vault backup: 2026-02-19 17:20:00
This commit is contained in:
Vendored
+7
-64
@@ -1,79 +1,22 @@
|
||||
{
|
||||
"collapse-filter": false,
|
||||
"collapse-filter": true,
|
||||
"search": "path:/*.md",
|
||||
"showTags": false,
|
||||
"showAttachments": false,
|
||||
"hideUnresolved": true,
|
||||
"hideUnresolved": false,
|
||||
"showOrphans": true,
|
||||
"collapse-color-groups": false,
|
||||
"colorGroups": [
|
||||
{
|
||||
"query": "tag:#type/periodic/timestamped ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 14523974
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#type/periodic/daily ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 12266267
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#occupational ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 11392604
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#topic/estimating ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 6084302
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#topic/meta ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 11492566
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#type/media ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 10307734
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#topic/construction/electrical ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 13683594
|
||||
}
|
||||
},
|
||||
{
|
||||
"query": "tag:#topic/hobbies ",
|
||||
"color": {
|
||||
"a": 1,
|
||||
"rgb": 7060889
|
||||
}
|
||||
}
|
||||
],
|
||||
"colorGroups": [],
|
||||
"collapse-display": false,
|
||||
"showArrow": false,
|
||||
"showArrow": true,
|
||||
"textFadeMultiplier": 0,
|
||||
"nodeSizeMultiplier": 1,
|
||||
"lineSizeMultiplier": 1,
|
||||
"collapse-forces": false,
|
||||
"centerStrength": 0.5703125,
|
||||
"repelStrength": 13.3854166666667,
|
||||
"centerStrength": 0.518713248970312,
|
||||
"repelStrength": 10,
|
||||
"linkStrength": 1,
|
||||
"linkDistance": 250,
|
||||
"scale": 0.1316339551137012,
|
||||
"scale": 0.18454855383603447,
|
||||
"close": false
|
||||
}
|
||||
Vendored
+2
-1
@@ -1,4 +1,5 @@
|
||||
{
|
||||
"format": "YYYY-MM-DD_HH-mm-ss",
|
||||
"template": "templates/timestamped"
|
||||
"template": "templates/timestamped",
|
||||
"folder": "timestamped"
|
||||
}
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-06-13
|
||||
|
||||
## 2025-06-13 ??:??
|
||||
## 2025-06-13 ??:??:??
|
||||
|
||||
### Automating Estimating Project Creation
|
||||
|
||||
|
||||
+1
-1
@@ -13,7 +13,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-07-18
|
||||
|
||||
## 2025-07-18 ??:??
|
||||
## 2025-07-18 ??:??:??
|
||||
|
||||
### Estimating Isn't Engineering
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-08-22
|
||||
|
||||
## 2025-08-22 ??:??
|
||||
## 2025-08-22 ??:??:??
|
||||
|
||||
### Getting Historical Material Pricing
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-08-26
|
||||
|
||||
## 2025-08-26 ??:??
|
||||
## 2025-08-26 ??:??:??
|
||||
|
||||
### Pathfinding
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-10-20
|
||||
|
||||
## 2025-10-20 ??:??
|
||||
## 2025-10-20 ??:??:??
|
||||
|
||||
"Rogue AI" is a common trope,
|
||||
but the reality of hallucination
|
||||
|
||||
+1
-1
@@ -12,7 +12,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-10-26
|
||||
|
||||
## 2025-10-26 18:36 --- Sunday evening
|
||||
## 2025-10-26 18:36:?? --- Sunday evening
|
||||
|
||||
#topic/hobbies/reading
|
||||
|
||||
|
||||
+1
-1
@@ -12,7 +12,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-10-31
|
||||
|
||||
## 2025-10-31 18:26 --- Friday Evening
|
||||
## 2025-10-31 18:26:?? --- Friday Evening
|
||||
|
||||
#topic/hobbies/birding
|
||||
|
||||
|
||||
+1
-1
@@ -12,7 +12,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-01
|
||||
|
||||
## 2025-11-01 05:41 --- Saturday Morning
|
||||
## 2025-11-01 05:41:?? --- Saturday Morning
|
||||
|
||||
Somehow I've already let an hour get away from me.
|
||||
Today I need to do some cleaning: a load of laundry and leftover dishes
|
||||
|
||||
+16
-14
@@ -10,46 +10,48 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-04
|
||||
|
||||
## 2025-11-04 Belle Meade Director Review
|
||||
## 2025-11-04 14:52:05
|
||||
|
||||
#occupational #type/minutes
|
||||
|
||||
### Takeoff Review
|
||||
### Belle Meade Director Review
|
||||
|
||||
#### Takeoff Review
|
||||
|
||||
Reviewed takeoff by system.
|
||||
|
||||
#### Retail Village Temporary Power
|
||||
##### Retail Village Temporary Power
|
||||
|
||||
Joel changed square foot budgets to temporary pole budgets only
|
||||
due to minimal scope (warm shell).
|
||||
|
||||
#### Generator Scope
|
||||
##### Generator Scope
|
||||
|
||||
Confirmed generator quotes include furnishing docking station.
|
||||
|
||||
#### Feeder Lengths
|
||||
##### Feeder Lengths
|
||||
|
||||
Confirmed validity of longer feeder lengths:
|
||||
Generator to Tower B
|
||||
|
||||
#### Grounding
|
||||
##### Grounding
|
||||
|
||||
Takeoff appears to be missing some or all grounding.
|
||||
To be added if necessary.
|
||||
|
||||
#### Subfeed Sizing
|
||||
##### Subfeed Sizing
|
||||
|
||||
Based on ampacity, subfeeds are oversized.
|
||||
Sizing was per feeder schedule.
|
||||
Takeoff approved unchanged.
|
||||
|
||||
#### Undercabinet Wiremold
|
||||
##### Undercabinet Wiremold
|
||||
|
||||
Multi-outlet assemblies above unit kitchen countertops were not taken off,
|
||||
nor was branch wiring for the same.
|
||||
Joel to confirm takeoff requirement with bid.
|
||||
|
||||
#### Amenity Homeruns
|
||||
##### Amenity Homeruns
|
||||
|
||||
No homeruns for amenity lighting or electrical were taken off.
|
||||
Joel to add these.
|
||||
@@ -58,7 +60,7 @@ Joel to add these.
