58 lines
1.5 KiB
Markdown
58 lines
1.5 KiB
Markdown
---
|
|
id:
|
|
aliases: []
|
|
tags:
|
|
- estimating
|
|
---
|
|
# Construction Estimating
|
|
|
|
Construction estimating is a subset of cost estimation.
|
|
|
|
## Purpose
|
|
|
|
The purpose of [[construction-estimating]] in practice
|
|
is not to determine the cost of the scope,
|
|
which would take far longer than allotted for bid,
|
|
|
|
### For the Solicitor
|
|
|
|
* Determine feasibility of functional requirements
|
|
|
|
> [!info] Type 2 Owners
|
|
> For some owners, money is no object,
|
|
> and standardization is far more important
|
|
> than any potential construction savings.
|
|
>
|
|
> These owners can be expected to decline every [[value-engineering]] option offered
|
|
> (see [[gold-plating]]).
|
|
|
|
### For the Contractor
|
|
|
|
* Make profit to meet growth target
|
|
* Secure work for current and projected employees (fill backlog)
|
|
|
|
%% TODO: "Determine the sale price of a service" %%
|
|
|
|
> [!aside]
|
|
> I take increasing issue with the common model
|
|
> of measuring operational success by negative overrun,
|
|
> as it is incompatible with the preferable target of estimate certainty.
|
|
|
|
#### The Role of the Estimator
|
|
|
|
The role of the estimator is to model the potential cost distribution of the project,
|
|
taking actions to reduce the model's uncertainty.
|
|
|
|
The effect of estimating methods can be represented as $d\sigma$,
|
|
thus efficiency is $\frac{d\sigma}{dt}$.
|
|
|
|
#### The Role of the Executive
|
|
|
|
The role of the executive is to allocate profit and contingency
|
|
according to the potential cost distribution
|
|
weighted by the organizational desire to win the project.
|
|
|
|
$$
|
|
{E}[P]=
|
|
$$
|