vault backup: 2026-05-01 16:24:18

This commit is contained in:
2026-05-01 16:24:18 -04:00
parent f7c50ed0d2
commit eb30cdb79c
71 changed files with 155 additions and 135 deletions
+1 -1
View File
@@ -35,4 +35,4 @@ and estimation
It's not engineering to budget for the most likely case.
Estimators need not know _why_ there tends to be ~~example~~,
they need need only have basis for applying that generalization to another project.
they need only have basis for applying that generalization to another project.
+1 -1
View File
@@ -12,7 +12,7 @@ daily: "[[2025-10-31]]"
_Friday Evening_
This morning as I was leaving for work I saw a massive congregation
of all the walky water birds I love so much. A hundred and more, milling about
of all the walky water [[birds]] I love so much. A hundred and more, milling about
in-the early sunrise. The banks were covered in ibises picking at the grass
around the feet of egrets standing proudly and spaced just so. A dozen anhingas
splashed messily in the center of the pond while a lone stork looked on with
+2 -2
View File
@@ -13,8 +13,8 @@ _Saturday Morning_
Somehow I've already let an hour get away from me.
Today I need to do some cleaning: a load of laundry and leftover dishes
at least. I'll do those after I finish this note, plus some pushups, before
I shower and change to go visit the birds across the street. Later I'll need
to go to the store for more sliced almonds and coconut oil so I can make gran­ola
I shower and change to go visit the [[birds]] across the street. Later I'll need
to go to the store for more sliced almonds and coconut oil so I can make [[gran­ola]]
for tomorrow's breakfast. I'll go to Walmart so I can get a new mattress
protector, too. Copy paper, a 3-hole punch and a small binder would also be
nice for my typewriter journaling.
+1 -1
View File
@@ -12,4 +12,4 @@ _Saturday Morning_
I wasted more time doomscrolling after my last note, but I did manage
to do the laundry, dishes, and pushups. Now I need to shower and dress in time
to see the birds.
to see the [[birds]].
+2 -2
View File
@@ -10,8 +10,8 @@ daily: "[[2025-11-01]]"
# 2025-11-01 08:25:??
There were fewer than yesterday, but still a ton. There was a chill, but
I was dressed well for it. I think with exposure the birds will get used to
mg presence. I saw a bald eagle (_Haliaeetus leucocephalus_) for the first time
I was dressed well for it. I think with exposure the [[birds]] will get used to
my presence. I saw a bald eagle (_Haliaeetus leucocephalus_) for the first time
in Florida. They are ugly creatures, of both body and spirit, unlike the wood
stork (_Mycteria americana_) which is uglier of body, but pure of heart.
There was also some guy getting dumped on the phone and not taking it well.
+2 -3
View File
@@ -36,10 +36,9 @@ This analysis of 334.12(A)(2) is flawed.
Based on the [[nfpa-70_100_definitions|Article 100]] definitions
of [[nfpa-70_100_definitions#Exposed (as applied to wiring methods).|exposed]]
and [[nfpa-70_100_definitions#Dwelling, Multifamily.|dwelling]],
[[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|334.12(A)(2)]]
can be paraphrased as follows:
334.12(A)(2) can be paraphrased as follows:
> [!cite] NEC 334.12(A)(2), pp.
> [!cite] [[nfpa-70_334_nm-cable#334.12(A) Types NM and NMC.|NEC 334.12(A)(2)]], pp.
> Types NM and NMC cable are not permitted to be installed
> in accessible spaces above suspended ceilings,
> _except in buildings containing one or more dwelling units._
+2 -2
View File
@@ -10,9 +10,9 @@ daily: "[[2025-11-11]]"
_Tuesday Morning, Before Work_
One of the most appealing aspects of estimating
One of the most appealing aspects of [[construction-estimating]]
to me is the dynamic we have with our employers.
my experience was at Ace that estimators act like,
my experience was at [[ace-electric-inc|Ace]] that estimators act like,
and are treated like good artists, like loveable
little scamps who always get into trouble, but
you keep them around because they do good work.
+2 -2
View File
@@ -9,11 +9,11 @@ daily: "[[2025-11-11]]"
---
# 2025-11-11 14:41:??
I just saw a post on a construction estimators forum
I just saw a post on a [[construction-estimating|construction estimators]] forum
from a user lamenting that their coworkers and customers
largely do not understand the difference between markup and margin.
