Files
zmVault/fixtures.md
T

542 B

id, aliases, tags
id aliases tags
systems/fixtures

Fixtures

Info

Sequence

1. Estimate preparation

  1. Read about the project specifications and construction type
  2. In drawings, locate:
    • Fixture Schedule
    • Reflected Ceiling Plans

2. Takeoff

See fixture-designations.

  1. Takeoff floor plans in order
  2. Takeoff enlarged drawings

3. Extension (Review and Checking)

  1. Garage Homeruns
  2. Luminaire in Amenity Areas
  3. Ensure appropriate breakdowns
    • Site lighting in System =="Site Misc. Fixtures"==