title: "PDI Accubid Closeout: Subcontractors"
|
|
tags:
|
|
- occupational/closeout
|
|
- type/guide
|
|
up: "[[pdi-accubid-closeout]]"
|
|
---
|
|
# PDI Accubid Closeout: Subcontractors
|
|
|
|
> [!important]
|
|
> Subcontractor quotes ==must include tax==.
|
|
|
|
Clear **Markup %** for all lines.
|
|
|
|
## Quotes
|
|
|
|
Include all quotes from BPM.
|
|
If system is not included in the base bid,
|
|
set **Adjustment %** to -100%
|
|
|
|
### `TWO WAY COMMUNICATION`
|
|
|
|
* **Vendor** <- "PDI SYSTEMS"
|
|
* **Quote** <- Per PDI Systems proposal
|
|
* **Notes** <- Quote date
|
|
|
|
### `FIRE ALARM`
|
|
|
|
* **Vendor** <- "PDI SYSTEMS"
|
|
* **Quote** <- Per PDI Systems proposal
|
|
* **Notes** <- Quote date; # hours in quote
|
|
|
|
## Budgets
|
|
|
|
### `PDI ENGINEERING COORDINATION STUDIES`
|
|
|
|
Only if not included in switchgear quote.
|
|
|
|
### `EXCAVATION`
|
|
|
|
Only if we own primary conduit or Site Low Voltage Duct Bank:
|
|
|
|
* **Vendor** <- "PDI BUDGET"
|
|
* **Quote** <- $10,000
|
|
|
|
### `WIREWAYS | TROUGHS | PULL BOXES`
|
|
|
|
* **Vendor** <- "PDI BUDGET"
|
|
* **Quote** <- $10,000 per building (subject to adjustment)
|
|
|
|
### `FIRE STOP`
|
|
|
|
* **Vendor** <- "PDI BUDGET"
|
|
* **Quote** <- $25 per Unit (subject to adjustment)
|
|
|
|
### `RIGGING`
|
|
|
|
* **Vendor** <- "PDI BUDGET"
|
|
* **Quote** <- Sum of costs per generator:
|
|
* _less than 800kW_ = $5k each
|
|
* _800kW and larger_ = $10k each
|
|
|
|
### `FUEL`
|
|
|
|
* **Vendor** <- "PDI BUDGET"
|
|
* **Quote** <- ...
|
|
* _High Density:_ $5k
|
|
* _High Rise:_ $10k
|