Hello Team,

Below is a comprehensive list of means & methods for {Project Name}. Please confirm you have received this email and respond with any questions or comments.

  • Takeoff Request Stage:
  • Delivery Method:
  • Document Stage:
  • Drawings Date:
  • Project Manual Date:
  • Proposal Date:

Project Specification Callouts

  • Conduit Execution Plans:
  • Wire:
  • {MC} Cable Application:
  • Steel Box Depth:
  • Floor Boxes:
    • Box Material:
    • Cover Material:
  • Wiring Devices:
    • Units:
    • BOH/Common Areas:
  • Switchboards/Panelboards:
  • Transformers:
  • Generator:
    • Acceptable manufacturers:
    • Enclosure Specs:
    • Sound Rating:
    • Remote Tank:
    • Tank Size:
    • Load Banks:

Project Drawing/Detail Callouts

  • Describe conflicts between drawings / proposal:

  • Cost drivers in details not shown elsewhere on plans:

PDI System Execution Plan

  • Primaries:
  • Secondaries:
  • Feeders:
  • Unit Subfeeds:
  • Units:
  • Telecom:
  • EV Chargers:
  • Fire Alarm: Devices PVC in-slab, Risers EMT.
  • DAS:
  • Low Voltage:

Lighting Control

  • Scope:

  • Area:

    • BOH:
    • Corridor:
    • Amenity:
    • Site/Landscape:
    • Garage Entry Point
    • Office:

Tasks/Quotes Needed for WBS

  • Constructability Review, etc.

  • DAS Raceway Design

Thank you,