Files
zmVault/fixtures.md
T

33 lines
542 B
Markdown

---
id:
aliases: []
tags:
- systems/fixtures
---
# Fixtures
## Info
## Sequence
### 1. Estimate preparation
1. Read about the project specifications and construction type
2. In drawings, locate:
* Fixture Schedule
* Reflected Ceiling Plans
### 2. Takeoff
See [[fixture-designations]].
1. Takeoff floor plans in order
2. Takeoff enlarged drawings
### 3. Extension (Review and Checking)
1. Garage Homeruns
2. Luminaire in Amenity Areas
3. Ensure appropriate breakdowns
* Site lighting in System =="Site Misc. Fixtures"==