35 lines
947 B
Markdown
35 lines
947 B
Markdown
---
|
|
title: "PDI Accubid Closeout: Quoted Material"
|
|
tags:
|
|
- occupational/closeout
|
|
- type/guide
|
|
up: "[[pdi-accubid-closeout]]"
|
|
---
|
|
# PDI Accubid Closeout: Quoted Material
|
|
|
|
> [!important]
|
|
> Quoted material costs must be ==pre-tax==.
|
|
|
|
## Fixtures
|
|
|
|
* **Vendor** <- "PDR - {Quote Type}" (e.g. "PDR - Spec/Equal", "PDR - VE")
|
|
* **Quote** <- Per PDI Systems proposal
|
|
* **Notes** <- Quote date
|
|
|
|
> [!tip]
|
|
> PDR fixture quotes are usually broken out by area type,
|
|
> buy it is not necessary to preserve this breakdown in the estimate.
|
|
> Use the sum total cost in a single Quoted Materials line item.
|
|
|
|
## Switchgear
|
|
|
|
* **Vendor** <- Per quote (or "PDI BUDGET" if not available)
|
|
* **Quote** <- Per quote (or Bid Sheet Budget if not available)
|
|
* **Notes** <- Quote Date
|
|
|
|
## Generator
|
|
|
|
* **Vendor** <- Per quote (or "PDI BUDGET" if not available)
|
|
* **Quote** <- Per quote (or Bid Sheet Budget if not available)
|
|
* **Notes** <- Quantity, Size in kW, Quote Date
|