|
||||
> Corwin stated that---assuming no overriding specification---
|
||||
> up to 6 circuits in a raceway are permissible.
|
||||
|
||||
#### Lighting Control
|
||||
##### Lighting Control
|
||||
|
||||
Lighting control takeoff was reviewed,
|
||||
no changes were recommended.
|
||||
@@ -69,18 +71,18 @@ no changes were recommended.
|
||||
> noting quantities of lighting zones and controllers,
|
||||
> even where not explicitly shown.
|
||||
|
||||
#### Telecom
|
||||
##### Telecom
|
||||
|
||||
Confirmed unit telecom requirements.
|
||||
|
||||
Backbone was mistakenly taken off in Telecom.
|
||||
|
||||
#### Retail Fire Alarm
|
||||
##### Retail Fire Alarm
|
||||
|
||||
Retail village fire alarm devices were taken off free-air,
|
||||
Joel to substitute for EMT.
|
||||
|
||||
### Extension Review
|
||||
#### Extension Review
|
||||
|
||||
Reviewed extension quantities and costs.
|
||||
Of particular note were:
|
||||
@@ -90,7 +92,7 @@ Of particular note were:
|
||||
* cable
|
||||
* wiring devices
|
||||
|
||||
### Labor Plan Review
|
||||
#### Labor Plan Review
|
||||
|
||||
Hours per square foot was lower than expected,
|
||||
this was rationalized as being due
|
||||
|
||||
+3
-1
@@ -12,10 +12,12 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-06
|
||||
|
||||
## 2025-11-06 18:12 "Bad Bid Practice"
|
||||
## 2025-11-06 18:12:??
|
||||
|
||||
#topic/estimating #topic/transparency
|
||||
|
||||
### "Bad Bid Practice"
|
||||
|
||||
I might be reprimanded for the things I've said about deceptive bid practices
|
||||
were I to repeat them to the wrong person,
|
||||
but I can't, in good conscience, take them back.
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-10
|
||||
|
||||
## 2025-11-10 06:53 --- Monday Morning Before Work
|
||||
## 2025-11-10 06:53:?? --- Monday Morning Before Work
|
||||
|
||||
#original-format/typewritten-print #topic/mindfulness
|
||||
|
||||
|
||||
+4
-4
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-13
|
||||
|
||||
## 2025-11-13 08:03
|
||||
## 2025-11-13 08:03:??
|
||||
|
||||
#topic/hobbies/writing
|
||||
|
||||
@@ -24,7 +24,7 @@ but that to use the same constructions
|
||||
would require a level of forethought
|
||||
that I'm not capable of under the pressure of conversation.
|
||||
|
||||
## 2025-11-13 08:19
|
||||
## 2025-11-13 08:19:??
|
||||
|
||||
#topic/estimating #occupational
|
||||
|
||||
@@ -43,7 +43,7 @@ where instrumental methods are presented as if they were realist,
|
||||
causing confusion when the methods are,
|
||||
as judged from a realist perspective, wrong.
|
||||
|
||||
## 2025-11-13 ??:??
|
||||
## 2025-11-13 ??:??:??
|
||||
|
||||
#occupational
|
||||
|
||||
@@ -62,7 +62,7 @@ before they receive our proposal?
|
||||
|
||||
Is it clear they understand what we're excluding?
|
||||
|
||||
## 2025-11-13 20:41
|
||||
## 2025-11-13 20:41:??
|
||||
|
||||
#topic/hobbies/shorthand
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-14
|
||||
|
||||
## 2025-11-14 13:41
|
||||
## 2025-11-14 13:41:??
|
||||
|
||||
#topic/meta #topic/hobbies/music/banjo #topic/hobbies/shorthand
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-16
|
||||
|
||||
## 2025-11-16 08:09
|
||||
## 2025-11-16 08:09:??
|
||||
|
||||
#topic/hobbies/shorthand #topic/hobbies/writing
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-18
|
||||
|
||||
## 2025-11-18 16:33
|
||||
## 2025-11-18 16:33:??
|
||||
|
||||
### Elliot St. ConEst Senior Review
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-20
|
||||
|
||||
## 2025-11-20 08:46
|
||||
## 2025-11-20 08:46:??
|
||||
|
||||
### Elliot St. WBS Prep
|
||||
|
||||
|
||||
@@ -1,12 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2025-11-21
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
---
|
||||
# 2025-11-21
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-11-24
|
||||
|
||||
## 2025-11-24 ??:??
|
||||
## 2025-11-24 ??:??:??
|
||||
|
||||
# Extracting PDF Panel Schedules
|
||||
|
||||
|
||||
+4
-4
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-02
|
||||
|
||||
## 2025-12-02 10:40
|
||||
## 2025-12-02 10:40:??
|
||||
|
||||
#topic/construction/electrical
|
||||
|
||||
@@ -26,7 +26,7 @@ dg-publish: true
|
||||
|
||||
![[alternating-current#Ferroelectric Hysteresis]]
|
||||
|
||||
## 2025-12-02 10:57
|
||||
## 2025-12-02 10:57:??
|
||||
|
||||
### Set Notation Example
|
||||
|
||||
@@ -47,7 +47,7 @@ sharing some but not all elements.
|
||||
($B$ has at least one element not in $A$).
|
||||
Equivalent to $B \setminus A \neq \varnothing$.
|
||||
|
||||
## 2025-12-02 13:20
|
||||
## 2025-12-02 13:20:??
|
||||
|
||||
### Panel Schedule Relationship Diagram
|
||||
|
||||
@@ -62,7 +62,7 @@ may or may not have multiple schedules.
|
||||
Schedules may be typical of multiple panelboards
|
||||
`PANEL H(2-6)`
|
||||
|
||||
## 2025-12-02 15:35
|
||||
## 2025-12-02 15:35:??
|
||||
|
||||
### Bluebeam Model Context Protocol Tools
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-03
|
||||
|
||||
## 2025-12-03 15:54
|
||||
## 2025-12-03 15:54:22
|
||||
|
||||
### Excluding Vs. Ignoring Project Requirements
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-04
|
||||
|
||||
## 2025-12-04 09:51
|
||||
## 2025-12-04 09:51:17
|
||||
|
||||
#topic/automation
|
||||
|
||||
|
||||
+2
-2
@@ -11,11 +11,11 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-09
|
||||
|
||||
## 2025-12-09 10:43
|
||||
## 2025-12-09 10:43:36
|
||||
|
||||
[[ambiguity]]
|
||||
|
||||
## 2025-12-09 10:52
|
||||
## 2025-12-09 10:52:??
|
||||
|
||||
In residential construction area classification,
|
||||
what is the relationship between these two dichotomies?
