Hello Team,
Below is a comprehensive list of means & methods for {Project Name}. Please confirm you have received this email and respond with any questions or comments.
- Takeoff Request Stage:
- Delivery Method:
- Document Stage:
- Drawings Date:
- Project Manual Date:
- Proposal Date:
Project Specification Callouts
- Conduit Execution Plans:
- Wire:
- {MC} Cable Application:
- Steel Box Depth:
- Floor Boxes:
- Box Material:
- Cover Material:
- Wiring Devices:
- Units:
- BOH/Common Areas:
- Switchboards/Panelboards:
- Transformers:
- Generator:
- Acceptable manufacturers:
- Enclosure Specs:
- Sound Rating:
- Remote Tank:
- Tank Size:
- Load Banks:
Project Drawing/Detail Callouts
-
Describe conflicts between drawings / proposal:
-
Cost drivers in details not shown elsewhere on plans:
PDI System Execution Plan
- Primaries:
- Secondaries:
- Feeders:
- Unit Subfeeds:
- Units:
- Telecom:
- EV Chargers:
- Fire Alarm: Devices PVC in-slab, Risers EMT.
- DAS:
- Low Voltage:
Lighting Control
-
Scope:
-
Area:
- BOH:
- Corridor:
- Amenity:
- Site/Landscape:
- Garage Entry Point
- Office:
Tasks/Quotes Needed for WBS
-
Constructability Review, etc.
-
DAS Raceway Design
Thank you,