%% Implementation of conest-pre-takeoff-email-template %%
Hello Team,
Below is a comprehensive list of means & methods for Charlotte South End Hotel. Please confirm you have received this email and respond with any questions or comments.
- Delivery Method: Plans & Specs
- Document Stage: Issue for Permit
- Drawings Date: 2026-02-27
- Project Manual Date: 2026-02-27
- Proposal Date: 2025-12-12
- Takeoff Request Stage: Full Takeoff
Project Specification Callouts
-
Conduit: %% GRC, coupling specs, etc. %%
-
Wire:
- Material: Aluminum 100A and larger ---E021 "ALUMINUM FEEDER SCHEDULE" Note 1(b)
- Acceptable Manufacturers: ---Spec 260510-2 (p. 2224)
- Encore Wire
- General Cable
- Okonite
- Paranite
- Pirelli
- Senator
- Southwire
-
MC Cable:
- Application: Concealed feeders and branch circuits ---Spec XXXXXX (p. XXXX) %% Branch homeruns only; Not permitted %%
- Acceptable Manufacturers: ---Spec 260510-2 (p. 2224)
- Alflex
- AFC
- America Metal Moulding
- Encore Wire
- Southwire
- ==Conductors: Copper ---Spec XXXXXX (p. XXXX)==
- ==Armor: Steel ---Spec XXXXXX (p. XXXX)==
- ==Jacket: PVC ---Spec XXXXXX (p. XXXX)==
-
Steel Box Depth:
- Telecom: 2-1/8" ---Spec XXXXXX (p. XXXX)
- Security: 2-1/8" ---Spec XXXXXX (p. XXXX)
- Other Applications: Not specified %% 1-1/2", 2-1/8" %%
-
Floor Boxes: Sheet metal with brass or aluminum covers ---Spec XXXXXX (p. XXXX)
-
Wiring Devices:
- Units:
- Current rating: Unspecified. Assuming 15A for takeoff.
- Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff. %% 15A Decora %%
- BOH/Common Areas:
- Current rating: Unspecified. Assuming 20A for takeoff.
- Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff. %% 20A Toggle/Duplex %%
- Units:
-
Switchboards:
- Acceptable Manufacturers: ---Spec XXXXXX (p. XXXX)
- ???
- Bus Material: ??? ---Spec XXXXXX (p. XXXX)
- Interrupting Current Rating: ???
- Acceptable Manufacturers: ---Spec XXXXXX (p. XXXX)
-
Distribution Panelboards:
- Acceptable Manufacturers: ---Spec XXXXXX (p. XXXX)
- ???
- Bus Material: ??? ---Spec XXXXXX (p. XXXX)
- Breaker Types: ??? ---Spec XXXXXX (p. XXXX) %% Snap-on, bolt on %%
- Interrupting Current Rating: ???
- Acceptable Manufacturers: ---Spec XXXXXX (p. XXXX)
-
Load Centers:
- Acceptable Manufacturers: ---Spec XXXXXX (p. XXXX)
- ???
- Bus Material: ??? ---Spec XXXXXX (p. XXXX)
- Breaker Types: ??? ---Spec XXXXXX (p. XXXX) %% Snap-on, bolt on %%
- Interrupting Current Rating: ???
- Acceptable Manufacturers: ---Spec XXXXXX (p. XXXX)
-
Transformers:
- Winding Material: ??? ---Spec XXXXXX (p. XXXX)
- K-Rating: ??? %% Windings AL or CU, K-rating %%
-
Generator: (1) 500kW Diesel
- Enclosure Specs: ??? ---Dwg. E014
- Remote Tank: ???
- Tank Size: ??? ---Spec XXXXXX (p. XXXX)
- Load Banks: ??? ---Spec XXXXXX (p. XXXX)
- Acceptable Manufacturers: ---Spec 263213-3 (p. 2323)
- Caterpillar Tractor Co.
- Cummins/Power Generation
- Kohler Power Systems (MTU Engine Only)
- MTU On-Site Energy
Project Drawing/Detail Callouts
-
Describe conflicts between drawings / proposal: %% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
-
Cost drivers in details not shown elsewhere on plans:
PDI System Execution Plan
-
Primaries: %% Installation only, (9) 6" PVC %%
-
Secondaries: * %% PVC UG, GRC Stub-ups, AL %%
-
Feeders: PVC UG, EMT OH; Size and material per E05-10 schedule ==(Transformer primaries and secondaries all copper)== %% PVC UG, EMT OH, AL over 100A, 2% VD %% %% Emergency Feeds MI Cable %%
-
Unit Subfeeds: ??? %% MC OH AL, VD per Chart on E5.01 %%
-
Units:
- ??? %% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
-
Telecom:
- ??? %% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
-
EV Chargers: ??? %% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
-
Fire Alarm: ??? %% Free-air where allowed by code. EMT Risers. %%
-
DAS: ??? %% Conduit only, Per PDI DAS Design %%
-
Low Voltage: Free-air where allowed by code. %% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
Lighting Control
-
Basis of Takeoff: ??? ---??? %% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
-
Area: ---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE" * %% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
Tasks/Quotes Needed for WBS
%% Delete any completed %%
- Electrical Constructability Review
- Electrical VDC
- Coordination Study
- DAS Public Safety Raceway Design
Thank you,