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-10
|
||||
|
||||
## 2025-12-10 10:45 --- ConEst Lighting Controls Meeting Notes
|
||||
## 2025-12-10 10:45:19 --- ConEst Lighting Controls Meeting Notes
|
||||
|
||||
#occupational/takeoff #topic/ambiguity #topic/transparency
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-12
|
||||
|
||||
## 2025-12-12 09:38
|
||||
## 2025-12-12 09:38:52
|
||||
|
||||
A humorous exchange between a peer in estimating and myself:
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-13
|
||||
|
||||
## 2025-12-13 08:45
|
||||
## 2025-12-13 08:45:??
|
||||
|
||||
I am interested in [[actuarial-science]] and [[risk-management]]
|
||||
for their ability to quantify what is generally viewed subjective,
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-14
|
||||
|
||||
## 2025-12-14 09:52
|
||||
## 2025-12-14 09:52:??
|
||||
|
||||
```
|
||||
# hard wrap text
|
||||
|
||||
+2
-2
@@ -11,13 +11,13 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-16
|
||||
|
||||
## 2025-12-16 09:20
|
||||
## 2025-12-16 09:20:52
|
||||
|
||||
[Probability Management](https://www.probabilitymanagement.org/)
|
||||
|
||||
[Handbook of Decision Analysis | Wiley Online Books](https://onlinelibrary.wiley.com/doi/book/10.1002/9781118515853)
|
||||
|
||||
## 2025-12-16 20:04
|
||||
## 2025-12-16 20:04:??
|
||||
|
||||
### Metalog Distributions
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-17
|
||||
|
||||
## 2025-12-17 05:39
|
||||
## 2025-12-17 05:39:??
|
||||
|
||||
One aspect of estimating that I find most interesting,
|
||||
but that is criminally understudied,
|
||||
|
||||
+5
-5
@@ -11,11 +11,11 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-18
|
||||
|
||||
## 2025-12-18 08:32
|
||||
## 2025-12-18 08:32:18
|
||||
|
||||
[[uncertainty-in-construction-estimating]]
|
||||
|
||||
## 2025-12-18 10:38
|
||||
## 2025-12-18 10:38:??
|
||||
|
||||
#topic/meta
|
||||
|
||||
@@ -27,7 +27,7 @@ is superior.
|
||||
The unfortunate reality is I'll never look at most of them again,
|
||||
so better that they don't crowd out my main notes.
|
||||
|
||||
## 2025-12-18 14:18
|
||||
## 2025-12-18 14:18:??
|
||||
|
||||
### Estimating Golf
|
||||
|
||||
@@ -54,14 +54,14 @@ or must be questioned like project details.
|
||||
The most interesting part of this problem is choosing when to stop,
|
||||
since it requires one to estimate their certainty of their estimate.
|
||||
|
||||
## 2025-12-18 15:22
|
||||
## 2025-12-18 15:22:??
|
||||
|
||||
PDI has moved up the schedule to transition to Accubid Anywhere
|
||||
and will be signing a contract with Trimble in late January.
|
||||
|
||||
[Drawer AI | Automated Electrical Takeoff & Estimating](https://drawer.ai/)
|
||||
|
||||
## 2025-12-18 15:30
|
||||
## 2025-12-18 15:30:??
|
||||
|
||||
[Kip (unit) - Wikipedia](https://en.wikipedia.org/wiki/Kip_\(unit\))
|
||||
[Construction Cost Estimating](https://www.quantity-takeoff.com/index.htm)
|
||||
|
||||
+3
-3
@@ -11,11 +11,11 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-19
|
||||
|
||||
## 2025-12-19 06:22
|
||||
## 2025-12-19 06:22:??
|
||||
|
||||
[[music-theory-as-code]]
|
||||
|
||||
## 2025-12-19 10:44
|
||||
## 2025-12-19 10:44:??
|
||||
|
||||
#occupational/takeoff
|
||||
|
||||
@@ -24,7 +24,7 @@ dg-publish: true
|
||||
> (e.g mineral wool, spray foam) is to be applied,
|
||||
> add extension rings to compensate for the thickness
|
||||
|
||||
## 2025-12-19 10:44
|
||||
## 2025-12-19 10:44:??
|
||||
|
||||
#occupational/takeoff
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-20
|
||||
|
||||
## 2025-12-20 19:28
|
||||
## 2025-12-20 19:28:??
|
||||
|
||||
**Typesetting** is arranging type on the page for print.
|
||||
**Imposition** is arranging pages for binding.
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2025-12-30
|
||||
|
||||
## 2025-12-30 10:08
|
||||
## 2025-12-30 10:08:30
|
||||
|
||||
```
|
||||
3.ApplyThisSequence([-1,0,1,2,3])
|
||||
|
||||
@@ -11,6 +11,4 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-01
|
||||
|
||||
## 2026-01-01 06:30
|
||||
|
||||
Made recipe: Granola
|
||||
|
||||
+2
-2
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-02
|
||||
|
||||
## 2026-01-02 10:10
|
||||
## 2026-01-02 10:10:18
|
||||
|
||||
### Harborside Plaza 4
|
||||
|
||||
@@ -21,7 +21,7 @@ dg-publish: true
|
||||
* [x] [[telecom-takeoff#Backbone Riser|Telecom Backbone]]
|
||||
* [x] [[distributed-antenna-systems-takeoff|DAS]]
|
||||
|
||||
## 2026-01-02 19:21
|
||||
## 2026-01-02 19:21:??
|
||||
|
||||
Without apparent prompt I was reminded of a practical joke
|
||||
that my fellow apprentice Joe used to play often
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-04
|
||||
|
||||
## 2026-01-04 ??:??
|
||||
## 2026-01-04 ??:??:??
|
||||
|
||||
Horror is usually made more horrifying by the inclusion of one or more persons who do not find the situation horrifying.
