# 2026-02-11 12:12:16
|
|
|
|
Hello Team,
|
|
|
|
Below is a comprehensive list of means & methods for {Project Name}.
|
|
Please confirm you have received this email and respond with any questions or comments.
|
|
|
|
- Takeoff Request Stage:
|
|
<!-- Stage 1, Stage 1 + Units, Full takeoff -->
|
|
- Delivery Method:
|
|
<!-- Plans & Specs, Design Build, Design Assist, P&S with Approved VE -->
|
|
- Document Stage:
|
|
<!-- DD, CD, Permit, GMP, Bid, Awarded -->
|
|
- Drawings Date: <!-- Date -->
|
|
- Project Manual Date: <!-- Date -->
|
|
- Proposal Date: <!-- Date -->
|
|
|
|
### Project Specification Callouts
|
|
|
|
<!-- Put page of Drawing or PM after answer -->
|
|
|
|
- Conduit Execution Plans:
|
|
<!-- GRC, coupling specs, etc. -->
|
|
- Wire:
|
|
<!-- Copper or Aluminum, Acceptable Manufacturers -->
|
|
- {MC} Cable Application:
|
|
<!-- Branch homeruns only; Not permitted -->
|
|
- Steel Box Depth:
|
|
<!-- 1-1/2", 2-1/8" -->
|
|
- Floor Boxes:
|
|
- Box Material:
|
|
<!-- Box: PVC, Sheet metal, Cast iron -->
|
|
* Cover Material:
|
|
<!-- Covers: Brass, Aluminum -->
|
|
- Wiring Devices:
|
|
- Units:
|
|
<!-- 15A Decora -->
|
|
- BOH/Common Areas:
|
|
<!-- 20A Toggle/Duplex -->
|
|
- Switchboards/Panelboards:
|
|
<!-- Acceptable Manufacturers, AL or CU Bussing, Breaker Types (Snap-on, bolt on), ACI Ratings -->
|
|
- Transformers:
|
|
<!-- Windings AL or CU, K-rating -->
|
|
- Generator:
|
|
* Acceptable manufacturers:
|
|
* Enclosure Specs:
|
|
* Sound Rating:
|
|
* Remote Tank:
|
|
* Tank Size:
|
|
* Load Banks:
|
|
|
|
### Project Drawing/Detail Callouts
|
|
|
|
- Describe conflicts between drawings / proposal:
|
|
<!-- Plans show CU feeders, proposal calls for aluminum; Specification grade devices, etc. -->
|
|
|
|
- Cost drivers in details not shown elsewhere on plans:
|
|
- <!-- Assuming this refers to lighting control -->
|
|
|
|
### PDI System Execution Plan
|
|
|
|
- Primaries:
|
|
<!-- Installation only, (9) 6" PVC -->
|
|
- Secondaries:
|
|
<!-- PVC UG, GRC Stub-ups, AL -->
|
|
- Feeders:
|
|
<!-- PVC UG, EMT OH, AL over 100A, 2% VD -->
|
|
- Unit Subfeeds:
|
|
<!-- MC OH AL, VD per Chart on E5.01 -->
|
|
- Units:
|
|
<!-- 15A Decora, Insinkerators, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. -->
|
|
- Telecom:
|
|
<!-- 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups -->
|
|
- EV Chargers:
|
|
<!-- (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment -->
|
|
- Fire Alarm: Devices PVC in-slab, Risers EMT.
|
|
<!-- Free-air where allowed by code. EMT Risers. -->
|
|
- DAS:
|
|
<!-- Conduit only, Per PDI DAS Design -->
|
|
- Low Voltage:
|
|
<!-- Free-air where allowed by code. Stub-ups to accessible ceilings. -->
|
|
|
|
### Lighting Control
|
|
|
|
- Scope:
|
|
<!-- Code Minimum per Energy Code Assigned, P&S, PDI Design -->
|
|
|
|
- Area: <!-- Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System -->
|
|
- BOH:
|
|
- Corridor:
|
|
- Amenity:
|
|
- Site/Landscape:
|
|
- Garage Entry Point
|
|
- Office:
|
|
|
|
### Tasks/Quotes Needed for WBS
|
|
|
|
- Constructability Review, etc.
|
|
|
|
- DAS Raceway Design
|
|
|
|
Thank you,
|