## Pre-Takeoff Email Template Meeting
|
|
|
|
Meeting lead by [[josh-ford]]
|
|
to discuss acceptable use of [[conest-pre-takeoff-email-template]].
|
|
|
|
### Topics
|
|
|
|
#### Purpose
|
|
|
|
Reiterated intent to replace OneNote,
|
|
however stated that OneNote might (even should)
|
|
be used to track
|
|
|
|
Intent is too provide information to the bid team
|
|
potentially to be qualified in future bids.
|
|
|
|
> 1. ConEst deviates from specs based on direction from [[pdi-bid-estimating|Bid]].
|
|
> 2. Awarded contract does not include respect for the direction
|
|
> 3. Ops, not aware of direction, believes ConEst takeoff was in error.
|
|
|
|
Intent is to improve transparency,
|
|
an area the OneNote is poor in.
|
|
|
|
***
|
|
|
|
Direction from [[aaron-permuy]] to improve turnaround
|
|
while maintaining standards
|
|
including presentability of information;
|
|
raise issues with missing BPM tasks ASAP
|
|
rather than being the "task police",
|
|
hounding Bid at the very end.
|
|
|
|
> [!quote] [[2026-02-27_13-58-30]]
|
|
> > [!quote] Peer @ 15:36
|
|
> > > They (whoever _They_ is) want Bid to handle more volume,
|
|
> > > which requires that Bid spend less time on a single estimate,
|
|
> > > which requires ConEst to pick up slack to maintain the same rigor.
|
|
> >
|
|
> > Where does this come from?
|
|
>
|
|
> > [!quote] Me @ 15:53
|
|
> > More baseless speculation.
|
|
|
|
***
|
|
|
|
"Why is Bid not providing this to us?"
|
|
|
|
ConEst has more time to review.
|
|
|
|
Intent is to have conversations before contract
|
|
|
|
There will be bad estimates, bad proposals,
|
|
but ConEst's role is to prevent PDI _from making bad deals_
|
|
|
|
> [!quote] [[joel-jansen]], pp.
|
|
> Similar could be said by Ops about ConEst.
|
|
> ~~They have more time than us~~
|
|
|
|
#### Use
|
|
|
|
Only when we're touching a job for the first time,
|
|
not revisions.
|
|
|
|
Template should be pasted into the email body,
|
|
not sent as attachment.
|
|
To be revisited in audit meeting [[2026w13|next week]].
|
|
|
|
cc: Josh Ford, Corwin Fluitt, Jessalyn
|
|
|
|
Other media were considered,
|
|
but email text was determined to be optimal
|
|
to prevent lost attachments and broken links.
|
|
|
|
Consistency in formatting is prioritized
|
|
ConEst resources to be allocated by availability, not region.
|
|
|
|
Response from Bid is necessary within three days.
|
|
|
|
"See proposal" is unacceptable response.
|
|
Escalate issue.
|
|
|
|
#### Acceptable Manufacturers
|
|
|
|
> [!example] [[sunset-amphitheater]]
|
|
> Cummins generator was spec'd, quoted,
|
|
> but not used in estimate because it was not cheapest.
|
|
|
|
Josh, Corwin, Procurement
|
|
to provide a list of "typical PDI manufactures"
|
|
for Wire, Generator, Switchgear
|
|
rather than include entire list from specs.
|
|
|
|
> Wire:
|
|
> * Encore
|
|
> * Okonite
|
|
> * Southwire
|
|
|
|
#### Project Drawing/Detail Callouts
|
|
|
|
[[conest-pre-takeoff-email-template#Project Drawing/Detail Callouts]]
|
|
|
|
High-cost impact items
|
|
not mentioned in proposal
|
|
not shown in Bid Sheet.
|
|
|
|
* dimming in units
|
|
* balcony pedestals
|
|
|
|
#### Lighting Control
|
|
|
|
[[conest-pre-takeoff-email-template#Lighting Control]]
|
|
|
|
Intent is to provoke conversation ahead of takeoff
|
|
to prevent rework
|
|
|
|
not necessary to list all areas
|
|
if not applicable to project
|
|
(code minimum)
|
|
|
|
#### Tasks/Quotes Needed for WBS
|
|
|
|
[[conest-pre-takeoff-email-template#Tasks/Quotes Needed for WBS]]
|
|
|
|
> BPM has both
|
|
> tasks within bid round and
|
|
> tasks outside of bid round.
|
|
|
|
To be revisited in [[2026-03-25_13-17-35#BPM Tasks Meeting|dedicated meeting]]
|
|
|
|
### Meetings to Follow
|
|
|
|
* ConEst Audit Scorecard --- [[2026-03-25]]
|
|
* BPM Tasks Meeting --- TBD
|
|
* ConEst Town Hall --- TBD
|