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-05
|
||||
|
||||
## 2026-01-05 15:44
|
||||
## 2026-01-05 15:44:50
|
||||
|
||||
### Bluebeam Scripting
|
||||
|
||||
|
||||
+3
-3
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-06
|
||||
|
||||
## 2026-01-06 07:47
|
||||
## 2026-01-06 07:47:??
|
||||
|
||||
### _Let Them Theory_ Theory
|
||||
|
||||
@@ -24,7 +24,7 @@ dg-publish: true
|
||||
3. Person feels that they are doing a service
|
||||
by not engaging in said toxic behavior
|
||||
|
||||
## 2026-01-06 10:00
|
||||
## 2026-01-06 10:00:??
|
||||
|
||||
Paraphrased Teams conversation with a peer
|
||||
about [[distribution-designations#Terminations]].
|
||||
@@ -109,7 +109,7 @@ but I'd probably name them
|
||||
"... 1-Section, ~25% Fill"/"... 1-Section, ~75% Fill" instead.
|
||||
But that's a lot of mental overhead.
|
||||
|
||||
## 2026-01-06 10:57
|
||||
## 2026-01-06 10:57:??
|
||||
|
||||
Tracking contractor growth by project square footage
|
||||
rather than contract value dollars.
|
||||
|
||||
+6
-6
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-07
|
||||
|
||||
## 2026-01-07 06:41
|
||||
## 2026-01-07 06:41:??
|
||||
|
||||
> [!quote] _The Shadow of the Torturer_, Chapter 17: "The Challenge"
|
||||
> No intellect is needed to see those figures who wait beyond the void of death---
|
||||
@@ -30,12 +30,12 @@ dg-publish: true
|
||||
> One wakes within us and we are ridden like beasts,
|
||||
> though the rider is but some hitherto unguessed part of ourselves.
|
||||
|
||||
## 2026-01-07 10:03
|
||||
## 2026-01-07 10:03:??
|
||||
|
||||
At Ace, "residential" always meant single-family/duplex construction,
|
||||
but I think now we were the outliers.
|
||||
|
||||
## 2026-01-07 10:05
|
||||
## 2026-01-07 10:05:??
|
||||
|
||||
See [[pdi-breakdowns#Location]].
|
||||
|
||||
@@ -51,7 +51,7 @@ For lack of a better example,
|
||||
whether a "101 - KITCHEN", without provisions for cooking,
|
||||
would be broken down under "Kitchen".
|
||||
|
||||
## 2026-01-07 10:42
|
||||
## 2026-01-07 10:42:??
|
||||
|
||||
When I got to work today Art admonished a fellow estimator
|
||||
for not uploading _all_ of a project's drawings,
|
||||
@@ -92,7 +92,7 @@ doesn't seem to be at the front of every estimator's mind
|
||||
when doing takeoff or considering process changes,
|
||||
like it was for my mentors and peers at Ace.
|
||||
|
||||
## 2026-01-07 12:13
|
||||
## 2026-01-07 12:13:??
|
||||
|
||||
#occupational #topic/estimating #topic/organization
|
||||
|
||||
@@ -121,7 +121,7 @@ everywhere bare was necessary.
|
||||
|
||||
See [[realism-vs-instrumentalism]].
|
||||
|
||||
## 2026-01-07 16:03
|
||||
## 2026-01-07 16:03:??
|
||||
|
||||
#occupational #topic/estimating #topic/organization
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-08
|
||||
|
||||
## 2026-01-08 13:33
|
||||
## 2026-01-08 13:33:34
|
||||
|
||||
### 2100 Crystal Drive Takeoff Review
|
||||
|
||||
|
||||
+4
-4
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-09
|
||||
|
||||
## 2026-01-09 10:00
|
||||
## 2026-01-09 10:00:03
|
||||
|
||||
### 2100 Crystal Drive
|
||||
|
||||
@@ -57,7 +57,7 @@ $$
|
||||
|
||||
High Rise .110--.120 hr/sqft
|
||||
|
||||
## 2026-01-09 12:00
|
||||
## 2026-01-09 12:00:??
|
||||
|
||||
$$
|
||||
\begin{gather*}
|
||||
@@ -77,7 +77,7 @@ $$
|
||||
= 4.348125~\text{Weeks Per Month}
|
||||
$$
|
||||
|
||||
## 2026-01-09 14:45
|
||||
## 2026-01-09 14:45:??
|
||||
|
||||
[[bid-price-modeling]]
|
||||
|
||||
@@ -93,7 +93,7 @@ $t>0$ is time until the final payment.
|
||||
> Figure: lognormal distributions with the same [location](https://en.wikipedia.org/wiki/Location_parameter)
|
||||
> varied by [scale](https://en.wikipedia.org/wiki/Scale_parameter).
|
||||
|
||||
## 2026-01-09 16:28
|
||||
## 2026-01-09 16:28:??
|
||||
|
||||
### Occam's razor
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-10
|
||||
|
||||
## 2026-01-10 08:42
|
||||
## 2026-01-10 08:42:??
|
||||
|
||||
I've been writing a C# library based on the specifications of [[music-theory-as-code]],
|
||||
but the problem of parsing overwhelms me whenever I think about implementation.
|
||||
|
||||
+2
-2
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-11
|
||||
|
||||
## 2026-01-11 09:00
|
||||
## 2026-01-11 09:00:??
|
||||
|
||||
[[2026-01-09#2026-01-09 14:45]]
|
||||
|
||||
@@ -19,7 +19,7 @@ dg-publish: true
|
||||
|
||||
[[decrease-in-sigma]]
|
||||
|
||||
## 2026-01-11 11:00
|
||||
## 2026-01-11 11:00:??
|
||||
|
||||
![[favorite-quotes#"It Takes an Engineer to Build a Bridge that Barely Stands"]]
|
||||
|
||||
|
||||
+5
-5
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-12
|
||||
|
||||
## 2026-01-12 10:00
|
||||
## 2026-01-12 10:00:??
|
||||
|
||||
#occupational
|
||||
|
||||
@@ -21,7 +21,7 @@ For Executed Contract Revisions, Bid GP% must be maintained.
|
||||
In this case a negative variance was added to the buyout budget
|
||||
in order to compensate for an increase in permit fee coverage.
