## Info
|
|
|
|
* Security/Intrusion Detection
|
|
* Access Control
|
|
* CCTV
|
|
* Audio-Visual
|
|
* Wi-Fi
|
|
|
|
Not to be confused with [[telecom]].
|
|
|
|
### Routing
|
|
|
|
#### Exposed Ceilings
|
|
|
|
EMT to accessible space?
|
|
PVC to MDF?
|
|
|
|
#### Devices
|
|
|
|
#### Daisy Chaining
|
|
|
|
how many devices (if any)
|
|
|
|
## Sequence
|
|
|
|
### 1. Preparation
|
|
|
|
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
|
* Cabling
|
|
* Conduit & Pathways
|
|
* Sleeving
|
|
2. In the drawings, locate:
|
|
* Floor plans where LV scope is shown
|
|
* LV Details
|
|
3. Read about the project specifications and construction type
|
|
4. Fill out OneNote
|
|
|
|
### 2. Takeoff
|
|
|
|
1. Takeoff devices as shown throughout the building
|
|
2. Takeoff riser conduit as needed
|
|
|
|
### 3. Review
|
|
|
|
1. Sleeving for riser
|