Files
zmVault/timestamped/2026-06-02_13-24-36.md
T

18 lines
471 B
Markdown

---
id: 2026-06-02T13:24:36-0400
title: 2026-06-02 13:24:36
tags: []
daily: "[[2026-06-02]]"
---
# 2026-06-02 13:24:36
The purpose of [[conest]]
must have been much easier to recognize
when it was still post-award.
Now we're sort of under [[pdi-bid-estimating|Bid]],
but I don't think our stakeholders or their expectations have changed.
We have to be pre-award not to help Bid
(although that is a useful side effect)
but so that the [[pdi-wbs|WBS]] is ready at award.