|
||||
|
||||
## 2026-01-12 10:42
|
||||
## 2026-01-12 10:42:30
|
||||
|
||||
#occupational
|
||||
|
||||
@@ -35,7 +35,7 @@ which includes only one receptacle.
|
||||
|
||||
According to Joel this takeoff is correct for the scenario.
|
||||
|
||||
## 2026-01-12 12:23
|
||||
## 2026-01-12 12:23:??
|
||||
|
||||
#occupational
|
||||
|
||||
@@ -96,14 +96,14 @@ between BPM, The Hub, and however many other places we can look.
|
||||
I doubt very seriously that mismanagement
|
||||
can be blamed for any significant portion of variance that extreme.
|
||||
|
||||
## 2026-01-12 13:02
|
||||
## 2026-01-12 13:02:??
|
||||
|
||||
#topic/construction
|
||||
|
||||
**Dry utilities:** utilities other than "wet" utilities (water, sewer, stormwater),
|
||||
namely power, data, and natural gas.
|
||||
|
||||
## 2026-01-12 13:02
|
||||
## 2026-01-12 13:02:??
|
||||
|
||||
#occupational
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-13
|
||||
|
||||
## 2026-01-13 11:28
|
||||
## 2026-01-13 11:28:14
|
||||
|
||||
#occupational
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-14
|
||||
|
||||
## 2026-01-14 13:27
|
||||
## 2026-01-14 13:27:20
|
||||
|
||||
#occupational
|
||||
|
||||
|
||||
+2
-2
@@ -11,13 +11,13 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-15
|
||||
|
||||
## 2026-01-15 08:11
|
||||
## 2026-01-15 08:11:10
|
||||
|
||||
Follow-up to [[2026-01-12#2026-01-12 12:23|2026-01-12 12:23]]
|
||||
|
||||
Left Apartment at 05:30, at terminal around 06:10.
|
||||
|
||||
## 2026-01-15 08:15
|
||||
## 2026-01-15 08:15:??
|
||||
|
||||
[[2025-11-13#2025-11-13 08:19]]
|
||||
I spoke to a peer about this yesterday.
|
||||
|
||||
+3
-3
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-19
|
||||
|
||||
## 2026-01-19 11:57
|
||||
## 2026-01-19 11:57:39
|
||||
|
||||
Follow-up to [[2026-01-10#2026-01-10 08:42]]
|
||||
|
||||
@@ -24,7 +24,7 @@ for the sort of formatting I've been doing recently.
|
||||
|
||||
[[2025-10-26#2025-10-26 18:36 --- Sunday evening]]
|
||||
|
||||
## 2026-01-19 12:32
|
||||
## 2026-01-19 12:32:??
|
||||
|
||||
#topic/construction #topic/estimating
|
||||
|
||||
@@ -36,7 +36,7 @@ Project is two buildings: Residential and Hotel,
|
||||
entirely separate physically and electrically.
|
||||
Generators for both are located on a lower roof of Residential.
|
||||
|
||||
## 2026-01-19 18:13
|
||||
## 2026-01-19 18:13:??
|
||||
|
||||
### Smart Home
|
||||
|
||||
|
||||
+3
-3
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-20
|
||||
|
||||
## 2026-01-20 09:09
|
||||
## 2026-01-20 09:09:12
|
||||
|
||||
Stumbled upon this line while waiting on my computer to restart.
|
||||
|
||||
@@ -20,7 +20,7 @@ Stumbled upon this line while waiting on my computer to restart.
|
||||
> we may go down the deep rabbit hole of adding more and more detail to a model
|
||||
> and trying to gather data on less relevant issues.
|
||||
|
||||
## 2026-01-20 10:10
|
||||
## 2026-01-20 10:10:??
|
||||
|
||||
I was reminded again of [[2025-12-04#2025-12-04 09:51]].
|
||||
I added a [[small-tasks|task]] for it.
|
||||
@@ -31,7 +31,7 @@ I'm now certain that common estimating calculators
|
||||
(e.g. voltage drop)
|
||||
could be easily replaced with documents like this one.
|
||||
|
||||
## 2026-01-20 14:25
|
||||
## 2026-01-20 14:25:??
|
||||
|
||||
Jfarrari The Unknowing (Acoustic)
|
||||
|
||||
|
||||
+3
-3
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-22
|
||||
|
||||
## 2026-01-22 09:55
|
||||
## 2026-01-22 09:55:42
|
||||
|
||||
#occupational
|
||||
|
||||
@@ -25,7 +25,7 @@ but could not have provided a code reference.
|
||||
[[nfpa-70_110_requirements#110.26(D) Illumination.|110.26(D)]]
|
||||
is the relevant section.
|
||||
|
||||
## 2026-01-22 11:58
|
||||
## 2026-01-22 11:58:??
|
||||
|
||||
#occupational
|
||||
|
||||
@@ -43,7 +43,7 @@ Effective date: [[2026-01-21]]
|
||||
|
||||
Closing: [[2026-03-04]]
|
||||
|
||||
## 2026-01-22 14:56
|
||||
## 2026-01-22 14:56:??
|
||||
|
||||
#topic/estimating
|
||||
|
||||
|
||||
+3
-3
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-23
|
||||
|
||||
## 2026-01-23 08:18
|
||||
## 2026-01-23 08:18:53
|
||||
|
||||
This morning I was thinking about the "slippery slope fallacy"
|
||||
and how it's a common instrument of an appeal to fallacy fallacy.
|
||||
@@ -26,7 +26,7 @@ As it turns out, the potential validity of slippery slope arguments is well stud
|
||||
Strictly speaking, a slippery slope argument is only fallacious
|
||||
if it is not _necessarily_ true that one event must follow another.
|
||||
|
||||
## 2026-01-23 12:34
|
||||
## 2026-01-23 12:34:??
|
||||
|
||||
Migrated several notes from Google's Keep
|
||||
|
||||
@@ -38,6 +38,6 @@ Migrated several notes from Google's Keep
|
||||
|
||||
[[pats-browning-a5]]
|
||||
|
||||
## 2026-01-23 12:56
|
||||
## 2026-01-23 12:56:??
|
||||
|
||||
Today the vault hit 50,000 words not including reference material.
