# 2026-01-22
|
||
|
||
## 2026-01-22 09:55
|
||
|
||
The lighting drawings for
|
||
450-460 James Robertson Parkway Phase II
|
||
(fka James Roberston Pkwy Mixed Use Development)
|
||
show occupancy sensors serving electrical rooms.
|
||
I knew this was understood to be prohibited,
|
||
but could not have provided a code reference.
|
||
|
||
[[nfpa-70_110_requirements#110.26(D) Illumination.|110.26(D)]]
|
||
is the relevant section.
|
||
|
||
## 2026-01-22 11:58
|
||
|
||
### 463 Davison Contract Dates
|
||
|
||
[[463-davison-ave-ne]]
|
||
|
||
Effective date: [[2026-01-21]]
|
||
|
||
* [x] Escrow deposit due by [[2026-01-26]]
|
||
* [ ] Loan application submitted by [[2026-01-26]]
|
||
* [ ] Inspection period ends [[2026-01-28]]
|
||
* [ ] Loan approval due by [[2026-02-11]]
|
||
* [ ] Title commitment due by [[2026-02-27]]
|
||
|
||
Closing: [[2026-03-04]]
|
||
|
||
## 2026-01-22 14:56
|
||
|
||
### Accurate Budget Vs. Accurate BOM
|
||
|
||
#### Quote
|
||
|
||
> [!quote] Joel Jansen [[2026-01-15#2026-01-15 13:27]] (pp.)
|
||
> I'd rather have an accurate budget than an accurate BOM.
|
||
|
||
#### Context
|
||
|
||
#### Analysis
|
||
|
||
It may be counterintuitive to BOM-oriented estimators
|
||
(typical of those with an electrical background),
|
||
but deviating from ~~common practice~~
|
||
to make an assembly "more accurate"
|
||
(read: to make the estimate BOM
|
||
more closely resemble the construction BOM),
|
||
may make the budget _less_ accurate.
|
||
|
||
The review and adjustment process is based on ~~common practice~~,
|
||
|
||
Our assemblies do not include screws
|
||
It would be more accurate to the BOM to add them,
|
||
but we budget for that cost in the summary,
|
||
so to do so would be double dipping.
|
||
|
||
Though not stated as such,
|
||
we budget for takeoff-to-install deviations the same way.
|
||
|
||
\
|
||
|
||
An organization's takeoff database
|
||
ought to include exactly what is necessary for takeoff
|
||
at the acceptable level of detail, and nothing else.
|
||
It ought to be assumed by estimators that the previous is true,
|
||
and that acceptable takeoff of any scope
|
||
must be possible with the contents of the database.
|