@@ -23,9 +23,15 @@ Policy Number: ATH1143034
Flood Insurance:
Insurer: [National General](https://eservice.nationalgeneral.com/)
Policy Number: 0003457855]
Policy Number: 0003457855
## Contractors
## Resources
### Websites
[South Florida Plant Guide](https://www.south-florida-plant-guide.com/)
### Contractors
* **HVAC:** Agape Air (semiannual service)
* **Plumbing:** Hafke Plumbing
+190
View File
@@ -0,0 +1,190 @@
---
id: 2026-03-09T15:50:49-04:00
aliases: []
title: 2026-03-09 15:50:49
tags:
- authorship/original
- destiny/permanent
- status/draft
- type/timestamped
daily: "[[2026-03-09]]"
date-created: 2026-03-09T15:50:49-04:00
dg-publish: true
monthly: "[[2026-03]]"
quarterly: "[[2026-Q1]]"
weekly: "[[2026-W11]]"
yearly: "[[2026]]"
---
# 2026-03-09 15:50:49
%% Implementation of [[conest-pre-takeoff-email-template]] %%
Hello Team,
Below is a comprehensive list of means & methods for Charlotte South End Hotel.
Please confirm you have received this email and respond with any questions or comments.
* **Delivery Method:** Plans & Specs
* **Document Stage:** Issue for Permit
* **Drawings Date:** 2026-02-27
* **Project Manual Date:** 2026-02-27
* **Proposal Date:** 2025-12-12
* **Takeoff Request Stage:** Full Takeoff
### Project Specification Callouts
* **Conduit:**
%% GRC, coupling specs, etc. %%
* **Wire:**
* Material: Aluminum 100A and larger _---E021 "ALUMINUM FEEDER SCHEDULE" Note 1(b)_
* Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_
* Encore Wire
* General Cable
* Okonite
* Paranite
* Pirelli
* Senator
* Southwire
* **MC Cable:**
* Application: Concealed feeders and branch circuits _---Spec XXXXXX (p. XXXX)_
%% Branch homeruns only; Not permitted %%
* Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_
* Alflex
* AFC
* America Metal Moulding
* Encore Wire
* Southwire
* ==Conductors: Copper _---Spec XXXXXX (p. XXXX)_==
* ==Armor: Steel _---Spec XXXXXX (p. XXXX)_==
* ==Jacket: PVC _---Spec XXXXXX (p. XXXX)_==
* **Steel Box Depth:**
* Telecom: 2-1/8" _---Spec XXXXXX (p. XXXX)_
* Security: 2-1/8" _---Spec XXXXXX (p. XXXX)_
* Other Applications: Not specified
%% 1-1/2", 2-1/8" %%
* **Floor Boxes:** Sheet metal with brass or aluminum covers _---Spec XXXXXX (p. XXXX)_
* **Wiring Devices:**
* Units:
* Current rating: Unspecified. Assuming 15A for takeoff.
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
%% 15A Decora %%
* BOH/Common Areas:
* Current rating: Unspecified. Assuming 20A for takeoff.
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
%% 20A Toggle/Duplex %%
* **Switchboards:**
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
* ???
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
* Interrupting Current Rating: ???
* **Distribution Panelboards:**
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
* ???
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
* Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_
%% Snap-on, bolt on %%
* Interrupting Current Rating: ???
* **Load Centers:**
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
* ???
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
* Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_
%% Snap-on, bolt on %%
* Interrupting Current Rating: ???
* **Transformers:**
* Winding Material: ??? _---Spec XXXXXX (p. XXXX)_
* K-Rating: ???
%% Windings AL or CU, K-rating %%
* **Generator:** (1) 500kW Diesel
* Enclosure Specs: ??? _---Dwg. E014_
* Remote Tank: ???
* Tank Size: ??? _---Spec XXXXXX (p. XXXX)_
* Load Banks: ??? _---Spec XXXXXX (p. XXXX)_
* Acceptable Manufacturers: _---Spec 263213-3 (p. 2323)_
* Caterpillar Tractor Co.
* Cummins/Power Generation
* Kohler Power Systems (MTU Engine Only)
* MTU On-Site Energy
### Project Drawing/Detail Callouts
* Describe conflicts between drawings / proposal:
%% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
* Cost drivers in details not shown elsewhere on plans:
### PDI System Execution Plan
* **Primaries:**
%% Installation only, (9) 6" PVC %%
* **Secondaries:**
*
%% PVC UG, GRC Stub-ups, AL %%
* **Feeders:**
PVC UG, EMT OH;
Size and material per E05-10 schedule
==(Transformer primaries and secondaries all copper)==
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
%% Emergency Feeds MI Cable %%
* **Unit Subfeeds:** ???
%% MC OH AL, VD per Chart on E5.01 %%
* **Units:**
* ???
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
* **Telecom:**
* ???
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
* **EV Chargers:** ???
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
* **Fire Alarm:** ???
%% Free-air where allowed by code. EMT Risers. %%
* **DAS:** ???
%% Conduit only, Per PDI DAS Design %%
* **Low Voltage:** Free-air where allowed by code.
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
### Lighting Control
* **Basis of Takeoff:** ??? _---???_
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
* **Area:** _---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"_
*
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
### Tasks/Quotes Needed for WBS
%% Delete any completed %%
* Electrical Constructability Review
* Electrical VDC
* Coordination Study
* DAS Public Safety Raceway Design
<!--
DAS Public Safety Raceway Design is necessary
if we own DAS pathways but not the system,
since if we own the system,
the raceway design will be included in the Systems quote.
-->