|
||||
|
||||
+3
-3
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-25
|
||||
|
||||
## 2026-01-25 18:46
|
||||
## 2026-01-25 18:46:??
|
||||
|
||||
#topic/finance
|
||||
|
||||
@@ -64,7 +64,7 @@ $$
|
||||
\text{APR} = \frac{\frac{\text{Interest} + \text{Fees}}{\text{Principle}}}{\text{Term Years}}
|
||||
$$
|
||||
|
||||
## 2026-01-25 21:02
|
||||
## 2026-01-25 21:02:??
|
||||
|
||||
[[the-failure-of-risk-management]]
|
||||
|
||||
@@ -89,7 +89,7 @@ in which Hubbard warns against seeking detail for the sake of it.
|
||||
|
||||
See also [[the-failure-of-risk-management#_Exsupero Ursus_]].
|
||||
|
||||
## 2026-01-25 22:59
|
||||
## 2026-01-25 22:59:??
|
||||
|
||||
[[macgregor_1994_judgemental-decomposition]]
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-26
|
||||
|
||||
## 2026-01-26 06:48
|
||||
## 2026-01-26 06:48:??
|
||||
|
||||
### BLAME! Coelacanth
|
||||
|
||||
|
||||
+1
-1
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-27
|
||||
|
||||
## 2026-01-27 17:31
|
||||
## 2026-01-27 17:31:??
|
||||
|
||||
#topic/hobbies/reading
|
||||
|
||||
|
||||
+2
-2
@@ -11,7 +11,7 @@ dg-publish: true
|
||||
---
|
||||
# 2026-01-29
|
||||
|
||||
## 2026-01-29 10:07
|
||||
## 2026-01-29 10:07:37
|
||||
|
||||
#topic/estimating
|
||||
|
||||
@@ -32,7 +32,7 @@ Their dismissal of legitimate _instrumental_ complaints
|
||||
(misplaced effort, and deviation from more widely accepted standards)
|
||||
speaks to a fundamental misunderstanding of the purpose of estimating.
|
||||
|
||||
## 2026-01-29 17:57
|
||||
## 2026-01-29 17:57:??
|
||||
|
||||
#topic/finance
|
||||
|
||||
|
||||
@@ -1,12 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2026-01-31
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-01-31
|
||||
@@ -1,12 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2026-02-01
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-02-01
|
||||
@@ -1,12 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2026-02-02
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-02-02
|
||||
@@ -1,12 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2026-02-03
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-02-03
|
||||
@@ -1,12 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2026-02-04
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
---
|
||||
# 2026-02-04
|
||||
@@ -1,16 +0,0 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: 2026-02-05
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
weekly: "[[2026-W05]]"
|
||||
monthly: "[[2026-02]]"
|
||||
quarterly: "[[2026-Q1]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-02-05
|
||||
@@ -1,16 +0,0 @@
|
||||
---
|
||||
id: 2026-02-14
|
||||
aliases: []
|
||||
title: 2026-02-14
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/daily
|
||||
dg-publish: true
|
||||
weekly: "[[2026-W07]]"
|
||||
monthly: "[[2026-02]]"
|
||||
quarterly: "[[2026-Q1]]"
|
||||
yearly: "[[2026]]"
|
||||
---
|
||||
# 2026-02-14
|
||||
+57
-4
@@ -4,7 +4,7 @@ aliases: []
|
||||
title: PDI Accubid Closeout
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent/entry-point
|
||||
- destiny/permanent
|
||||
- occupational/closeout
|
||||
- status/draft
|
||||
- type/guide
|
||||
@@ -12,10 +12,63 @@ dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout
|
||||
|
||||
Also called "tabs",
|
||||
closeout is the stage of a construction estimate
|
||||
where
|
||||
Also called "tabs".
|
||||
|
||||
1. [[pdi-labor-plan]]
|
||||
2. [[pdi-material-pricing]]
|
||||
3. [[pdi-accubid-equipment]]
|
||||
|
||||
## Tabs
|
||||
|
||||
### `Job Info` - Job Info
|
||||
|
||||
Under **Dates and Duration**,
|
||||
click the radio button next to **Completion date:**.
|
||||
|
||||
**Duration:** <- Project duration months per BPM
|
||||
|
||||
### `DirLb` - Direct Labor
|
||||
|
||||
#### No Wage Requirements
|
||||
|
||||
"VOUCHER {Project Region}": **Crew** <- 1
|
||||
|
||||
#### Davis Bacon/Prevailing Wage
|
||||
|
||||
TODO
|
||||
|
||||
### `KeyInd` - Key Indicators
|
||||
|
||||
"Area" <- Number of Units
|
||||
|
||||
### `FnPrc` - Final Price
|
||||
|
||||
[[pdi-accubid-final-price]]
|
||||
|
||||
### `QtMat` - Quoted Material
|
||||
|
||||
[[pdi-accubid-quoted-material]]
|
||||
|
||||
### `Eqpmt` - Equipment
|
||||
|
||||
[[pdi-accubid-equipment]]
|
||||
|
||||
### `GenExp` - General Expenses
|
||||
|
||||
[[pdi-accubid-general-expenses]]
|
||||
|
||||
### `Subs` - Subcontractors
|
||||
|
||||
[[pdi-accubid-subcontractors]]
|
||||
|
||||
### `IndLb` - Indirect Labor
|
||||
|
||||
[[pdi-accubid-indirect-labor]]
|
||||
|
||||
### `IncLb` - Incidental Labor
|
||||
|
||||
> * "COMPOSITE CLEAN UP - PER HOUR"
|
||||
> * "MATERIAL HANDLER - PER MO"
|
||||
|
||||
Only if included in Base Bid.
|
||||
Confirm with [[pdi-estimating#Bid Estimating|Bid]] estimator.
|
||||
|
||||
@@ -8,14 +8,21 @@ tags:
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Equipment
|
||||
# PDI Accubid Closeout: Equipment
|
||||
|
||||
> [!important] Disclaimer
|
||||
> This is my interpretation of what is meant by the cost names,
|
||||
> not necessarily how each is used in practice.
|
||||
> To that, it appears many are not used at all.
|
||||
|
||||
Clear **Markup %** for all lines.
|
||||
|
||||
> [!tip]
|
||||
> Reference similar jobs for equipment allocation.
|
||||
> Total cost is expected to be ~1% of Base Bid
|
||||
|
||||
`SITE OFFICE TRAILER (per Month)`
|
||||
|
||||
As stated.
