303 Mariposa Residence Pre-takeoff Confirmation Email Review

Consultation with josh-ford regarding conest-pre-takeoff-confirmation for 303-mariposa-residence.

The project being a single family home, primary estimator jared-defanti requested Josh's aid with precise wording and takeoff assumptions.

Questions

[!quote] Proposal 2026-05-06 _Telecom, Data & Cable TV _

49. Back boxes and stub ups "As required"

Josh confirmed we are to exclude backboxes and stub-ups from takeoff.

Other Direction

Metal Boxes

Highlight 12 AWG minimum, metal boxes; add note "please confirm".

PVC Conduit

Confirmed no PVC except secondaries. Secondaries PVC40 with PVC80 elbow and stub-up.

Project Drawing/Detail Callouts

Delete section conest-pre-takeoff-email-template#Project Drawing/Detail Callouts since empty.

Fire Alarm

Use TERMINAL CABINET not HEAD END.

Did not specifically discuss with Josh, but assuming free-air assemblies for devices

Lighting Control

Confirmed 0-10V/Line voltage dimming per schedule.

Use "Low voltage" (rough-in only) assemblies

Note "rough-in only" in email.

Josh pointed out dimming receptacles.

Low Voltage

Add new line: "Shade Control: System is alternate, do we own rough-in?".

Other

Josh noted that conest#ConEst Senior Estimator appreciate the new conest-pre-takeoff-confirmation process because they feel more familiar with the job when in conest-senior-review.