# 2026-03-09 15:50:49
|
||
|
||
%% Implementation of [[conest-pre-takeoff-email-template]] %%
|
||
|
||
Hello Team,
|
||
|
||
Below is a comprehensive list of means & methods for Charlotte South End Hotel.
|
||
Please confirm you have received this email and respond with any questions or comments.
|
||
|
||
* **Delivery Method:** Plans & Specs
|
||
* **Document Stage:** Issue for Permit
|
||
* **Drawings Date:** 2026-02-27
|
||
* **Project Manual Date:** 2026-02-27
|
||
* **Proposal Date:** 2025-12-12
|
||
* **Takeoff Request Stage:** Full Takeoff
|
||
|
||
### Project Specification Callouts
|
||
|
||
* **Conduit:**
|
||
%% GRC, coupling specs, etc. %%
|
||
|
||
* **Wire:**
|
||
* Material: Aluminum 100A and larger _---E021 "ALUMINUM FEEDER SCHEDULE" Note 1(b)_
|
||
* Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_
|
||
* Encore Wire
|
||
* General Cable
|
||
* Okonite
|
||
* Paranite
|
||
* Pirelli
|
||
* Senator
|
||
* Southwire
|
||
|
||
* **MC Cable:**
|
||
* Application: Concealed feeders and branch circuits _---Spec XXXXXX (p. XXXX)_
|
||
%% Branch homeruns only; Not permitted %%
|
||
* Acceptable Manufacturers: _---Spec 260510-2 (p. 2224)_
|
||
* Alflex
|
||
* AFC
|
||
* America Metal Moulding
|
||
* Encore Wire
|
||
* Southwire
|
||
* ==Conductors: Copper _---Spec XXXXXX (p. XXXX)_==
|
||
* ==Armor: Steel _---Spec XXXXXX (p. XXXX)_==
|
||
* ==Jacket: PVC _---Spec XXXXXX (p. XXXX)_==
|
||
|
||
* **Steel Box Depth:**
|
||
* Telecom: 2-1/8" _---Spec XXXXXX (p. XXXX)_
|
||
* Security: 2-1/8" _---Spec XXXXXX (p. XXXX)_
|
||
* Other Applications: Not specified
|
||
%% 1-1/2", 2-1/8" %%
|
||
|
||
* **Floor Boxes:** Sheet metal with brass or aluminum covers _---Spec XXXXXX (p. XXXX)_
|
||
|
||
* **Wiring Devices:**
|
||
* Units:
|
||
* Current rating: Unspecified. Assuming 15A for takeoff.
|
||
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
|
||
%% 15A Decora %%
|
||
* BOH/Common Areas:
|
||
* Current rating: Unspecified. Assuming 20A for takeoff.
|
||
* Standard/Decora: Unspecified. Assuming Toggle/Duplex for takeoff.
|
||
%% 20A Toggle/Duplex %%
|
||
|
||
* **Switchboards:**
|
||
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
|
||
* ???
|
||
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||
* Interrupting Current Rating: ???
|
||
|
||
* **Distribution Panelboards:**
|
||
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
|
||
* ???
|
||
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||
* Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_
|
||
%% Snap-on, bolt on %%
|
||
* Interrupting Current Rating: ???
|
||
|
||
* **Load Centers:**
|
||
* Acceptable Manufacturers: _---Spec XXXXXX (p. XXXX)_
|
||
* ???
|
||
* Bus Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||
* Breaker Types: ??? _---Spec XXXXXX (p. XXXX)_
|
||
%% Snap-on, bolt on %%
|
||
* Interrupting Current Rating: ???
|
||
|
||
* **Transformers:**
|
||
* Winding Material: ??? _---Spec XXXXXX (p. XXXX)_
|
||
* K-Rating: ???
|
||
%% Windings AL or CU, K-rating %%
|
||
|
||
* **Generator:** (1) 500kW Diesel
|
||
* Enclosure Specs: ??? _---Dwg. E014_
|
||
* Remote Tank: ???
|
||
* Tank Size: ??? _---Spec XXXXXX (p. XXXX)_
|
||
* Load Banks: ??? _---Spec XXXXXX (p. XXXX)_
|
||
* Acceptable Manufacturers: _---Spec 263213-3 (p. 2323)_
|
||
* Caterpillar Tractor Co.
|
||
* Cummins/Power Generation
|
||
* Kohler Power Systems (MTU Engine Only)
|
||
* MTU On-Site Energy
|
||
|
||
### Project Drawing/Detail Callouts
|
||
|
||
* Describe conflicts between drawings / proposal:
|
||
%% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
|
||
|
||
* Cost drivers in details not shown elsewhere on plans:
|
||
|
||
### PDI System Execution Plan
|
||
|
||
* **Primaries:**
|
||
%% Installation only, (9) 6" PVC %%
|
||
|
||
* **Secondaries:**
|
||
*
|
||
%% PVC UG, GRC Stub-ups, AL %%
|
||
|
||
* **Feeders:**
|
||
PVC UG, EMT OH;
|
||
Size and material per E05-10 schedule
|
||
==(Transformer primaries and secondaries all copper)==
|
||
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
||
%% Emergency Feeds MI Cable %%
|
||
|
||
* **Unit Subfeeds:** ???
|
||
%% MC OH AL, VD per Chart on E5.01 %%
|
||
|
||
* **Units:**
|
||
* ???
|
||
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
||
|
||
* **Telecom:**
|
||
* ???
|
||
%% 42" MSDE, No Cable Homeruns, (1) 1" Back to IDF, CAT6 with Stub-ups %%
|
||
|
||
* **EV Chargers:** ???
|
||
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
||
|
||
* **Fire Alarm:** ???
|
||
%% Free-air where allowed by code. EMT Risers. %%
|
||
|
||
* **DAS:** ???
|
||
%% Conduit only, Per PDI DAS Design %%
|
||
|
||
* **Low Voltage:** Free-air where allowed by code.
|
||
%% Free-air where allowed by code. Stub-ups to accessible ceilings. %%
|
||
|
||
### Lighting Control
|
||
|
||
* **Basis of Takeoff:** ??? _---???_
|
||
%% Code Minimum per Energy Code Assigned, P&S, PDI Design %%
|
||
|
||
* **Area:** _---Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"_
|
||
*
|
||
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
||
|
||
### Tasks/Quotes Needed for WBS
|
||
|
||
%% Delete any completed %%
|
||
|
||
* Electrical Constructability Review
|
||
* Electrical VDC
|
||
* Coordination Study
|
||
* DAS Public Safety Raceway Design
|
||
|
||
<!--
|
||
DAS Public Safety Raceway Design is necessary
|
||
if we own DAS pathways but not the system,
|
||
since if we own the system,
|
||
the raceway design will be included in the Systems quote.
|
||
-->
|
||
|
||
Thank you,
|