|
||||
|
||||
@@ -0,0 +1,45 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "PDI Accubid Closeout: Final Price"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout: Final Price
|
||||
|
||||
## Material Tax
|
||||
|
||||
**Calculated %** <- Cumulative sales tax at project address.
|
||||
|
||||
## Markup
|
||||
|
||||
Clear markup values from **Calculated %**:
|
||||
* "Database Material Markup"
|
||||
* "Quoted Material Markup"
|
||||
* "Labor Markup"
|
||||
* "Adjustment Markup"
|
||||
|
||||
Ensure markup was cleared from previous tabs:
|
||||
* "Subcontractors Markup"
|
||||
* "General Expenses Markup"
|
||||
* "Equipment Markup"
|
||||
|
||||
## Warranty
|
||||
|
||||
* **Modified ($)** <- $0.05 per gross area square foot
|
||||
|
||||
## CIP
|
||||
|
||||
Only if "CIP" is included in Base Bid.
|
||||
See proposal section "Insurance" if present.
|
||||
|
||||
**Modified ($)** <- $\frac{0.136}{100} \times \text{Contract Value}$
|
||||
|
||||
## Selling Price
|
||||
|
||||
**Modified ($)** <- Proposal Base Bid Total
|
||||
@@ -0,0 +1,56 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "PDI Accubid Closeout: General Expenses"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout: General Expenses
|
||||
|
||||
Clear **Markup %** for all lines.
|
||||
|
||||
## Inspection Permit
|
||||
|
||||
* **Field** <- "Area"
|
||||
* **Cost/Unit** <- per Bid Sheet tab "Add-On Items", line "Permits"
|
||||
|
||||
## Off-Site Parking
|
||||
|
||||
Only if included in proposal.
|
||||
|
||||
"OFF-SITE PARKING (per Month + per Car)":
|
||||
* **Field** <- "Duration Months"
|
||||
* **Quantity** <- Number of vehicles (subject to adjustment)
|
||||
|
||||
## Certified/Minority Business Enterprise (CBE/MBE)
|
||||
|
||||
TODO
|
||||
|
||||
## WBS Contingency
|
||||
|
||||
By [[pdi-building-types|building type]].
|
||||
|
||||
### High Density
|
||||
|
||||
%% dear lord %%
|
||||
|
||||
> do math to find 8.5% of production labor
|
||||
>
|
||||
> 1. Enter "DirLb" tab total for the region for the QTY
|
||||
> 2. Multiply that QTY by 0.085
|
||||
> 3. Subtract that answer by the HD total (the 9% math Accubid did)
|
||||
> 4. On the HR line below, enter the negative answer you just found
|
||||
> * This accounts for that missing 0.5% since Accubid can't do 3 decimals
|
||||
|
||||
==Alternate or line item on proposal==
|
||||
|
||||
### Garden Style, High Rise
|
||||
|
||||
In 'WBS CONTINGENCY - LABOR "{PDI Building Type}"':
|
||||
|
||||
* **Field** <- "DirLb Total"
|
||||
@@ -0,0 +1,80 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "PDI Accubid Closeout: Indirect Labor"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout: Indirect Labor
|
||||
|
||||
> [!info]
|
||||
> Note that **Hours** is used as a quantity,
|
||||
> not necessarily hours.
|
||||
|
||||
> [!important]
|
||||
> Always round _down_ when calculating duration.
|
||||
> (e.g. 90% of 32 months = 28 months)
|
||||
|
||||
## Office Labor
|
||||
|
||||
> * "OVERSIGHT (EVP, RVP's, LBR MGR & OPS DIR)"
|
||||
> * "PROJECT EXCUTIVE (1/12)"
|
||||
> * "PROJECT MANAGER GARDEN (1/5)"
|
||||
> * "PROJECT MANAGER HD (1/3)"
|
||||
> * "PROJECT MANAGER LESS THAN $20M (1/2)"
|
||||
> * "PROJECT MANAGER GREATER THAN $20M (1/1)"
|
||||
> * "ASSISTANT PM/PROJECT ENGINEER (1/2)"
|
||||
> * ~~"ASSISTANT PM/PROJECT ENGINEER (1/1)"~~
|
||||
|
||||
* **Hours** <- Project duration months per BPM
|
||||
|
||||
## Field Supervision
|
||||
|
||||
**Rate $** by project region.
|
||||
|
||||
### Superintendent
|
||||
|
||||
"SUPERINTENDENT ...": **Hours** <- 1
|
||||
|
||||
### Structural and Distribution Foremen
|
||||
|
||||
"STRUCTURAL FOREMAN {Region}": **Hours** <- Per Approved Labor Plan
|
||||
|
||||
"DISTRIBUTION FOREMAN ...":
|
||||
* **Hours** <- Per Approved Labor Plan
|
||||
* **Rate $** <- Match Structural Foreman
|
||||
|
||||
### Rough, Trim, and Other Foremen
|
||||
|
||||
Rename lines "ROUGH & TRIM FOREMAN ...":
|
||||
* "ROUGH ..."
|
||||
* "TRIM FOREMAN ..."
|
||||
* Any others shown on approved labor plan
|
||||
|
||||
* **Hours** <- Per Approved Labor Plan
|
||||
* **Rate $** <- Match Structural Foreman
|
||||
|
||||
### Low Voltage/Fire Alarm Foreman
|
||||
|
||||
> "LOW VOLTAGE/FIRE ALARM FOREMAN (1/4)"
|
||||
|
||||
* **Hours** <- Double months from PDI Systems Life Safety Proposal
|
||||
(e.g. 2 × "16 Months @ 25%" = 8 Months)
|
||||
|
||||
## Escalation
|
||||
|
||||
~~1% per year~~ TODO
|
||||
|
||||
## PDI Systems Fees
|
||||
|
||||
> * "FIRE ALARM - Flat Fee "
|
||||
> * "LOW VOLTAGE SYSTEMS - Flat Fee"
|
||||
> * "DAS - Flat Fee"
|
||||
|
||||
For each system included in Base Bid:
|
||||
* **Hours** <- 1
|
||||
@@ -0,0 +1,39 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "PDI Accubid Closeout: Quoted Material"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout: Quoted Material
|
||||
|
||||
> [!important]
|
||||
> Quoted material costs must be ==pre-tax==.