It made me remember the micro-debates about that I would have with Dale
It made me remember the micro-debates about that I would have with [[dale-flythe|Dale]]
every time we were closing out an estimate.
This is the example I would always give
while trying to explain it to him.
+1 -1
View File
@@ -7,7 +7,7 @@ daily: "[[2025-11-13]]"
---
# 2025-11-13 08:03:??
I was thinking about recent critiques of my writing style
I was thinking about recent critiques of my [[writing]] style
and how they don't really apply to my speech,
even though I don't imagine myself approaching them differently.
+1 -1
View File
@@ -10,7 +10,7 @@ daily: "[[2025-11-13]]"
I'm still working on articulating
my main difficulty in the transition
from Ace to PDI estimating.
from [[ace-electric-inc|Ace]] to [[power-design-inc|PDI]] estimating.
At a high level,
it's that our process is built on _instrumental_ methods,
+1 -4
View File
@@ -38,10 +38,7 @@ Fire stopping budget = $25-35 per Unit.
Robotic Total Station hours: match Structural Foreman.
For contracts 5--15 million dollars:
$$
\text{Equipment Cost} \approx 1\%
$$
Equipment Cost $$\approx$$ 1% of Contract Value
Mid Atlantic: 1 trip per month
+7 -3
View File
@@ -9,6 +9,12 @@ daily: "[[2025-11-21]]"
---
# 2025-11-21 10:11:??
## "Hours Burned vs. Hours Earned"
%%
A criticism of [[earned-value-management]] in [[construction]].
%%
> [!quote] [ELECTRI's Industry Benchmarking Tool - ELECTRI International](https://www.electri.org/research-overview/electris-industry-benchmarking-tool/)
> ### Hours Burned vs. Hours Earned
>
@@ -23,7 +29,7 @@ This is a terribly problematic metric.
If a project went over its material budget
despite standard rigorous oversight
where would you first look,
construction or estimating?
operations or estimating?
In almost all cases the safer bet is estimating.
Why should labor be different?
@@ -31,6 +37,4 @@ Wherever there is budget variance
there is a persistent tendency to blame construction
before estimating.
[[earned-value-management-in-construction-estimating]]
[[purpose-of-construction-estimating#The Myth of Estimate Accuracy]]
+5
View File
@@ -9,6 +9,11 @@ daily: "[[2025-11-24]]"
## Extracting PDF Panel Schedules
%%
steps to extract panel schedule data
from [[pdf]] drawings
%%
Extract relevant pages
Crop Sheet Titles
+1 -1
View File
@@ -8,7 +8,7 @@ daily: "[[2025-12-02]]"
### Set Notation Example
Let $A$ and $B$ be sets
Let $A$ and $B$ be [[set-theory|sets]]
sharing some but not all elements.
* $A \cap B \neq \varnothing$:
+5
View File
@@ -8,6 +8,11 @@ daily: "[[2025-12-02]]"
### Panel Schedule Relationship Diagram
%%
brainstorming abstractions for `Panelboard` objects,
possibly for use in custom [[construction-estimating-software]].
%%
#### Sections
A panelboard with multiple sections
+1 -1
View File
@@ -14,7 +14,7 @@ and as frameworks for general decision-making.
The idea that one could devote significant thought
into making a decision aligned with their [[personal-values]]
and fail to pick the best option to that end is intriguing to me,
more so that an accurate quantization of ones values
moreso that an accurate quantization of ones values
and that the appropriate framework could trivialize all such decisions.
Personal decision-making is often described
+4 -1
View File
@@ -8,6 +8,8 @@ daily: "[[2026-02-12]]"
---
# 2026-02-12 09:49:56
[[electrical-construction]]
### Interrupting Rating
* "short-circuit interrupting rating"
@@ -25,7 +27,8 @@ Measured in amperes, usually shown as kAIC.
[[nfpa-70_110_requirements#^10|NEC 110.10 Circuit Impedance, Short-Circuit Current Ratings, and Other Characteristics.]]
Applies to **assemblies**: distribution equipment like switchboards, panelboards, switches, etc.
Applies to **assemblies**: distribution equipment
like switchboards, panelboards, switches, etc.
Maximum current that the equipment can withstand
in a short-circuit event without damage.