlets
|
||||
> * MSDE's
|
||||
|
||||
### Load Centers
|
||||
|
||||
* `System` = "EL - Electrical"
|
||||
|
||||
Reference in New Issue
Block a user