|
||||
|
||||
## Fixtures
|
||||
|
||||
* **Vendor** <- "PDR - {Quote Type}" (e.g. "PDR - Spec/Equal", "PDR - VE")
|
||||
* **Quote** <- Per PDI Systems proposal
|
||||
* **Notes** <- Quote date
|
||||
|
||||
> [!tip]
|
||||
> PDR fixture quotes are usually broken out by area type.
|
||||
> It is not necessary to preserve these breakdowns in the estimate.
|
||||
> Use the sum total cost in a single Quoted Materials line item.
|
||||
|
||||
## Switchgear
|
||||
|
||||
* **Vendor** <- Per quote (or "PDI BUDGET" if not available)
|
||||
* **Quote** <- Per quote (or Bid Sheet Budget if not available)
|
||||
* **Notes** <- Quote Date
|
||||
|
||||
## Generator
|
||||
|
||||
* **Vendor** <- Per quote (or "PDI BUDGET" if not available)
|
||||
* **Quote** <- Per quote (or Bid Sheet Budget if not available)
|
||||
* **Notes** <- Quantity, Size in kW, Quote Date
|
||||
@@ -0,0 +1,73 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: "PDI Accubid Closeout: Subcontractors"
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/closeout
|
||||
- status/incomplete
|
||||
- type/guide
|
||||
dg-publish: true
|
||||
---
|
||||
# PDI Accubid Closeout: Subcontractors
|
||||
|
||||
> [!important]
|
||||
> Subcontractor quotes ==must include tax==.
|
||||
|
||||
Clear **Markup %** for all lines.
|
||||
|
||||
## Quotes
|
||||
|
||||
Include all quotes from BPM.
|
||||
If system is not included in the base bid,
|
||||
set **Adjustment %** to -100%
|
||||
|
||||
### `TWO WAY COMMUNICATION`
|
||||
|
||||
* **Vendor** <- "PDI SYSTEMS"
|
||||
* **Quote** <- Per PDI Systems proposal
|
||||
* **Notes** <- Quote date
|
||||
|
||||
### `FIRE ALARM`
|
||||
|
||||
* **Vendor** <- "PDI SYSTEMS"
|
||||
* **Quote** <- Per PDI Systems proposal
|
||||
* **Notes** <- Quote date; # hours in quote
|
||||
|
||||
## Budgets
|
||||
|
||||
### `PDI ENGINEERING COORDINATION STUDIES`
|
||||
|
||||
Only if not included in switchgear quote.
|
||||
|
||||
### `EXCAVATION`
|
||||
|
||||
Only if we own primary conduit or Site Low Voltage Duct Bank:
|
||||
|
||||
* **Vendor** <- "PDI BUDGET"
|
||||
* **Quote** <- $10,000
|
||||
|
||||
### `WIREWAYS | TROUGHS | PULL BOXES`
|
||||
|
||||
* **Vendor** <- "PDI BUDGET"
|
||||
* **Quote** <- $10,000 per building (subject to adjustment)
|
||||
|
||||
### `FIRE STOP`
|
||||
|
||||
* **Vendor** <- "PDI BUDGET"
|
||||
* **Quote** <- $25 per Unit (subject to adjustment)
|
||||
|
||||
### `RIGGING`
|
||||
|
||||
* **Vendor** <- "PDI BUDGET"
|
||||
* **Quote** <- Sum of costs per generator:
|
||||
* _less than 800kW_ = $5k each
|
||||
* _800kW and larger_ = $10k each
|
||||
|
||||
### `FUEL`
|
||||
|
||||
* **Vendor** <- "PDI BUDGET"
|
||||
* **Quote** <- ...
|
||||
* _High Density:_ $5k
|
||||
* _High Rise:_ $10k
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[{{date:YYYY-MM-DD}}]]"
|
||||
weekly: "[[{{date:gggg-[W]WW}}]]"
|
||||
|
||||
@@ -7,7 +7,7 @@ tags:
|
||||
- destiny/permanent
|
||||
- status/complete
|
||||
- topic/estimating
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
---
|
||||
# 2025-11-21 10:11:??
|
||||
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
daily: "[[2026-01-31]]"
|
||||
dg-publish: true
|
||||
---
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/other
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
daily: "[[2026-01-31]]"
|
||||
dg-publish: true
|
||||
---
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/meta
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-02]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-02]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-03]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/estimating
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-03]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-03]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-04]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/organization
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-04]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-04]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-04]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/estimating
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-04]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-04]]"
|
||||
---
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-05]]"
|
||||
---
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- occupational/takeoff
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-05]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/construction/electrical
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-05]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-05]]"
|
||||
monthly: "[[2026-02]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/hobbies/reading
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-07]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/hobbies/reading
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-08]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
daily: "[[2026-02-09]]"
|
||||
dg-publish: true
|
||||
monthly: "[[2026-02]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-10]]"
|
||||
weekly: "[[2026-W07]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-10]]"
|
||||
weekly: "[[2026-W07]]"
|
||||
@@ -8,7 +8,7 @@ tags:
|
||||
- occupational
|
||||
- status/draft
|
||||
- type/minutes
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
daily: "[[2026-02-10]]"
|
||||
dg-publish: true
|
||||
monthly: "[[2026-02]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
daily: "[[2026-02-11]]"
|
||||
dg-publish: true
|
||||
monthly: "[[2026-02]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
- topic/construction/electrical
|
||||
daily: "[[2026-02-12]]"
|
||||
dg-publish: true
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-17]]"
|
||||
weekly: "[[2026-W08]]"
|
||||
@@ -6,7 +6,7 @@ tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- status/draft
|
||||
- type/periodic/timestamped
|
||||
- type/timestamped
|
||||
dg-publish: true
|
||||
daily: "[[2026-02-17]]"
|
||||
weekly: "[[2026-W08]]"
|
||||
@@ -160,6 +160,8 @@ For ADA units:
|
||||
|
||||
##### Additional Signaling Devices
|
||||
|
||||
* `System` = "FA - Fire Alarm"
|
||||
|
||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`UNIT HORN/STROBE - ...`
|
||||
|
||||
#### Key
|
||||
|
||||
Reference in New Issue
Block a user